You are on page 1of 4

Report on MPFS Inspection Revision: 1.

0
& Refurbishment Effective: April 2019

Report On
KCPP Multiport
Flow Selector &
Refurbishment
Proposal
Technical Evaluation Reports & Recommendations

Power & Energy Oil Tools Limited


April 2, 2019

Presented to:
WEST AFRICAN E&P

1|Page Quality | Performance | Reliability


Report on MPFS Inspection Revision: 1.0
& Refurbishment Effective: April 2019

Returned Goods Assessment Report MPFS Bonnet


Client: WAEP | Field: Kalaekule | Evaluator: Paul Odogbo ( Valve specialist)

Multiport Flow Selector – Severely corroded bonnet flange

Side view of MPFS Valve Assembly MPFS Bonnet broken off from MPFS Valve Body

Severely corroded bonnet Close-up view of severe corrosion on bonet

Recommendation Clean & Redress


1. Clean up bonnet flange to rid it of corrosion
2. Integrate into MPFS valve
3. Test, certify and redeploy to field

2|Page Quality | Performance | Reliability


Report on MPFS Inspection Revision: 1.0
& Refurbishment Effective: April 2019

Returned Goods Assessment Report MPFS Valve Trim


Client: Belema Oil | Field: Kalaekule | Evaluator: Paul Odogbo ( Valve specialist)

Multiport Flow Selector – Severely corroded flanges and valve trim

Deflanged MPFS with corroded and stiff plug MPFS Group Outlet flanges, studs and nuts

MPFS Valve trim with severe corrosion and stiff plug Severely corroded well inlet flanges, seals, studs and nuts

Recommendation Refurbish
1. Clean and refurbish valve assembly
2. Dissemble plug and seals for integrity tests
3. Change out severely corroded components
4. Install actuator or Manual Lever
5. Test, certify and redeploy to field

3|Page Quality | Performance | Reliability


Report on MPFS Inspection Revision: 1.0
& Refurbishment Effective: April 2019

Notes

 Inspection of Multiport Flow Selector successfully carried out at No Cost to WAEP.


 Inspected MPFS valve shall be returned to WAEP Base in Onne
 Kindly advise on the next course of action as we are ready to carry out repair and
refurbishment on the valves.
 Delivery Lead Time to Refurbish and redeploy 3 Multiport Flow Selector Valves: 2 Weeks
 Delivery Lead Time to Refurbish and redeploy 6 Multiport Flow Selector Valves: 4 Weeks
 Quotation for refurbishment shall be sent on request

4|Page Quality | Performance | Reliability