You are on page 1of 3

1 2 3 4 5

REVISION STATUS
FOUNDATION PLAN & DETAILS OF
DEGASSER (V-750)
BFS-2

PRIME SOURCE CONSTRUCTION


INFRASTRUCTURE LTD.

FOR STAIRCASE SEPARATE DRG WILL BE


PROVIDED STERLING OIL EXPLORATION & ENERGY
PRODUCTION CO. LTD.
(SEEPCO)
REVISION STATUS
FOUNDATION PLAN & DETAILS OF
DEGASSER (V-750)
BFS

PRIME SOURCE CONSTRUCTION


INFRASTRUCTURE LTD.

STERLING OIL EXPLORATION & ENERGY


PRODUCTION CO. LTD.
(SEEPCO)
1 2 3 4 5

C
This Horizontal beam should
be extended to mound the
saddle of the vessel 175mm
from the centre(Typ.)

F
This Horizontal beam should be
extended to mound the saddle
of the vessel 175mm from the ALL CONNECTIONS ARE
centre(Typ.) Column should be BOLTED CONNECTION.
connected below the beam.

REVISION STATUS
FOUNDATION PLAN & DETAILS OF
DEGASSER (V-750)
BFS

PRIME SOURCE CONSTRUCTION


INFRASTRUCTURE LTD.

STERLING OIL EXPLORATION & ENERGY


PRODUCTION CO. LTD.
(SEEPCO)

You might also like