Table of Contents
1. About the Survey
2. Goal beyond the Survey
3. Purpose of the Survey
4. Outline of the Survey
①To Grasp the Current Problems
②Effectiveness of the Proposed Product
③Study for an ODA project
5. Schedule of the Survey
6. Cooperation for the Survey
7. Project Plan in the Future

Copyright(C) 2016 Fukuyama consultant co., ltd . All rights reserved.


1
1. About the Survey

By utilizing various schemes, JICA collaborates with


Japanese private sectors to conduct ODA more
efficiently and effectively.

Japanese ODA Technical Proposal Based


Loan Grant Aid Cooperation Program

„ This survey is a proposal based program approved


by JICA.
„ This survey aims to step up the program into an
ODA project.
2
2. Goal beyond the Survey
Issues:Solid Waste Management is Open dumping

not going well

Model Case

Target:Composting with Compost equipment


Organic Land Reduction
Fertilizer →Yield Increase
Organic
Materials

Recycle
Plastics, etc.

Goal:Development to the province of Albay


3
3. Purpose of the Survey

① To grasp the current problems on Solid Waste


Management and Agriculture in Legazpi city and
Albay Province

② To verify effectiveness of the proposed product


• Composting organic materials with compost
equipment at Bicol University
• Analyzing the organic fertilizer and examining its
effectiveness

③ To study the feasibility of the project as ODA


• Role sharing for managing the product among
Legazpi city, Japanese private sector and JICA
• Considering the way of procuring secondary
materials and transporting fertilizer etc.
4
4. Outline of the Survey ①To grasp the current problems
Survey Field Survey Item Survey Subject

・Current condition of segregation,


collecting, composting, recycling
Solid Waste ・Waste volume and the capacity
Management of open dumpsites
・Materials Recovery Facility
・Policy
,Etc.

・Production volume by crops


・Yield
・Income of farmers
Agriculture ・Properties of the soil
・Market and distribution of
fertilizer
,Etc.

More details about current condition is needed.


5
4. Outline of the Survey ② Effectiveness of the Proposed product

What is the Proposed product?


Composting Waste to energy

By hand
Biogas power
the Proposed product generation

Compost facility Compost facility Biomass power


(Open type) (Closed type) generation

●Features:Processing volume is too much, processing costs is low


cost compared to other.
●Records: Founded 60 years
Domestic sales – over 10,000 unit
Export trade – Malaysia, Singapore, Taiwan, Korea, etc. 6
4. Outline of the Survey ② Effectiveness of the Proposed product
Secondary
●Spec: Product name
Processing
Volume※
Materials W×H Lane
Volume※
D-600-type4
H 0.5-1.0 0.5-2.0 34m
L (at Bicol University) 4.0m×0.6m
(Installed) m3/day m3/day ×1lane
D-1000-type6
20-30 20-60 48m
(at city of Legazpi) 6.0m×1.0m
(Under consideration) m3/day m3/day ×3lane

※There is a possibility of varying volume by moisture content, etc..
●Procedure To reflect results of examination at Bicol University.

Secondary Materials Input


(Primary fermentation)
Garbage Storage
(Secondary fermentation)
Flow
Land
Reduction

Manure
Total
Time 1day 20〜30days 30days
2months

Procuring
Condition Sorting Electric
(Organic
secondary Sieving
Materials) materials Power
(Rice husks, etc. )
7
4. Outline of the Survey ② Effectiveness of the Proposed product

To try composting by that product at Bicol Univ.


・Okadaʼs product (D600) has been installed at Bicol University.
→To transport actual garbage into the site and to try composting
→Analyzing the fertilizer to verify its effectiveness
(Some samples of Compost and microbial analysis)

●Site:Bicol University College of Agriculture and Forestry


●Implementation period:2016/12/7〜(To be scheduled)

Report Seminar scheduled to be held (2017.6)


8
●Layout Plan: Product name
Processing Secondary
W×H Lane
Volume※ Materials Volume※
0.5-1.0 0.5-2.0 34m
D-600-type4 4.0m×0.6m
m3/day m3/day ×1lane

Garbage
Output
Input

Composting machine
(220V, 3phase, 6.5kw)
※Operating time : 1.7hour/day

9
4. Outline of the Survey ② Effectiveness of the Proposed product

●Procedure and role sharing


Secondary Materials Input
(Primary fermentation)
Garbage Storage
(Secondary fermentation)
Flow
Land
Reduction

Manure

Sorting Procuring Electric


secondary power Analysis
Implem Collection ・Generator
materials
entation Transport ・Rice husks, coconut
Germination
items ation
beet, manure, etc..
Operation
test

11 kw/day
(30days)
5 m3/week 10 m3/week
Quantity (1week) (1week)
4sample
1⼈/day
(30days)

Role
sharing 10
4. Outline of the Survey ③ Study for an ODA project

Plan for project scheme


●Project scheme:Proposal Based Program (Verification Survey)
●Proposed product:Composting Machine “D1000-6type”
●Candidate site:Final disposal site at city of Legazpi

Fertilizer Managing and operating Garbage Ordinary


Framers
For sale or free the composting machinery citizen
(C/P: Legazpi) Cost of composting
Instruction
Promotion of organic farming ・Land development and construction
・Human resources and electric bill
Chaff, coconut
beet etc.
Bicol Framers
For sale or free
University Testing
Instruction
Agriculture
instructors
(C/P: Albay, Collaboration
Legazpi etc.) Collaborated
Organic
local company
farming Introducing the Partly consigning the
Technical product production
support Technical support

Okada Manufactory Co., Ltd

11
●Layout(draft): Product name
Processing Secondary
W×H Lane
Volume※ Materials Volume※
20-30 20-60 48m
D-1000-type6 6.0m×1.0m
m3/day m3/day ×3lane
Composting machine
(220V, 3phase, 14kw) Assumed scale: 4,000 m2
※Operating time : 12hour/day
※168kw/day
Garbage

Input
Output

45.5m

Storage

75m 12
●Product drawing:D-1000- type6

13
●Plan view(draft):3Lane

14
●Front view(draft):Building

15
4. Outline of the Survey ③ Study for an ODA project

For disseminating organic fertilizer

Investigate the following for distribution of organic fertilizer and


agricultural developing

●Market of fertilizer

●Policy of disseminating organic fertilizer

●A channel of distribution of organic fertilizer produced

●Promotion of organic farming

16
4. Outline of the Survey ③ Study for an ODA project

Role sharing for ODA project


Planning the role sharing for ODA project clearly is important.
C/P JICA ・Okada Manufactory
Installation site Legazpi city
Land development and
Legazpi city
construction

Product installation ※Grant Aid Production and installation

Separating and sorting


of garbage ※Managing and instructing
Legazpi city
Human resources and during the project.
administrative cost
Secondary materials
Legazpi city
procurement
Sale and distribution of
Legazpi city
fertilizer
Study to improve Bicol University
※Supporting during the project.
composting system (plus others)
Promotion of organic Legazpi city, Albay province, ※Further supporting after the
farming Bicol University, etc. project.
▲Assumed role sharing in ODA project
17
5. Schedule of the Survey
Year/month Activities Agencies to visit
・Public hearings ・Legazpi city
1st 2016/10 ・Preparation for composting and ・Bicol University
(7 days) analysis ・Related organizations
・Market and regulations research ・JICA etc.

・Legazpi city
2nd 2016/12
・Kick off seminar ・Bicol University
(14 days) ・Related organizations

3rd 2017/2 ・Discussion on the ODA project ・Legazpi city


・Bicol University
(7 days) ・Market research ・Communities in Albay

※ 2017/4 ・Acceptance of C/P ・Okada Manufactory


(5 days) (3 person) ・Recycle center in Motegi town

・Discussion on the framework of the ・Legazpi city


4th 2017/5 ODA project ・Bicol University
(7 days) (Minutes of meeting) ・Agricultural organizations

・Legazpi city
5th 2017/6 ・Survey reports ・Bicol University
(7 days) (Holding seminars) ・Related organizations
・JICA etc.
18
6. Cooperation for the Survey

Legazpi city(C/P)
Okada Manufactory Co., Ltd Bicol University
・Survey planning /implementation Counter part Albay province
・Business planning DENR, DOA
Support for ・Analysis
the survey ・Study for project
scheme
Fukuyama Consultants Co., Ltd*
・ Support for the survey

Hoshiken Co., Ltd* EN2 Plus Ltd* CoCo Technologies


・ Technical ・ Technical Co.
support for support for Partner company
Support for
farming farming the survey
*External human resources

19
7. Project Plan in the Future

Year 2016 Year 2017 Year 2018

Development to

Feasibility Survey

Kick off seminar Report seminar


(2016.12) (2017.6)

Proposal for
dissemination and
verification

JICA will carry out


the program
Installing the proposed product at the final
disposal sites, and inspecting the effects. 20