Professional Documents
Culture Documents
地上部分电缆预留端接长度
Pile桩 0.4
Inverter逆变器 0.3
Communication Box
0.5
(Metrological Station)通讯箱
Weather Station气象站 0.5
Grounding Cable
PV Skid箱变 3.6
接地铜线
Fencing围墙 0.5
Lighting Pole灯杆 0.4
PDL送出线路 1.2 to 2
Diesel Generator柴发 TBD
Water Treatment System水处理系统 TBD
NA
NA
According to site condition
NA
NA
Shall refer to Annex 3-MV Cable List and consider
the reserved length
Shall refer to PDL detail drawings and consider the
reserved length
Shall refer to detail drawing
Shall refer to detail drawing
Remarks
备注