Professional Documents
Culture Documents
GPS/181023
System Description No of Unit. Per Unit Cars Total Cars
SIGN : DATE :
:-Panchpakhadi.
GPS-1G1 10 Units 03 Cars 30 Cars
THIS DRAWING IS PREPARED BASED ON THE
Structure Tower Parking 01 Unit 89 Cars 89 Cars ARCHITECTS DRAWING. DETAILED DRAWING IS
PREPARED BASED ON ACTUAL SITE CONDITION
DATE 05.02.24 R3
AND ORDER CONFIRMATION. FIRE FIGHTING
EQUIPMENT AND OTHER SERVICES NOT DRN. BY Pankaj
CONSIDERED. PLEASE REFER OUR DATASHEET FOR
DETAIL INFORMATION. INSTALLATION SHALL BE CKD. BY Rohit SHEET NO
DONE BASED ON ACTUAL SITE CONDITION AT THE
119 Cars TIME OF INSTALLATION. SCALE 1:100 01
PLOT BUNDARY
SUB STATION
TO BE RELOCATED
WELL
GPS-1G1
GPS-1G1
ENTRY
ENTRY
PARK
PARK
PARK
LIFT
GPS-1G1
GPS-1G1
ENTRY
ENTRY
4.85 [15'-11"]
STRETCHER
LIFT
1.85 X 2.55
6' X 8'6"
GPS-1G1
ENTRY
ENTRANCE
LOBBY
7.00 x 3.05 M
23'0" x 10'0"
5.16 [16'-11"]
12 M
WID
LIFT LOBBY
6 FT WIDE
EB
LIFT LIFT
2.05 X 2.05 X
D
GPS-1G1
ENTRY
1.85 M 1.85 M
6'9" X 6' 6'9" X 6'
HA
ROA
SPACE FOR
SWM
4.77 [15'-8"]
KA
NG
TI M
GPS-1G1 GPS-1G1
STI
AN
EXI
DIR
GPS-1G1 GPS-1G1
E
WID
ENTRY ENTRY
MA
RG
9M
ENTRY ENTRY
5.98 [19'-7"]
ELECTRIC
SUBSTATION
RELOCATED