INDUSTRIAL PARK DEVELOPMENT CORPORATION

ADAMA INDUSTRIAL PARK


Engineering And Maintenance departement
Daily inspection check list for Shed #1(1-5/1/2024
Day
Descriptions
No. Mo Tue Wed Thur Fir Remark
1 Transformer
Phase A 33.9 32.2 33.9 33.3 33.6
Winding TEMP °C Phase B 31.4 31.2 31.8 33 33.3
Phase C OP OP OP OP OP
Fan(run manually for a while) R R R R R
Abnormal sounds And smells R R R R R
2 RMU
SF6 gas pressure gauge R R R R R
power indicator lamp R R R R R
Abnormal sounds And smells R R R R R
3 MV Room
Axial fan R R R R R
Cleanliness R R R R R
4 LV Room
Main ACB R R R R R
Capacitor bank R R R R R
Measuring device and LED R R R R R
Axial fan R R R R R
Cleanliness R R R R R
L1-2 385.1 381.2 379.4 380.4 380
voltage L2-3 384.4 384 379 379.8 379.4
in Volt L1-3 383.6 382 378.7 379.2 378.4
Meter
I1 0 0 0 0 0
reading
Current I2 2 1 3 3 3
in A I3 3 2 11 2 2
Power Factor 0.92 0.91 0.94 0.89 0.96
5 Lighting systems
Working area R R R R R
Offices R R R R R
Toilet R R R R R
MV Room R R R R R
LV Room R R R R R
6 Air Conditioner R R R R R
7 Server room R R R R R
8 Mic and speaker there is no MIC and Speaker
9 UPS there is no UPS
Battery voltage
Ventilation
10 Shutter doors R R R R R
Note:- R in good status T in bad status
Inspected by:Yibeltal Abebe Approved by:- Dawit Lemma
Signature:-_________ Signature:-
Date:-6-1-2024 Date:-6-1-2024

INDUSTRIAL PARK DEVELOPMENT CORPORATION


ADAMA INDUSTRIAL PARK
Engineering And Maintenance departement
Daily inspection check list for Shed #7(1-5/1/2024)
Day
Descriptions
No. Mo Tue Wed Thur Fir Remark
1 Transformer
Phase A 37.2 37.6 37.9 37.4 40.5
Winding TEMP °C Phase B 38.6 39.4 39 38.7 51.1
Phase C 39.7 41.1 42.3 40.3 53.6
Fan(run manually for a while) R R R R R
Abnormal sounds And smells R R R R R
2 RMU
SF6 gas pressure gauge R R R R R
power indicator lamp R R R R R
Abnormal sounds And smells R R R R R
3 MV Room
Axial fan R R R R R
R R R R R
Cleanliness
4 LV Room
Main ACB R R R R R
Capacitor bank R R R R R
Measuring device and LED R R R R R
Axial fan R R R R R
Cleanliness R R R R R
L1-2 382.5 381.3 379.4 381.6 381.3
voltage L2-3 381.7 380.3 378.9 380.5 380.3
in Volt L1-3 381 380 379.4 380 380
Meter
I1 74 86 78 90 86
reading
Current I2 69 89 79 92 89
in A I3 69 89 86 90 89
Power Factor 0.97 0.99 0.96 0.96 0.97
5 Lighting systems
Working area R R R R R
Offices R R R R R
Toilet R R R R R
MV Room R R R R R
LV Room R R R R R
6 Air Conditioner R R R R R
7 Server room R R R R R
8 Mic and speaker R R R R R
9 UPS
Battery voltage R R R R R
Ventilation R R R R R
10 Shutter doors R R R R R
Note:- R in good status T in bad status
Inspected by:Yibeltal Abebe Approved by:- Dawit Lemma
Signature:-_________ Signature:-
Date:-6-1-2024 Date:-6-1-2024

INDUSTRIAL PARK DEVELOPMENT CORPORATION


ADAMA INDUSTRIAL PARK
Engineering And Maintenance departement
Daily inspection check list for Shed #8(1-5/2023)
Day
Descriptions
No. Mo Tue Wed Thur Fir Remark
Transformer 4
Phase A 48.2 48.8 47.5 48.7 47.9
Winding TEMP in
Phase B 36 36.1 54.6 54.3 54
1 °C
Phase C 65.2 65.9 53.8 54.2 53.4
Fan(run manually for a while) R R R R R
Abnormal sounds And smells R R R R R
2 RMU
SF6 gas pressure gauge R R R R R
power indicator lamp R R R R R
Abnormal sounds And smells R R R R R
3 MV Room
Axial fan R R R R R
Cleanliness R R R R R
4 LV Room
Main ACB R R R R R
Capacitor bank R R R R R
Measuring device and LED R R R R R
Axial fan R R R R R
Cleanliness R R R R R
L1-2 381.3 380.7 380.4 379.7 381.7
voltage L2-3 379.7 380.1 379.8 378.8 381
in Volt
Meter
reading
voltage
in Volt L1-3 379.3 379.7 379.2 378.4 380.1
Meter
I1 210 58 206 187 190
reading
Current I2 194 57 179 166 153
in A I3 188 40 220 208 195
Power Factor 0.97 0.96 0.99 0.99 0.98
5 Lighting systems
Working area R R R R R
Offices R R R R R
Toilet R R R R R
MV Room R R R R R
LV Room R R R R R
6 Air Conditioner R R R R R
7 Server room R R R R R
8 Mic and speaker R R R R R
9 UPS UPS is working in bypass mode
Battery voltage
Ventilation R R R R R
10 Shutter R
doorsconnection of D25 sensing R R R R
Due to lose cable the winding temprature of phase C is higher. By
Remark making corrective maintenance we fixed it
.
Note:- R in good status T in bad status
Inspected by:Yibeltal Abebe Approved by:- Dawit Lemma
Signature:-_________ Signature:-
Date:-6-1-2024 Date:-6-1-2024

INDUSTRIAL PARK DEVELOPMENT CORPORATION


ADAMA INDUSTRIAL PARK
Engineering And Maintenance departement
Daily inspection check list for Waste water treatment plant (ZLD) (1-5/2023)
Day
Descriptions Remark
S.N Mo Tue Wed Thur Fir
1 Transformer
Winding temprature in °C 55 55 55
Oil tempratrure in °C 55 55 55
Oil leakage R R R
Tap position 11 11 11

Oil level Bteween 1/2 Bteween Bteween


& 3/4 1/2 & 3/4 1/2 & 3/4
Cleanliness of silica gel R R R
Abnormal sounds And smells R R R
2 RMU
SF6 gas pressure gauge R R R
Power indicator R R R
Abnormal sounds And smells R R R
3 MV Room
exhaust fan R R R
Cleanliness R R R
L1-2 31.72 31.55 31.62
Voltage L2-3 31.5 31.72 31.8
Meter in kv L1-3 31.7 31.78 31.86
reading
Avg 31.64 31.68 31.76
Power Factor 1 1 1
4 LV Room
Main ACB R R R
Capacitor bank
Cleanliness R R R
L1-2 392.3 390.28 391.25
voltage
L2-3 391.5 393.78 394.57
in Volt
L1-3 391.2 391.48 392.57
Meter
L1 543.5 559.88 557.97
reading Current
L2 554.7 583.29 586.54
in A
L3 543.56 577.77 584.42
Power Factor 0.89 0.89 0.87
5 Lighting systems
MV Room R R R
PCC Room R R R
1.Transformer protection relay 7SR10 over current and earth fault realy is not working for all
Remark transformers. 2 SF6 gas level for boiler incoming compartement one ,Transformer
two,three,six & seven compartement is low.
Inspected by:Yibeltal Abebe Approved by:- Dawit Lemma
Signature:-_________ Signature:-
Date:-6-1-2024 Date:-6-1-2024
Shed#1 SHED#1 Last day LV meter reading
Last Day temprature controller reading
Current
Phase A

Phase B
Voltage

Phase C

RMU last day picture Compnes


ation
bank

SF6 gas
Ameter/
volt
meter
reading

potential
indicator

Relay
SHED#7 Shed#7
Last day temprature controller reading Last day LV meter reading

Phase A
current

Phase B

voltage

Phase C
Last day RMU Picture

SF6 gas Compens


ator bank

Ameter/
volt
meter
reading
potential
indicator
Last day UPS picture

UPS

Relay
SHED#8 SHED#8
Last day temprature controller reading Last day LV meter reading

Phase A
current

Phase B
Voltage

Phase C
Last day RMU Picture Compens
ator bank

SF6 gas

Ameter/
Voltmete
r reading
Potentail
indicator

Relay

Last day UPS picture

UPS
UPS

waste water treatement plant (ZLD)


waste water treatement plant (ZLD) Last day LV meter reading
Last day transformer winding and oil level indicator
winding
Temp.in
dicator Current
Oil levl
Temp.in
dicator
Trafo Oil
level
Indicator

Voltage
Taping
postion
indicator
Last day RMU Picture/SF6 Gas indicator picture
SF6 gas Last day MV reading
Trafo.
two
Voltage
SF6 gas Voltage
Trafo.
Three
SF6 gas Tap
Trafo. position
Six indicatio
SF6 gas n
Trafo.
Seven
LV meter reading
ed#7
reading
ED#8
reading
treatement plant (ZLD)
eading

MV reading

You might also like