INDUSTRIAL PARK DEVELOPMENT CORPORATION SHED #1 Last day LV meter reading/Shed#1
ADAMA INDUSTRIAL PARK Last day temprature controller reading
Engineering And Maintenance departement current Daily inspection check list for Shed #1(25-29/12/2023 Phse A Day Descriptions No. Mo Tue Wed Thur Fir Remark 1 Transformer Phase B Phase A 32.2 34.6 40.4 35 33.2 Voltage Winding TEMP °C Phase B 31.4 33.3 34.5 33.3 31.9 Phase C OP OP OP OP OP Phase C Fan(run manually for a while) R R R R R Abnormal sounds And smells R R R R R Last day RMU picture 2 RMU Compens SF6 gas pressure gauge R R R R R ator bank power indicator lamp R R R R R SF6 gas Abnormal sounds And smells R R R R R 3 MV Room Axial fan R R R R R Cleanliness R R R R R 4 LV Room Ameter/v Main ACB R R R R R olt meter Capacitor bank R R R R R reading Measuring device and LED R R R R R Potential Axial fan R R R R R indicator Cleanliness R R R R R L1-2 383.9v 384.9v 387.5v 382v 384.1v voltage in L2-3 383.3v 384.3v 386.7v 380.7v 383.5v protection Volt L1-3 382.6v 383.9v 386.3v 380v 382.8v relay Meter I1 34A 0 2A 42A 39A reading Current in I2 35A 2A 2A 47A 35A A I3 34A 6A 9 46A 39A Power Factor 0.43 1 0.98 0.65 1 5 Lighting systems Working area R R R R R Offices R R R R R Toilet R R R R R MV Room R R R R R LV Room R R R R R 6 Air Conditioner R R R R R 7 Server room R R R R R 8 Mic and speaker there is no MIC and Speaker 9 UPS there is no UPS Battery voltage Ventilation 10 Shutter doors R R R R R 1.The operating power factor of plasic recycling mchine is poor. Remark 2.Due to lack of raw materials the company is not working Note:- R in good status T in bad status Inspected by:Yibeltal Abebe Approved by:- Dawit Lemma Signature:-_________ Signature:- Date:-1-1-2024 Date:-1-1-2024 SHED #7 SHED#7 INDUSTRIAL PARK DEVELOPMENT CORPORATION Last day temprature controller reading Last day LV meter reading ADAMA INDUSTRIAL PARK Engineering And Maintenance departement Current Phse A Daily inspection check list for Shed #7(25-29/12/2023 Day Descriptions No. Mo Tue Wed Thur Fir Remark Phase B 1 Transformer Phase A 37.3 37.5 37.8 37.2 37.3 Voltage Winding TEMP °C Phase B 41.3 39.7 51.2 38.3 38.7 Phase C Phase C 45.7 44.3 48.2 40 40.1 Compens Fan(run manually for a while) R R R R R Last day RMU picture ator bank Abnormal sounds And smells R R R R R 2 RMU SF6 gas pressure gauge R R R R R SF6 gas power indicator lamp R R R R R Abnormal sounds And smells R R R R R 3 MV Room Axial fan R R R R R Cleanliness R R R R R Ameter/v 4 LV Room olt meter Main ACB R R R R R reading Capacitor bank R R R R R Potential Measuring device and LED R R R R R indicator Axial fan R R R R R Cleanliness R R R R R L1-2 381.7V 383.7 384.2V 377.8V 386.8V protection voltage in L2-3 379.5V 382.3 383.4V 377.2V 385.7V relay Volt L1-3 379V 381.7 383V 376.8V 384.9V Meter I1 72A 68A 81A 53A 88A reading Current in I2 73A 54A 85A 54A 89A Last day UPS picture A I3 70A 59A 87A 55A 86A Power Factor 0.93 0.94 0.93 0.92 0.99 UPS 5 Lighting systems Working area R R R R R Offices R R R R R Toilet R R R R R MV Room R R R R R LV Room R R R R R 6 Air Conditioner R R R R R 7 Server room R R R R R 8 Mic and speaker R R R R R 9 UPS Battery voltage R R R R R Ventilation R R R R R 10 Shutter doors R R R R R Note:- R in good status T in bad status Inspected by:Yibeltal Abebe Approved by:- Dawit Lemma Signature:-_________ Signature:- Date:-1-1-2024 Date:-1-1-2024 SHED#8 SHED#8 INDUSTRIAL PARK DEVELOPMENT CORPORATION Last day temprature controller reading Last day LV meter reading ADAMA INDUSTRIAL PARK Engineering And Maintenance departement Phase A Daily inspection check list for Shed #8(25-29/12/2023 Current Day Descriptions No. Mo Tue Wed Thur Fir Remark Phase B Transformer Phase A 55.5 53.4 48.5 51.2 Winding TEMP in Voltage Phase B 34.8 33.4 34 36.5 Phase C 1 °C Phase C 62.7 72.5 66.7 64.8 Fan(run manually for a while) R R R R Last day RMU picture Abnormal sounds And smells R R R R 2 RMU SF6 gas compensa SF6 gas pressure gauge R R R R tor bank power indicator lamp R R R R Ameter/ Abnormal sounds And smells R R R R Volt 3 MV Room meter Axial fan R R R R Potential Cleanliness R R R R indicator 4 LV Room Main ACB R R R R Capacitor bank R R R R Relay Measuring device and LED R R R R Axial fan R R R R Cleanliness R R R R Last day UPS picture L1-2 382V 381V 380.3 384V voltage in L2-3 381.7V 380.2V 379.5 383.6V UPS Volt L1-3 380.5V 379.9V 378.8 382.8V Meter I1 217A 251A 236A 214A reading Current in I2 189A 250A 210A 191A A I3 210A 271A 244A 237A Power Factor 0.97 0.99 0.98 0.98 5 Lighting systems Working area R R R R Offices R R R R Toilet R R R R MV Room R R R R LV Room R R R R 6 Air Conditioner R R R R 7 Server room R R R R 8 Mic and speaker R R R R 9 UPS UPS is working in bypass mode Battery voltage Ventilation R R R R 10 Shutter doors R R R R Remark Transformer needs off load inspection winding temprature of phase C higher than other phases. Note:- R in good status T in bad status Inspected by:Yibeltal Abebe Approved by:- Dawit Lemma Signature:-_________ Signature:- Date:-1-1-2024 Date:-1-1-2024 Waste water treatment plant(zero liquid Discharge ) plant last day inspection pictures Last day transformer three temprature picture Last day LV meter reading INDUSTRIAL PARK DEVELOPMENT CORPORATION ADAMA INDUSTRIAL PARK Engineering And Maintenance departement Daily inspection check list for Waste water treatment plant (ZLD) (25-29/12/2023) Current Day Descriptions Remark S.N Mo Tue Wed Thur Fir 1 Transformer Winding temprature in °C 55 55 Oil tempratrure in °C 55 55 Winding Oil leakage R R and oil Tap position 11 11 tempratur Voltage Betewen1 Betewen1/ e Oil level /2 &3/4 2 &3/4 Cleanliness of silica gel R R Abnormal sounds And smells R R Last day MV reading 2 RMU SF6 gas pressure gauge R R Low Power indicator R R Voltage Abnormal sounds And smells R R 3 MV Room exhaust fan R R Cleanliness R R Tap L1-2 31.44 31.77 Transfor position Voltage Meter L2-3 31.91 31.83 mer oil indication in kv reading L1-3 31.3 31.88 level Power Factor 1 1 4 LV Room Main ACB R R Capacitor bank Capacitor bank componesation system is not active Last day RMU picture Cleanliness R R 394.15 394.52 voltage in L1-2 SF6 gas Volt L2-3 397.86 397.67 L1-3 395.77 396.12 Meter reading 430.71 178.53 Current in L1 power A L2 452.41 180.66 indicator L3 456.21 177.6 Power Factor 0.9 0.89 5 Lighting systems MV Room R R PCC Room R R 1.All transformers required painting work 2.wasted energy can be avoided if the contractor completes unfinished capacitor bank installation Remark works. 3. By giving power supply to Elite 440 three phase digital meter can be checked load status of the waste water treatment plant and took readings. Note:- R in good status T in bad status Inspected by:Yibeltal Abebe Approved by:- Dawit Lemma Signature:-_________ Signature:- Date:-1-1-2024 Date:-1-1-2024