INDUSTRIAL PARK DEVELOPMENT CORPORATION SHED #1 Last day LV meter reading/Shed#1

ADAMA INDUSTRIAL PARK Last day temprature controller reading


Engineering And Maintenance departement
current
Daily inspection check list for Shed #1(25-29/12/2023
Phse A
Day
Descriptions
No. Mo Tue Wed Thur Fir Remark
1 Transformer
Phase B
Phase A 32.2 34.6 40.4 35 33.2 Voltage
Winding TEMP °C Phase B 31.4 33.3 34.5 33.3 31.9
Phase C OP OP OP OP OP Phase C
Fan(run manually for a while) R R R R R
Abnormal sounds And smells R R R R R Last day RMU picture
2 RMU Compens
SF6 gas pressure gauge R R R R R ator bank
power indicator lamp R R R R R
SF6 gas
Abnormal sounds And smells R R R R R
3 MV Room
Axial fan R R R R R
Cleanliness R R R R R
4 LV Room Ameter/v
Main ACB R R R R R olt meter
Capacitor bank R R R R R reading
Measuring device and LED R R R R R Potential
Axial fan R R R R R indicator
Cleanliness R R R R R
L1-2 383.9v 384.9v 387.5v 382v 384.1v
voltage in L2-3 383.3v 384.3v 386.7v 380.7v 383.5v protection
Volt L1-3 382.6v 383.9v 386.3v 380v 382.8v relay
Meter
I1 34A 0 2A 42A 39A
reading
Current in I2 35A 2A 2A 47A 35A
A I3 34A 6A 9 46A 39A
Power Factor 0.43 1 0.98 0.65 1
5 Lighting systems
Working area R R R R R
Offices R R R R R
Toilet R R R R R
MV Room R R R R R
LV Room R R R R R
6 Air Conditioner R R R R R
7 Server room R R R R R
8 Mic and speaker there is no MIC and Speaker
9 UPS there is no UPS
Battery voltage
Ventilation
10 Shutter doors R R R R R
1.The operating power factor of plasic recycling mchine is poor.
Remark 2.Due to lack of raw materials the company is not working
Note:- R in good status T in bad status
Inspected by:Yibeltal Abebe Approved by:- Dawit Lemma
Signature:-_________ Signature:-
Date:-1-1-2024 Date:-1-1-2024
SHED #7 SHED#7
INDUSTRIAL PARK DEVELOPMENT CORPORATION Last day temprature controller reading Last day LV meter reading
ADAMA INDUSTRIAL PARK
Engineering And Maintenance departement Current
Phse A
Daily inspection check list for Shed #7(25-29/12/2023
Day
Descriptions
No. Mo Tue Wed Thur Fir Remark
Phase B
1 Transformer
Phase A 37.3 37.5 37.8 37.2 37.3 Voltage
Winding TEMP °C Phase B 41.3 39.7 51.2 38.3 38.7 Phase C
Phase C 45.7 44.3 48.2 40 40.1 Compens
Fan(run manually for a while) R R R R R Last day RMU picture ator bank
Abnormal sounds And smells R R R R R
2 RMU
SF6 gas pressure gauge R R R R R
SF6 gas
power indicator lamp R R R R R
Abnormal sounds And smells R R R R R
3 MV Room
Axial fan R R R R R
Cleanliness R R R R R Ameter/v
4 LV Room olt meter
Main ACB R R R R R reading
Capacitor bank R R R R R Potential
Measuring device and LED R R R R R indicator
Axial fan R R R R R
Cleanliness R R R R R
L1-2 381.7V 383.7 384.2V 377.8V 386.8V protection
voltage in L2-3 379.5V 382.3 383.4V 377.2V 385.7V relay
Volt L1-3 379V 381.7 383V 376.8V 384.9V
Meter
I1 72A 68A 81A 53A 88A
reading
Current in I2 73A 54A 85A 54A 89A Last day UPS picture
A I3 70A 59A 87A 55A 86A
Power Factor 0.93 0.94 0.93 0.92 0.99
UPS
5 Lighting systems
Working area R R R R R
Offices R R R R R
Toilet R R R R R
MV Room R R R R R
LV Room R R R R R
6 Air Conditioner R R R R R
7 Server room R R R R R
8 Mic and speaker R R R R R
9 UPS
Battery voltage R R R R R
Ventilation R R R R R
10 Shutter doors R R R R R
Note:- R in good status T in bad status
Inspected by:Yibeltal Abebe Approved by:- Dawit Lemma
Signature:-_________ Signature:-
Date:-1-1-2024 Date:-1-1-2024
SHED#8 SHED#8
INDUSTRIAL PARK DEVELOPMENT CORPORATION Last day temprature controller reading Last day LV meter reading
ADAMA INDUSTRIAL PARK
Engineering And Maintenance departement Phase A
Daily inspection check list for Shed #8(25-29/12/2023 Current
Day
Descriptions
No. Mo Tue Wed Thur Fir Remark Phase B
Transformer
Phase A 55.5 53.4 48.5 51.2
Winding TEMP in Voltage
Phase B 34.8 33.4 34 36.5 Phase C
1 °C
Phase C 62.7 72.5 66.7 64.8
Fan(run manually for a while) R R R R Last day RMU picture
Abnormal sounds And smells R R R R
2 RMU SF6 gas compensa
SF6 gas pressure gauge R R R R tor bank
power indicator lamp R R R R Ameter/
Abnormal sounds And smells R R R R Volt
3 MV Room meter
Axial fan R R R R Potential
Cleanliness R R R R indicator
4 LV Room
Main ACB R R R R
Capacitor bank R R R R Relay
Measuring device and LED R R R R
Axial fan R R R R
Cleanliness R R R R Last day UPS picture
L1-2 382V 381V 380.3 384V
voltage in L2-3 381.7V 380.2V 379.5 383.6V
UPS
Volt L1-3 380.5V 379.9V 378.8 382.8V
Meter
I1 217A 251A 236A 214A
reading
Current in I2 189A 250A 210A 191A
A I3 210A 271A 244A 237A
Power Factor 0.97 0.99 0.98 0.98
5 Lighting systems
Working area R R R R
Offices R R R R
Toilet R R R R
MV Room R R R R
LV Room R R R R
6 Air Conditioner R R R R
7 Server room R R R R
8 Mic and speaker R R R R
9 UPS UPS is working in bypass mode
Battery voltage
Ventilation R R R R
10 Shutter doors R R R R
Remark Transformer needs off load inspection winding temprature of phase C higher than other phases.
Note:- R in good status T in bad status
Inspected by:Yibeltal Abebe Approved by:- Dawit Lemma
Signature:-_________ Signature:-
Date:-1-1-2024 Date:-1-1-2024 Waste water treatment plant(zero liquid Discharge ) plant last day inspection pictures
Last day transformer three temprature picture Last day LV meter reading
INDUSTRIAL PARK DEVELOPMENT CORPORATION
ADAMA INDUSTRIAL PARK
Engineering And Maintenance departement
Daily inspection check list for Waste water treatment plant (ZLD) (25-29/12/2023) Current
Day
Descriptions Remark
S.N Mo Tue Wed Thur Fir
1 Transformer
Winding temprature in °C 55 55
Oil tempratrure in °C 55 55 Winding
Oil leakage R R and oil
Tap position 11 11 tempratur Voltage
Betewen1 Betewen1/ e
Oil level
/2 &3/4 2 &3/4
Cleanliness of silica gel R R
Abnormal sounds And smells R R Last day MV reading
2 RMU
SF6 gas pressure gauge R R Low
Power indicator R R Voltage
Abnormal sounds And smells R R
3 MV Room
exhaust fan R R
Cleanliness R R Tap
L1-2 31.44 31.77 Transfor position
Voltage
Meter L2-3 31.91 31.83 mer oil indication
in kv
reading L1-3 31.3 31.88 level
Power Factor 1 1
4 LV Room
Main ACB R R
Capacitor bank Capacitor bank componesation system is not active Last day RMU picture
Cleanliness R R
394.15 394.52
voltage in L1-2 SF6 gas
Volt L2-3 397.86 397.67
L1-3 395.77 396.12
Meter
reading 430.71 178.53
Current in L1 power
A L2 452.41 180.66 indicator
L3 456.21 177.6
Power Factor 0.9 0.89
5 Lighting systems
MV Room R R
PCC Room R R
1.All transformers required painting work
2.wasted energy can be avoided if the contractor completes unfinished capacitor bank installation
Remark works.
3. By giving power supply to Elite 440 three phase digital meter can be checked load status of the
waste water treatment plant and took readings.
Note:- R in good status T in bad status
Inspected by:Yibeltal Abebe Approved by:- Dawit Lemma
Signature:-_________ Signature:-
Date:-1-1-2024 Date:-1-1-2024