Service Bulletin
Number: MD80-71-095
Date: November 12, 2004
Revision 1 January 31, 2005
ATA System: 7100
SUBJECT: POWER PLANT - Power Plant - General - Change JT8D-217C Engines to JT8D-219
Engines
Boeing claims copyright in each page of this document only to the extent that the page contains copyrightable
subject matter. Boeing also claims copyright in this document as a compilation and/or collective work.
This document includes proprietary information owned by The Boeing Company and/or one or more third
parties. Treatment of the document and the information it contains is governed by contract with Boeing. For
more information, contact The Boeing Company, P.O. Box 3707, Seattle, Washington 98124.
Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, BBJ, DC-8, DC-9,
DC-10, MD-10, MD-11, MD-80, MD-88, MD-90, and the red-white-and-blue Boeing livery are all trademarks
owned by The Boeing Company; and no trademark license is granted in connection with this document unless
provided in writing by Boeing.
BLANK PAGE
BLANK PAGE
November 12, 2004
Revision 1 January 31, 2005 MD80-71-095
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 2 of 22
BOEING SERVICE BULLETIN MD80-71-095
Table of Contents
Revision Transmittal Sheet . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
Summary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
1. PLANNING INFORMATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
A. Effectivity . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
1. Airplanes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
2. Spares Affected . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
B. Concurrent Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
C. Reason . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
D. Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
E. Compliance. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
F. Approval . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14
G. Manpower . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14
H. Weight and Balance Changes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14
I. Electrical Load Data . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14
J. References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14
1. Existing Data: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14
2. Data supplied with this Service Bulletin: . . . . . . . . . . . . . . . . . . . . . . . . . 15
3. Installation Drawings Used in the Preparation of this Service Bulletin: . . . . . . . . . . 15
4. Process Data: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15
K. Publications Affected . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15
L. Interchangeability and Intermixability of Parts . . . . . . . . . . . . . . . . . . . . . . . . . 15
2. MATERIAL INFORMATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
A. Material - Price and Availability. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
B. Industry Support Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
C. Parts Necessary For Each Airplane . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
1. Kits/Parts: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
2. Parts and Materials Supplied by the Operator: . . . . . . . . . . . . . . . . . . . . . . 17
3. Parts Modified and Reidentified: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
4. Parts Removed and Not Replaced: . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
D. Parts Necessary to Change Spares . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
E. Special Tooling - Price and Availability. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
F. Special Tooling Necessary to do this Service Bulletin . . . . . . . . . . . . . . . . . . . . . 18
3. ACCOMPLISHMENT INSTRUCTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19
A. GENERAL INFORMATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19
B. WORK INSTRUCTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20
Table of Contents
November 12, 2004
Revision 1 January 31, 2005 MD80-71-095
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 3 of 22
BOEING SERVICE BULLETIN MD80-71-095
BLANK PAGE
Table of Contents
November 12, 2004
Revision 1 January 31, 2005 MD80-71-095
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 4 of 22
Commercial McDonnell Douglas
Airplane
Group MD-80
Service Bulletin
Number: MD80-71-095 Revision Transmittal Sheet
Date: November 12, 2004
Revision 1 January 31, 2005
ATA System: 7100
SUBJECT: POWER PLANT - Power Plant - General - Change JT8D-217C Engines to JT8D-219
Engines
More work is necessary on Airplanes 1379, 1638, and 1917 if changed as shown in the initial release of this
service bulletin. More work for Airplanes 1379 and 1638 is to do functional check of the Thrust Rating Indicator
(TRI) for proper display as follows:
– If Airplanes 1379 and 1638 are operating with JT8D-219 engines, do Work Instruction, Part I, Step 10.
– If Airplanes 1379 and 1638 are operating with JT8D-217C engines, do Work Instruction, Part II, Step 10.
An additional 0.2 task hour is necessary for Airplanes 1379 and 1638 to do the functional check.
An additional 6.6 task hours are necessary for Airplane 1917 to do wiring changes and tests.
1. In Effectivity, Paragraph 1.A., added Airplanes 1979 and 1999 under new Group 3.
8. In Data Supplied with this Service Bulletin, Paragraph 1.J.2., added memo change with existing drawing
change letter.
9. In Parts and Materials Supplied by the Operator, Paragraph 2.C.2., added Group 3 to heading.
10. In General Information, Paragraph 3.A., changed Note 2 and added Note 7.
11. In Work Instructions, Paragraph 3.B., Parts I and II, did the following:
Vertical lines are put on the left edge of each page, except in Paragraph 1.A., Effectivity, to show the location
of important changes.
REVISION HISTORY
SUBJECT: POWER PLANT - Power Plant - General - Change JT8D-217C Engines to JT8D-219
Engines
CONCURRENT REQUIREMENTS
All Groups
1. Applicable Boeing Service Bulletin(s) listed below must be done before or at the same time as this service
bulletin.
Applicable Applicable
Group Service Bulletin Description
1 MD80-57-199 Changes airplane from DC-9-81 (MD-81) to DC-9-82 (MD-82).
1 MD80-27-372 Changes airplane from DC-9-82 (MD-82) to DC-9-83 (MD-83).
3 MD80-57-215 Changes airplane from DC-9-81 (MD-81) to DC-9-82 (MD-82).
2. Digital Flight Guidance Computer (DFGC) part number 4034241-930 or later must be installed.
3. The related Pratt and Whitney Service Bulletins are JT8D 5731 or 5732. Copies may be obtained from:
BACKGROUND
This service bulletin was prepared to provide information, drawings, and material requirements to incorporate
Kit Configuration Notice (KCN) K852D, which installs airplane electrical wiring for engine performance
computing system to accommodate operating JT8D-219 engines in lieu of JT8D-217C engines, and the
capability to return the airplane to JT8D-217C engines configuration by changing the wiring.
Note: The airplanes in Group 1 will be in the MD-83 gross weight configuration, and the airplanes in Groups 2
and 3 will be in the MD-82 gross weight configuration.
All Groups
2. Changes wire termination on two connectors for primary engine display located on center instrument panel
in the flight compartment.
3. Changes Digital Flight Guidance Computers (DFGC) and Advance Flight Management System Computer
(AFMSC) program pin wiring at Stations Y=110.000, Y=160.00, and Y=218.000 junction boxes in the
Electrical/Electronics (E/E) compartment.
4. Does a DFGC test of affected systems and Thrust Rating Indicator (TRI) functional check for proper engine
indications.
8. The JT8D-217C engines may be installed again with procedures given in this service bulletin.
EFFECTIVITY
COMPLIANCE
Boeing Industry Support information is provided in Kit Configuration Notice (KCN) K852D.
MANPOWER
This estimate does not include the manpower data given in the service bulletins in Paragraph 1.B., Concurrent
Requirements.
MATERIAL INFORMATION
CHANGE WIRING AT
STA 83 CENTER
INSTRUMENT PANEL
SUBJECT: POWER PLANT - Power Plant - General - Change JT8D-217C Engines to JT8D-219
Engines
1. PLANNING INFORMATION
A. Effectivity
1. Airplanes
This service bulletin is for the airplanes shown below. Refer to Kit Configuration Notice K852D
for data about this change.
Airplane models:
SAS (SAS)
1 1379 1638
2 1917
3 1979 1999
Fuselage Group
1379 1
1638 1
2. Spares Affected
None.
B. Concurrent Requirements
All Groups
1. Applicable Boeing Service Bulletin(s) listed below must be done before or at the same time as
this service bulletin.
Applicable Applicable
Group Service Bulletin Description
1 MD80-57-199 Changes airplane from DC-9-81 (MD-81) to DC-9-82 (MD-82).
1 MD80-27-372 Changes airplane from DC-9-82 (MD-82) to DC-9-83 (MD-83).
3 MD80-57-215 Changes airplane from DC-9-81 (MD-81) to DC-9-82 (MD-82).
2. Digital Flight Guidance Computer (DFGC) part number 4034241-930 or later must be installed.
3. The related Pratt and Whitney Service Bulletins are JT8D 5731 or 5732. Copies may be obtained
from:
C. Reason
This service bulletin was prepared to provide information, drawings, and material requirements to
incorporate Kit Configuration Notice (KCN) K852D, which installs airplane electrical wiring for engine
performance computing system to accommodate operating JT8D-219 engines in lieu of JT8D-217C
engines, and the capability to return the airplane to JT8D-217C engines configuration by changing the
wiring.
Note: The airplanes in Group 1 will be in the MD-83 gross weight configuration, and the airplanes in
Groups 2 and 3 will be in the MD-82 gross weight configuration.
All Groups
2. Changes wire termination on two connectors for primary engine display located on center
instrument panel in the flight compartment.
3. Changes Digital Flight Guidance Computers (DFGC) and Advance Flight Management System
Computer (AFMSC) program pin wiring at Stations Y=110.000, Y=160.00, and Y=218.000
junction boxes in the Electrical/Electronics (E/E) compartment.
4. Does a DFGC test of affected systems and Thrust Rating Indicator (TRI) functional check for
proper engine indications.
8. The JT8D-217C engines may be installed again with procedures given in this service bulletin.
More work is necessary on Airplanes 1379, 1638, and 1917 if changed as shown in the initial release
of this service bulletin. More work for Airplanes 1379 and 1638 is to do functional check of the Thrust
Rating Indicator (TRI) for proper display as follows:
– If Airplanes 1379 and 1638 are operating with JT8D-219 engines, do Work Instruction, Part I,
Step 10.
– If Airplanes 1379 and 1638 are operating with JT8D-217C engines, do Work Instruction, Part II,
Step 10.
An additional 0.2 task hour is necessary for Airplanes 1379 and 1638 to do the functional check.
An additional 6.6 task hours are necessary for Airplane 1917 to do wiring changes and tests.
E. Compliance
The resultant modification described in Paragraph 1.D., has been shown to comply with the applicable
Federal Aviation Regulations and is FAA approved for the affected airplanes listed in Paragraph 1.A.
This service bulletin and the FAA approval were based on the airplane in its original Boeing delivery
configuration or as modified by other Boeing changes.
G. Manpower
The table below shows an estimate of the task hours necessary to do this change for each airplane.
This estimate is for direct labor only, done by an experienced crew. Adjust the estimate with the
operator task hour data if necessary. The estimate does not include lost time. These are some
examples of lost time:
— Time to adjust to the workplace
— Time to schedule the work
— Time to examine the work
— Time to cure the materials
— Time to make the parts.
— Time to find the tools.
Any Group
Task Number of Persons Task Hours Elapsed Hours
Open Access 1 0.3 0.3
Install Electrical Wiring 1 3.0 3.0
Close Access 1 0.3 0.3
Test 2 3.2 1.6
TOTAL FOR EACH AIRPLANE 6.8 5.2
This estimate does not include the manpower data given in the service bulletins in Paragraph 1.B.,
Concurrent Requirements.
None.
Not changed.
J. References
1. Existing Data:
b. Aircraft Maintenance Manual (AMM) 06-24-00, 22-01-05, 24-20-00, 34-18-00, 34-63-03, 71-
00-00 and 77-42-00.
None.
4. Process Data:
Douglas Process Standards referred to on the drawings are not given in this service bulletin since
these procedures are frequently used as standard shop practices.
K. Publications Affected
The change outlined in this service bulletin affects the following MD-80 publications:
Publication Chapter-Section
FAA Approved Airplane Flight Manual 4D **
Flight Crew Operating Manual Engines/System Description (Volume 2, Section
4) and Performance/Performance Volume)
System Schematic Manual 22-16, 31-11, 34-63
Wiring Diagram Manual 22-16, 31-11, 34-63
** Required prior to Flight with JT8D-219 engines installed.
Refer to Paragraph 2.C., Parts Necessary For Each Airplane, for interchangeability and intermixability
information.
BLANK PAGE
2. MATERIAL INFORMATION
The operator supplies the parts shown in Paragraph 2.C., Parts Necessary For Each Airplane. This
was negotiated with the operator under Kit Configuration Notice (KCN) K852D.
1. Kits/Parts:
None.
None.
None.
None.
None.
No special tools or equipment are necessary to do the change in this service bulletin. But,
maintenance and overhaul tools in the manuals given in Paragraph 1.J., References, can be
necessary. Examine operator tool supply to make sure all necessary tools are available.
3. ACCOMPLISHMENT INSTRUCTIONS
A. GENERAL INFORMATION
WARNING: IF ELECTRICAL POWER IS APPLIED TO THE AIRPLANE, MAKE SURE YOU OBEY
ALL PRECAUTIONS WHILE YOU DO WORK. IF YOU DO NOT OBEY THE
PRECAUTIONS, DEATH OR INJURY TO PERSONS, AND DAMAGE TO THE
AIRPLANE CAN OCCUR.
CAUTION: KEEP THE WORK AREA, WIRES AND ELECTRICAL BUNDLES CLEAN OF METAL
PARTICLES OR CONTAMINATION WHEN YOU USE TOOLS. UNWANTED
MATERIAL, METAL PARTICLES OR CONTAMINATION CAUGHT IN WIRE BUNDLES
CAN CAUSE DAMAGE TO THE BUNDLES. DAMAGED WIRE BUNDLES CAN CAUSE
SPARKS OR OTHER ELECTRICAL DAMAGE.
Note:
1. Manual titles are referred to by acronyms. Refer to Paragraph 1.J., References, for
definition of the acronyms.
2. Part I - Installation of program pin wiring for the Digital Flight Guidance Computers (DFGC)
will require change of JT8D-217C engines to JT8D-219 engines per Pratt and Whitney
Service Bulletin JT8D 5731 or installation of JT8D-219 engines for compatibility with the
engine performance indication system.
Part II - Installation of program pin wiring for the Digital Flight Guidance Computers
(DFGC) will require change of JT8D-219 engines to JT8D-217C engines per Pratt and
Whitney Service Bulletin JT8D 5732 or installation of JT8D-217C engines for compatibility
with the engine performance indication system.
5. Obey all of the warnings and cautions given in the specified manual sections.
Chapter Operation
20-00-00 Safety Practices
20-10-01 Installation of Wire
20-20-01 Installation of Terminals
20-20-02 Installation of Contact Pins
7. Refer to the following table for Group to Service Rework Drawing Configuration
information.
B. WORK INSTRUCTIONS
1. Change JT8D-217C engines to JT8D-219 engines per Pratt and Whitney Service Bulletin JT8D
5731, or at operator’s option, install new JT8D-219 engines.
2. Remove the electrical power from the airplane. Refer to MD-80 AMM 24-20-00.
3. Remove and keep Engine Display Panel (EDP). Refer to MD-80 AMM 77-42-00.
4. Change wire termination on connectors P1-793 and P1-794 on EDP as shown on applicable
Service Rework Drawing.
Service Rework
Group Drawing Configuration Applicable Sheets
1 SR09220066-7001/-7002 17
2 and 3 SR09220066-7005/-7006 17
6. Get access to Digital Flight Guidance Computers (DFGC-1 and DFGC-2) and Advanced Flight
Management Computer (AFMC) electrical wiring by opening Electrical/Electronic (E/E)
compartment door 4501A. Refer to MD-80 AMM 06-24-00.
7. Change program pin wiring for DFGC-1, DFGC-2, and AFMC as shown on applicable Service
Rework Drawing.
Service Rework
Group Drawing Configuration Applicable Sheets
1 SR09220066-7001/-7002 17.1, 17.2, 17.3, 101.201, 102.201,
301.201, and 302.201
2 and 3 SR09220066-7005/-7006 17.1, 17.2, 17.4, 102.201, 103.201,
and 302.201
9. Do a DFGS test on DFGC-1 and DFGC-2 as shown on Service Rework Drawing SR09220066,
Sheet 4.1. Refer to MD-80 AMM 22-01-05.
10. Do a functional check of the Thrust Rating Indicator (TRI) for proper JT8D-219 EPR display.
Refer to MD-80 AMM 71-02-00.
11. Do an Advance Flight Management System (AFMS) test as shown on Service Rework Drawing
SR09220066, Sheet 4.1. Refer to MD-80 AMM 34-63-00.
12. Do an EDP test as shown on Service Rework Drawing SR09220066, Sheet 4.1. Refer to MD-80
AMM 77-42-00.
13. Do Engine Trimming Procedure for each engine as outlined under General - Adjustment/Test for
JT8D-219 engines. Refer to MD-80 AMM 71-00-00.
14. Close E/E compartment door 4501A and return the airplane to a serviceable condition.
1. Change JT8D-219 engines to JT8D-217C engines per Pratt and Whitney Service Bulletin JT8D
5732, or at operator’s option, install new JT8D-217C engines.
2. Remove the electrical power from the airplane. Refer to MD-80 AMM 24-20-00.
3. Remove and keep Engine Display Panel (EDP). Refer to MD-80 AMM 77-42-00.
4. Change wire termination on connectors P1-793 and P1-794 on EDP as shown on applicable
Service Rework Drawing.
Service Rework
Group Drawing Configuration Applicable Sheets
1 SR09220066-7003/-7004 18
2 and 3 SR09220066-7007/-7008 18
6. Get access to Digital Flight Guidance Computers (DFGC-1 and DFGC-2) and Advanced Flight
Management Computer (AFMC) electrical wiring by opening Electrical/Electronic (E/E)
compartment door 4501A. Refer to MD-80 AMM 06-24-00.
7. Change program pin wiring for DFGC-1, DGFC-2, and AFMC as shown on applicable Service
Rework Drawing.
Service Rework
Group Drawing Configuration Applicable Sheets
1 SR09220066-7003/-7004 18.1, 18.2, 18.3, 104.201,
105.201, 303.201, and
304.201
2 and 3 SR09220066-7007/-7008 18.1, 18.2, 18.4, 104.201,
304.201, and 305.201
9. Do an DFGS test on DFGC-1 and DFGC-2 as shown on Service Rework Drawing SR09220066,
Sheet 4.2. Refer to MD-80 AMM 22-01-05.
10. Do functional check of the Thrust Rating Indicator (TRI) for proper JT8D-217C EPR display.
Refer to MD80 AMM 71-02-00.
11. Do an Advance Flight Management System (AFMS) test as shown on Service Rework Drawing
SR09220066, Sheet 4.2. Refer to MD-80 AMM 34-63-03.
12. Do an EDP test as shown on Service Rework Drawing SR09220066, Sheet 4.2. Refer to MD-80
AMM 77-42-00
13. Do Engine Trimming Procedure for each engine as outlined under General - Adjustment/Test for
JT8D-217C engines. Refer to MD-80 AMM 71-00-00.
14. Close E/E compartment door 4501A and return the airplane to a serviceable condition.