PROPOSED BY :
Muhammad Rafly Gunawan
(GB1020021)
DEPARTMENT OF PHYSISCS
OF MATEMATICS AND NATURAL SCIENCES
MATARAM UNIVERSITY
2023
Intership Proposal
PT Amman Mineral Nusa Tenggara-
West Nusa Tenggara
FOREWORD
With the grace and blessings of Allah Subhaanahu wa Ta'aala, we have successfully
prepared this Internship Proposal for PT Amman Mineral Nusa Tenggara as planned.
We submit this Internship Proposal as the initial step to gain practical work experience
at PT Amman Mineral Nusa Tenggara and apply the knowledge we have acquired during our
studies in the Physics Study Program at the University of Mataram.
We sincerely hope that this proposal will be accepted and bring wide-ranging benefits
to the author and readers. Thank you for the opportunity provided.
May this proposal serve as a positive starting point for collaboration between PT
Amman Mineral Nusa Tenggara and us as students.
Autthor
ii
Intership Proposal
PT Amman Mineral Nusa Tenggara-
West Nusa Tenggara
TABLE OF CONTANTS
FOREWORD ................................................................................................................................. ii
TABLE OF CONTANTS ................................................................................................................... iii
CHAPTER I INTRODUCTION ........................................................................................................... 1
1.1 Background ............................................................................................................................. 1
1.2 Activity Objetives .................................................................................................................... 1
CHAPTER II LITERATURE................................................................................................................ 3
2.1 Drilling ........................................................................................................................................... 3
2.2 Blasting .......................................................................................................................................... 4
2.3 Evaluation and Optimization of Drilling and Blasting Processes ................................................... 5
CHAPTER III WORK METHOD ........................................................................................................ 6
3.1 Time and Implementation............................................................................................................. 6
3.2 Activity Schedule ........................................................................................................................... 6
CHAPTER IV CLOSING ................................................................................................................... 7
CURRICULUM VITAE ..................................................................................................................... 8
iii
Intership Proposal
PT Amman Mineral Nusa Tenggara-
West Nusa Tenggara
CHAPTER I
INTRODUCTION
1.1 Background
PT Amman Mineral Nusa Tenggara is one of the leading mining companies in
Indonesia, focusing on the exploration and extraction of copper and gold ore. The drilling
and blasting processes are crucial stages in mining activities to obtain valuable ore.
Evaluation and optimization of the drilling and blasting processes are important to
ensure operational efficiency, increased productivity, cost control, and improved safety.
Effective drilling and precise blasting can maximize ore production with suitable rock
fragmentation.
1
Intership Proposal
PT Amman Mineral Nusa Tenggara-
West Nusa Tenggara
2
Intership Proposal
PT Amman Mineral Nusa Tenggara-
West Nusa Tenggara
CHAPTER II
LITERATURE
Evaluation and optimization of drilling and blasting processes are crucial steps in the
mining industry to enhance operational efficiency and success. This literature will discuss
the theoretical foundation of evaluating and optimizing drilling and blasting processes, as
well as the factors that influence the success of these operations.
2.1 Drilling
a. Types of Drilling
There are several drilling methods commonly used in the mining industry,
including:
- Rotary drilling.
- Manual drilling.
- Blast hole drilling.
b. Objectives of Drilling
Drilling is performed for various purposes, including:
- Creating blast holes for explosive placement.
- Exploring and sampling rocks for geological analysis.
- Preparing production holes for mineral extraction.
c. Factors Affecting Drilling Efficiency
Efficient drilling depends on various factors, such as:
- Drill rig performance and capability.
- Drill bit selection and condition.
- Drilling techniques and practices.
- Rock hardness and characteristics.
3
Intership Proposal
PT Amman Mineral Nusa Tenggara-
West Nusa Tenggara
2.2 Blasting
a. Objectives of Blasting
Blasting aims to break rocks into desired sizes to facilitate the mining process.
Some objectives of blasting include:
- Achieving predetermined production targets.
- Producing uniformly sized rock fragments.
- Obtaining stability in rock walls.
- Minimizing environmental impacts.
b. Factors Influencing Blasting Success
Several factors affect the success of the blasting process, including:
- Blast design geometry, including burden, spacing, stemming, subdrilling, and
blast hole depth.
- Quality of the explosive material used.
- Timing and sequencing of detonations.
- Geological conditions and rock properties.
c. Blast Monitoring and Analysis
Monitoring and analyzing the blasting results are crucial for evaluating and
optimizing the process. Techniques used for blast monitoring and analysis include:
- Fragmentation analysis through sieving or image analysis.
- Vibration monitoring to assess potential ground vibrations.
- Airblast monitoring to measure noise levels and assess potential impacts.
- Post-blast surveys to evaluate wall stability and potential overbreak.
4
Intership Proposal
PT Amman Mineral Nusa Tenggara-
West Nusa Tenggara
5
Intership Proposal
PT Amman Mineral Nusa Tenggara-
West Nusa Tenggara
CHAPTER III
WORK METHOD
3.1 Time and Implementation
This Field Internship was carried out for 31 days starting from August 01 -
August 31, 2023 at PT Amman Mineral Nusa Tenggara, Upper Sekongkang Village,
Sekongkang sub-district, West Sumbawa Regency, West Nusa Tenggara Province.
3.2 Activity Schedule
No Activities Week to
1 2 3 4 5 6
1 Briefing and introduction to the
work environment of PT Amman
Mineral Nusa Tenggara
2 Field Orientations
5
Report submission Internship
6
Intership Proposal
PT Amman Mineral Nusa Tenggara-
West Nusa Tenggara
CHAPTER IV
CLOSING
Therefore, we submit this proposal for consideration in accepting the Internship
application. We hope that this proposal can provide an overview of the Internship program
that we will undertake. We sincerely hope that PT Amman Mineral Nusa Tenggara will
approve this proposal so that we can make a meaningful contribution to the company.