This document summarizes a site visit by safety personnel to inspect permit work. It notes 5 permits reviewed and identifies the GSI, receiving, and FPS parties. The site visit found 2 workers engaged in cold work on a scaffold platform without a ladder to access it, missing toe guards, and planks tied with wire instead of clamps. Safety personnel informed the site safety person and observations were addressed immediately.
This document summarizes a site visit by safety personnel to inspect permit work. It notes 5 permits reviewed and identifies the GSI, receiving, and FPS parties. The site visit found 2 workers engaged in cold work on a scaffold platform without a ladder to access it, missing toe guards, and planks tied with wire instead of clamps. Safety personnel informed the site safety person and observations were addressed immediately.
This document summarizes a site visit by safety personnel to inspect permit work. It notes 5 permits reviewed and identifies the GSI, receiving, and FPS parties. The site visit found 2 workers engaged in cold work on a scaffold platform without a ladder to access it, missing toe guards, and planks tied with wire instead of clamps. Safety personnel informed the site safety person and observations were addressed immediately.
No. GSI MR. KRISHAN MEENA, MR. SHIVAM GUPTA. Receive MR.ABHISHEK AGRAWAL r FPS MR.HIMANSHU UNIYAL Site Visit SAFETY PERSON (NRP) MR. MIDHUN, MR. ASIF KHAN (DHAVAL), MR.RAJESH MEENA. with SITE SUPERVISOR: MR. ABU BARKAT, MR. GOVIND THAKUR, MR. VIKASH SINGH Job ACTION TAKEN / PHOTOGRAPH, if Departmen SN Location Descriptio Agency Observation RECOMMENDATION any t n Worker Mr. Abhay raj & Mr. Bharat das engaged in cold work activity Job was stopped & on green tag scaffold platform at Informed to site Safety approx. 5.5m height at TS-2 area, Person Mr. Vikas while following observations were Kumar for compliance. HGU-II, noted at site. COLD Complied at site. M/s No ladder was found from 1 WORK PROJECT TS-02 AREA DHAVAL ground floor to 1st landing Observations ACTIVITY 03/02/2024 platform. addressed immediately Toe guard missing on that and complied / closed. scaffold. Also ensuring …same Plank tied with binding wire will not be repeated. instead of clamp.