Safety Person Site Supervisor
Safety Person Site Supervisor
Informed to Site
JSA NON COMPLIANCE supervisor Mr. Vikash
(GR/JSA/07/23/811) for compliance.
HGU-II,
WORKING ON Complied at site.
M/s
1 RED TAG PROJECT Worker Mr. Gopal Gohil
SYN GAS DHAVAL
SCAFFOLD (GP- 8214036) engaged Called scaffolding
SHED
in electrical connection at supervisor to address
approx. 2mtr height on the issue immediately
a RED tagged scaffold, and closed.
Also conducted TBT
among all the
workers.
2 HGU-II, WORKING ON M/s PROJECT JSA NON COMPLIANCE Job was stopped at
RED TAG DHAVAL (GR/JSA/07/23/811) site.
SYN GAS SCAFFOLD
SHED Worker Mr. Ajay Informed to Site
kumar (GP- supervisor Mr.
8214885) & Mr. Kamlesh for
Lalmani (GP- compliance.
82144886) engaged Complied at site.
in elbow joint job at
arpox. 2.5mtr height Workers sent for
counselling also
on a RED
tagged scaffold.
conducted TBT
Also, there was no among all the
access was not workers.
provided to reach
the job location.
JSA NON COMPLIANCE
(GR/JSA/11/22/178) Informed to Site
supervisor Mr. Bharti
Chequer plate material for compliance.
lifting was in progress by
mobile crane (GJ 17 AS No control over
5650) near tail gas workers movement
compressor shed-II by is observed under
HGU-II, M/s NRP team,
M/s NRP suspended load.
MATERIAL and M/s
7 TAIL GAS PROJECT M/s Dhaval worker
LIFTING DHAVAL My self and Mr. Atul
COMPRESSO engaged in jobs was
Engg. Modi (Lead Safety
R SHED-II found directly under Worley) was there
suspended load. and none of Dhaval
worker was under
Area barricattion suspended load…
was not provided to Please check before
restrict the mentioning name of
movement of particular agency.
workers