Vehicle entry
Permit was not
available site. (waited
for long to show but
supervisor Mr. Gupta
was unable to produce
the same.)
11 HGU-II, MATERIAL M/s NRP PROJECT JSA NON COMPLIANCE Informed to Site
LIFTING/ and M/s (GR/JSA/11/22/178) supervisor Mr. Bharti for
TAIL GAS SHIFTING DHAVAL compliance.
COMPRESSO Structure lifting was in
R SHED-II progress by mobile crane No control over workers
(GJ 17 AS 5650) near tail movement is observed
08.02.2024 gas compressor shed-II under suspended load.
by M/s NRP team,
Discussed with Mr.
Worker movement bharti and closed the
was observed under matter with mutual
suspended understanding
load directly under ( provided banksman at
suspended load. all the sides)