You are on page 1of 2

Permit

903124000022, 9031A2400019, 903124000026, 9031W2400058, 9031V2400008


No.
GSI MR. KRISHAN MEENA, MR. SHIVAM GUPTA.
Receive MR.ABHISHEK AGRAWAL
r
FPS MR.HIMANSHU UNIYAL
Site Visit SAFETY PERSON MR. ASIF KHAN (DHAVAL), MR.RAJESH MEENA.
with SITE SUPERVISOR: MR. ABU BARKAT, MR. GOVIND THAKUR, MR. VIKASH SINGH
Job ACTION TAKEN / PHOTOGRAPH,
SN Location Agency Department Observation
Description RECOMMENDATION if any
Workers were removed from
height & Informed to site Safety
HGU-II, Two workers were standing at
Person Mr. Rajesh Meena for
approx.. 10 to 12 meters
NO WORK compliance.
MAIN PIPE M/s height without full body
2 WAS IN PROJECT Complied at site.
RACK TOP PROGRESS DHAVAL harness. (Work of grating
ENTIRE CREW SENT FOR
05.02.2024 and railing of permanent
COUNSELING AND ALSO
platform is incomplete)
CONDUCTED TBT AMONG
ALL THE WOKERS
Informed to site Safety Person
Mr. Rajesh Meena for
compliance. Safety Goggles
HGU-II,
Two workers were engaged provided.
INSULATION M/s in insulation work without Complied at site.
3 TS-II PROJECT
WORK DHAVAL wearing safety goggles at TS-
II. Penalty has been imposed
05.02.2024
against both the workers for
non-compliance of Mandatory
PPE’s
HGU-II,
During reversing of Tampo
Informed to site Supervisor Mr.
(EICHER)
NEAR MAIN MATERIAL M/s Harsh for compliance.
4 PROJECT (GJ.06.ZZ.5363) no one
PIPE RACK UNLOADING DHAVAL
(flagman) was available to
Flagman provided.
guide the vehicle.
05.02.2024
7 HGU-II, FIRE M/s Project Supervisor Mr. Rohit (along Job stopped & supervisor
MONITOR Dhaval with two other workers) was counselled.
found at the top of structure
MPR top platform (railing installation Penalty has been imposed
job in progress in the against supervisor and half day
05.02.2024 platform) without wearing full salary has been deducted of
body harness. both workers