You are on page 1of 67

EHSMSM/WORKS/9203/9217 SAFE WORK PROCEDURE – CIVIL & STRUCTURAL WORK 1 of 58 | P a g e

(Performance Criteria - Perfection in job with no injury to persons or damage to property) or damage to property REV

1. DEPARTMENT : RMP-Joda (ENGG & PROJECTS-Tata Steel Ltd.) DOC. NO: SWP/PAR/FAP/Joda/01 DATE:

2. SECTION / LOCATION : Ferro Plant, Joda NAME OF WORKING AGENCY: M/s. PARVEEN CONSTRUCTION
3. JOB TITLE : Civil works for Effluent Treatment Plant WORK ORDER No: 3800016542/109

JOB DURATION : Start Date: 01/01/2021 End Date: 30/06/2021


Persons Responsible Condition of Tools / Reference to
Sl.
Activities (Sequence of Work) Hazard Safety Precautions Name & P. No. Tackles required OK/Not document/criteria and
No.
Ok remarks

1 GENERAL Statutory Prohibition A.1. All the Workmen and Employees Mr.Bhaskar Das
A. Before starting of Job must be attended VT safety induction Gupta, Head RMP SS/GEN-54
training as per DGMS norms and duly Civil (TSL) SAFETY (PPE AND
clear the medical test ,the workers who Mo.N0- HELMET- OK CLOTHING
9040092694
are going to work at height shall clear the SAFETY STANDARD)
height test before enrolling into the job. Mr. LN Goswami, SHOES-OK
A.2. Prior to start the work, the work Civil Engineer SAFETY SS/ENGG-15
Permit will be filled up in triplicate to (Parveen Cons) JACKET- OK (STORAGE OF
clarify the type of work involved. work Mob No- SAFETY CONSTRUCTIO
permit to be close/returned after doing 9777344302 GLOVES - OK N MATERIAL)
the job over SAFETY
A.3.Proximity / Six directional hazards of Md.Abdus Salim, GOGGLES-OK SS/ENGG-11
the area and necessary precautions will Site BARRICADING (SAFETY IN
be carryout. Supervioser(Parve –OK MATERIAL
en Cons)
A.4. Every day before starting the work, HANDLING
Mo.No-
hazards & the necessary precautionary 6370417428 EQUIPMENT)
measures in relation to the operations
assigned for that day & the succeeding SS/ENGG-13
day shall be prepared thoroughly. And in (BARRICADING
case it is found expedient to do so, the SAFETY)
hazards shall be re-identified.
A.5. Brief description regarding

TSL Representative Working agency Engineer


TATA STEEL M/s. PARVEEN CONSTRUCTION
Note: 1. This Safe Work Procedure shall be prepared by owner department countersigned by contractor's representative and safety department.
2. Sequence of work shall invoice step-by-step jobs.
3. All possible hazard including proximity hazard shall be amended and persons shall be identified.
4. With the change of working conditions, the procedure shall be amended and persons shall be trained
5. Review on status of implementation shall be done though task observation
6. Before start of the job, induction shall be given to persons engaged at site by departmental representative and Contractor's Representative.
EHSMSM/WORKS/9203/9217 SAFE WORK PROCEDURE – CIVIL & STRUCTURAL WORK 2 of 58 | P a g e
(Performance Criteria - Perfection in job with no injury to persons or damage to property) or damage to property REV

1. DEPARTMENT : RMP-Joda (ENGG & PROJECTS-Tata Steel Ltd.) DOC. NO: SWP/PAR/FAP/Joda/01 DATE:

2. SECTION / LOCATION : Ferro Plant, Joda NAME OF WORKING AGENCY: M/s. PARVEEN CONSTRUCTION
3. JOB TITLE : Civil works for Effluent Treatment Plant WORK ORDER No: 3800016542/109

JOB DURATION : Start Date: 01/01/2021 End Date: 30/06/2021


Persons Responsible Condition of Tools / Reference to
Sl.
Activities (Sequence of Work) Hazard Safety Precautions Name & P. No. Tackles required OK/Not document/criteria and
No.
Ok remarks
hazards/safety measure will be given to SAFETY
all the workmen through Tool box talk Mr.Bhaskar Das HELMET- OK
meeting. Gupta, Head RMP SAFETY
A.6. Area will be hard barricaded with Civil (TSL) SHOES-OK
warning tapes/safety nets wherever Mo.N0- SAFETY
9040092694
required. JACKET- OK
A.7. Jobs will be carried out under the Mr. LN Goswami, SAFETY
strict supervision. Civil Engineer GLOVES - OK
A.8. 30:1 safety professional to be (Parveen Cons) SAFETY
deploy at site Mob No- GOGGLES-OK
A.9. First Aid Box will be kept at site 9777344302 BARRICADING
office. –OK
A.10. Employees will be made Md.Abdus Salim,
acquainted with the use of safety Site
appliance. Supervioser(Parve
en Cons)
A.11. Job specific safety briefing will be
Mo.No-
given before starting each shift- Tool box 6370417428
talk/safety talk or pep talk.
A.12. Co-ordination will be maintained
with other agencies.
A.13. Proper identification mark will be
provided for every lifting Tools & tackles.
A.14. Area should be cleaned before

TSL Representative Working agency Engineer


TATA STEEL M/s. PARVEEN CONSTRUCTION
Note: 1. This Safe Work Procedure shall be prepared by owner department countersigned by contractor's representative and safety department.
2. Sequence of work shall invoice step-by-step jobs.
3. All possible hazard including proximity hazard shall be amended and persons shall be identified.
4. With the change of working conditions, the procedure shall be amended and persons shall be trained
5. Review on status of implementation shall be done though task observation
6. Before start of the job, induction shall be given to persons engaged at site by departmental representative and Contractor's Representative.
EHSMSM/WORKS/9203/9217 SAFE WORK PROCEDURE – CIVIL & STRUCTURAL WORK 3 of 58 | P a g e
(Performance Criteria - Perfection in job with no injury to persons or damage to property) or damage to property REV

1. DEPARTMENT : RMP-Joda (ENGG & PROJECTS-Tata Steel Ltd.) DOC. NO: SWP/PAR/FAP/Joda/01 DATE:

2. SECTION / LOCATION : Ferro Plant, Joda NAME OF WORKING AGENCY: M/s. PARVEEN CONSTRUCTION
3. JOB TITLE : Civil works for Effluent Treatment Plant WORK ORDER No: 3800016542/109

JOB DURATION : Start Date: 01/01/2021 End Date: 30/06/2021


Persons Responsible Condition of Tools / Reference to
Sl.
Activities (Sequence of Work) Hazard Safety Precautions Name & P. No. Tackles required OK/Not document/criteria and
No.
Ok remarks
starting the job & after the job SAFETY
completion. HELMET- OK
A.15. Lifting equipments, accessories will Mr.Bhaskar Das SAFETY
be deployed at site must have valid Third Gupta, Head RMP SHOES-OK
party test certificates & will be produced Civil (TSL) SAFETY
on demand. Mo.N0- JACKET- OK
9040092694
A.16. Unnecessary water accumulation SAFETY
will be avoided. Mr. LN Goswami, GLOVES - OK
A.17. Pest controller will be deployed for Civil Engineer SAFETY
mosquito/snake bite. (Parveen Cons) GOGGLES-OK
A.18. Contact board with details of site Mob No- BARRICADING
supervisor & contact no will be displayed 9777344302 –OK
along with important nos. & persons
details. Md.Abdus Salim, SPADE –OK
A.19. Proper housekeeping to be Site PICK AXE –OK
maintained in all workplaces on daily Supervioser(Parve HAMMER –OK
en Cons)
basis. CHISEL –OK
Mo.No-
6370417428 SHOVEL –OK
GAITA-OK
GAMLA –OK
HAND PANJA –
OK

TSL Representative Working agency Engineer


TATA STEEL M/s. PARVEEN CONSTRUCTION
Note: 1. This Safe Work Procedure shall be prepared by owner department countersigned by contractor's representative and safety department.
2. Sequence of work shall invoice step-by-step jobs.
3. All possible hazard including proximity hazard shall be amended and persons shall be identified.
4. With the change of working conditions, the procedure shall be amended and persons shall be trained
5. Review on status of implementation shall be done though task observation
6. Before start of the job, induction shall be given to persons engaged at site by departmental representative and Contractor's Representative.
EHSMSM/WORKS/9203/9217 SAFE WORK PROCEDURE – CIVIL & STRUCTURAL WORK 4 of 58 | P a g e
(Performance Criteria - Perfection in job with no injury to persons or damage to property) or damage to property REV

1. DEPARTMENT : RMP-Joda (ENGG & PROJECTS-Tata Steel Ltd.) DOC. NO: SWP/PAR/FAP/Joda/01 DATE:

2. SECTION / LOCATION : Ferro Plant, Joda NAME OF WORKING AGENCY: M/s. PARVEEN CONSTRUCTION
3. JOB TITLE : Civil works for Effluent Treatment Plant WORK ORDER No: 3800016542/109

JOB DURATION : Start Date: 01/01/2021 End Date: 30/06/2021


Persons Responsible Condition of Tools / Reference to
Sl.
Activities (Sequence of Work) Hazard Safety Precautions Name & P. No. Tackles required OK/Not document/criteria and
No.
Ok remarks
2.A.1. Injury to person due SAFETY
2 Material Handling: to uncertain slip of material. 1.1. Manual material handling awareness HELMET- OK SS/GEN-54
Program to be conducted & SAFETY (PPE AND
A. Manual material 1.2. Inadequate manpower. communicated. Mr.Bhaskar Das SHOES-OK CLOTHING
handling of stone 1.2. Provide adequate Manpower for the Gupta, Head RMP SAFETY STANDARD)
chips/sand/cement/steel 1.3. Lack of coordination lifting of loads. Head load will be avoided Civil (TSL) JACKET- OK
structures/insulator/copp In group effort. 1.3. Training on safe manual material Mo.N0- SAFETY SS/ENGG-15
9040092694
er cables: handling to the workmen involved in the GLOVES - OK (STORAGE OF
1.4. Slip, fall of person from material handling Mr. LN Goswami, SAFETY CONSTRUCTIO
1. Manual Loading & the vehicle 1.4. Use ladder for climbing on the Civil Engineer GOGGLES-OK N MATERIAL)
Unloading of Materials 1.5. injury due to Bur or vehicle. (Parveen Cons) BARRICADING
from, sharp edges/ corners/ 1.5. Use of appropriate PPEs (i.e. cotton Mob No- –OK SS/ENGG-11
 Material stack yard to projecting parts/ hand gloves, safety shoes, safety 9777344302 (SAFETY IN
Trailer/Truck bed Protruding steel structures goggles, safety helmet). SPADE –OK MATERIAL
 Material stack yard to 1.6 Injury to persons due to 1.6. Daily housekeeping of site to be Md.Abdus Salim, PICK AXE –OK HANDLING
working site. poor housekeeping at site. followed. Site HAMMER –OK EQUIPMENT)
Supervioser(Parve CHISEL –OK
en Cons)
SHOVEL –OK SS/ENGG-13
Mo.No-
6370417428 GAITA-OK (BARRICADING
GAMLA –OK SAFETY)
HAND PANJA –
OK
SLINGS -OK

TSL Representative Working agency Engineer


TATA STEEL M/s. PARVEEN CONSTRUCTION
Note: 1. This Safe Work Procedure shall be prepared by owner department countersigned by contractor's representative and safety department.
2. Sequence of work shall invoice step-by-step jobs.
3. All possible hazard including proximity hazard shall be amended and persons shall be identified.
4. With the change of working conditions, the procedure shall be amended and persons shall be trained
5. Review on status of implementation shall be done though task observation
6. Before start of the job, induction shall be given to persons engaged at site by departmental representative and Contractor's Representative.
EHSMSM/WORKS/9203/9217 SAFE WORK PROCEDURE – CIVIL & STRUCTURAL WORK 5 of 58 | P a g e
(Performance Criteria - Perfection in job with no injury to persons or damage to property) or damage to property REV

1. DEPARTMENT : RMP-Joda (ENGG & PROJECTS-Tata Steel Ltd.) DOC. NO: SWP/PAR/FAP/Joda/01 DATE:

2. SECTION / LOCATION : Ferro Plant, Joda NAME OF WORKING AGENCY: M/s. PARVEEN CONSTRUCTION
3. JOB TITLE : Civil works for Effluent Treatment Plant WORK ORDER No: 3800016542/109

JOB DURATION : Start Date: 01/01/2021 End Date: 30/06/2021


Persons Responsible Condition of Tools / Reference to
Sl.
Activities (Sequence of Work) Hazard Safety Precautions Name & P. No. Tackles required OK/Not document/criteria and
No.
Ok remarks
SAFETY
B. Mechanical material A.1.1. & A.1.2. Trained, experience HELMET- OK SS/GEN-54
handling : A.1.1 Tilting of crane. operator with valid license. Flag man to SAFETY (PPE AND
A.1.2. Crane overturning be deployed at both side. Approach SHOES-OK CLOTHING
A.1. Positioning of lifting due to unstable ground should be cleared during material Mr.Bhaskar Das SAFETY STANDARD)
equipments at loading & conditions. handling. Overhead clearance to be Gupta, Head RMP JACKET- OK
un-loading Points. A.1.3. Personnel being ensured. Crane must be positioned on Civil (TSL) SAFETY SS/ENGG-15
 Marching crane to work crushed by outriggers flat surface & it’s out rigger surface must Mo.N0- GLOVES - OK (STORAGE OF
9040092694
place be placed on timber or suitable material SAFETY CONSTRUCTIO
 Placing in compacted for pads to Evenly distribute the load to Mr. LN Goswami, GOGGLES-OK N MATERIAL)
earth surface the ground. Civil Engineer BARRICADING
 Placing outriggers with A.1.3. Crane to be located within the (Parveen Cons) –OK SS/ENGG-11
plates radius for the loads being lifted & it Mob No- (SAFETY IN
should be barricaded with warning signs. 9777344302 SPADE –OK MATERIAL
A.2. Preparation of sling PICK AXE –OK HANDLING
arrangement for loading A.2.1.Uncertain release of A.2.1.1.Material will be kept on Md.Abdus Salim, HAMMER –OK EQUIPMENT)
& unloading of materials lifting tools & tackles & runner/slipper for easy tying of with sling. Site CHISEL –OK
 Manually shift the slings Injury of finger during Check slings for rips and tears and Supervioser(Parve SHOVEL –OK SS/ENGG-13
en Cons)
to workplace slinging remove from service if faults are found GAITA-OK (BARRICADING
Mo.No-
 Slinging in main hook A.2.1.2. Check chains, shackles, hooks 6370417428 GAMLA –OK SAFETY)
manually A.2.2. Trap of person in- and rings for cracks, corrosion, wear, HAND PANJA –
 Slinging the load between objects. cracks, mechanism faults, etc and OK
remove from service if faults are found . SLINGS -OK

TSL Representative Working agency Engineer


TATA STEEL M/s. PARVEEN CONSTRUCTION
Note: 1. This Safe Work Procedure shall be prepared by owner department countersigned by contractor's representative and safety department.
2. Sequence of work shall invoice step-by-step jobs.
3. All possible hazard including proximity hazard shall be amended and persons shall be identified.
4. With the change of working conditions, the procedure shall be amended and persons shall be trained
5. Review on status of implementation shall be done though task observation
6. Before start of the job, induction shall be given to persons engaged at site by departmental representative and Contractor's Representative.
EHSMSM/WORKS/9203/9217 SAFE WORK PROCEDURE – CIVIL & STRUCTURAL WORK 6 of 58 | P a g e
(Performance Criteria - Perfection in job with no injury to persons or damage to property) or damage to property REV

1. DEPARTMENT : RMP-Joda (ENGG & PROJECTS-Tata Steel Ltd.) DOC. NO: SWP/PAR/FAP/Joda/01 DATE:

2. SECTION / LOCATION : Ferro Plant, Joda NAME OF WORKING AGENCY: M/s. PARVEEN CONSTRUCTION
3. JOB TITLE : Civil works for Effluent Treatment Plant WORK ORDER No: 3800016542/109

JOB DURATION : Start Date: 01/01/2021 End Date: 30/06/2021


Persons Responsible Condition of Tools / Reference to
Sl.
Activities (Sequence of Work) Hazard Safety Precautions Name & P. No. Tackles required OK/Not document/criteria and
No.
Ok remarks
A.2.3. Tears in Slings Hook latch will be ensured SAFETY
A.2.2.1.Using of proper PPEs, only HELMET- OK SS/GEN-54
A.2.4. Cracks in chains, trained riggers should be allowed for the SAFETY (PPE AND
shackles, rings and hooks job. Object / load will be slinged at center SHOES-OK CLOTHING
of load SAFETY STANDARD)
A.2.3.1.Lifting gear / equipment Mr.Bhaskar Das JACKET- OK
inspected and tagged with appropriate Gupta, Head RMP SAFETY SS/ENGG-15
monthly colour tag. Civil (TSL) GLOVES - OK (STORAGE OF
A.2.4.1. SWL not to be exceeded. Mo.N0- SAFETY CONSTRUCTIO
9040092694
Trained Signal man to be deployed. GOGGLES-OK N MATERIAL)
Operator must follow the signal man’s Mr. LN Goswami, BARRICADING
signal only. Swing area will be Civil Engineer –OK SS/ENGG-11
barricaded. Unauthorized person/caution (Parveen Cons) (SAFETY IN
board will be displayed. No person will Mob No- SPADE –OK MATERIAL
allowed under suspended load. Only 9777344302 PICK AXE –OK HANDLING
Odisha government approved third HAMMER –OK EQUIPMENT)
party certifies Tools & tackles should to Md.Abdus Salim, CHISEL –OK
be used. Site SHOVEL –OK SS/ENGG-13
B. Lifting & placing of B.1. Tilting of boom. B.1. Selection of crane as per load & Supervioser(Parve GAITA-OK (BARRICADING
en Cons)
materials (Mast & Cable B.2 Dropping of load due to follow the load chart. GAMLA –OK SAFETY)
Mo.No-
Drum) faulty lifting gear or faulty B.2. Proper assessment of load to be 6370417428 HAND PANJA –
 Lifting up-to 1 feet for attachment points. handled by crane & Lifting gear / OK
CG checks and hold for equipment inspected and tagged with SLINGS -OK

TSL Representative Working agency Engineer


TATA STEEL M/s. PARVEEN CONSTRUCTION
Note: 1. This Safe Work Procedure shall be prepared by owner department countersigned by contractor's representative and safety department.
2. Sequence of work shall invoice step-by-step jobs.
3. All possible hazard including proximity hazard shall be amended and persons shall be identified.
4. With the change of working conditions, the procedure shall be amended and persons shall be trained
5. Review on status of implementation shall be done though task observation
6. Before start of the job, induction shall be given to persons engaged at site by departmental representative and Contractor's Representative.
EHSMSM/WORKS/9203/9217 SAFE WORK PROCEDURE – CIVIL & STRUCTURAL WORK 7 of 58 | P a g e
(Performance Criteria - Perfection in job with no injury to persons or damage to property) or damage to property REV

1. DEPARTMENT : RMP-Joda (ENGG & PROJECTS-Tata Steel Ltd.) DOC. NO: SWP/PAR/FAP/Joda/01 DATE:

2. SECTION / LOCATION : Ferro Plant, Joda NAME OF WORKING AGENCY: M/s. PARVEEN CONSTRUCTION
3. JOB TITLE : Civil works for Effluent Treatment Plant WORK ORDER No: 3800016542/109

JOB DURATION : Start Date: 01/01/2021 End Date: 30/06/2021


Persons Responsible Condition of Tools / Reference to
Sl.
Activities (Sequence of Work) Hazard Safety Precautions Name & P. No. Tackles required OK/Not document/criteria and
No.
Ok remarks
a few seconds. appropriate monthly color tag. SAFETY SS/GEN-54
 Swinging of crane to B.3. Hit by hanging load. B.3.1. Using of tag line. HELMET- OK (PPE AND
loading point B3.2. Tying the hanging load with ropes SAFETY CLOTHING
 Restriction to workmen to prevent uncertain swing SHOES-OK STANDARD)
in the swing area SAFETY
 Securing the loaded B.4. Unauthorized B.4. Operator should be trained & JACKET- OK SS/ENGG-15
material Operation of crane. medically fit. Mr.Bhaskar Das SAFETY (STORAGE OF
Gupta, Head RMP GLOVES - OK CONSTRUCTIO
B.5.Boom comes in contact B.5.1. Always keeps the required safe Civil (TSL) SAFETY N MATERIAL)
with the electrical distance between the crane and the Mo.N0- GOGGLES-OK
9040092694
magnetic /induction area. power lines using the distances as per BARRICADING SS/ENGG-11
Indian IE Rule. Mr. LN Goswami, –OK (SAFETY IN
B.5.2. Where possible the power lines Civil Engineer MATERIAL
should be turned off. (Parveen Cons) SPADE –OK HANDLING
C. Mechanical shifting of Mob No- PICK AXE –OK EQUIPMENT)
materials by A.1.1. Separate path / way for man & 9777344302 HAMMER –OK
trailer/Truck/Dumper. vehicles. Controlled movement of CHISEL –OK SS/ENGG-13
vehicle in the premises Md.Abdus Salim, SHOVEL –OK (BARRICADING
A. Placement of vehicle at A.1. Injury to person due to A.1.2. Vehicles movement within plant Site GAITA-OK SAFETY)
loading & unloading hit by vehicle. should be limited to 20 km /h . Supervioser(Parve GAMLA –OK
en Cons)
point. A.2.Helper less driving will be followed HAND PANJA –
Mo.No-
 Parking the vehicle at A.2. Damage to property inside the mines. Ensure PPEs for all 6370417428 OK
loading & unloading due to hit by vehicles. outside drivers. Driver / Operator should SLINGS -OK

TSL Representative Working agency Engineer


TATA STEEL M/s. PARVEEN CONSTRUCTION
Note: 1. This Safe Work Procedure shall be prepared by owner department countersigned by contractor's representative and safety department.
2. Sequence of work shall invoice step-by-step jobs.
3. All possible hazard including proximity hazard shall be amended and persons shall be identified.
4. With the change of working conditions, the procedure shall be amended and persons shall be trained
5. Review on status of implementation shall be done though task observation
6. Before start of the job, induction shall be given to persons engaged at site by departmental representative and Contractor's Representative.
EHSMSM/WORKS/9203/9217 SAFE WORK PROCEDURE – CIVIL & STRUCTURAL WORK 8 of 58 | P a g e
(Performance Criteria - Perfection in job with no injury to persons or damage to property) or damage to property REV

1. DEPARTMENT : RMP-Joda (ENGG & PROJECTS-Tata Steel Ltd.) DOC. NO: SWP/PAR/FAP/Joda/01 DATE:

2. SECTION / LOCATION : Ferro Plant, Joda NAME OF WORKING AGENCY: M/s. PARVEEN CONSTRUCTION
3. JOB TITLE : Civil works for Effluent Treatment Plant WORK ORDER No: 3800016542/109

JOB DURATION : Start Date: 01/01/2021 End Date: 30/06/2021


Persons Responsible Condition of Tools / Reference to
Sl.
Activities (Sequence of Work) Hazard Safety Precautions Name & P. No. Tackles required OK/Not document/criteria and
No.
Ok remarks
point have valid transport vehicle driving SAFETY
 Put off engine while license and they should have eye HELMET- OK SS/GEN-54
loading and unloading examination certificate. SAFETY (PPE AND
 Hand-brake put on A.3. Bursting of tyre & A.2.1. Depute Flagman and use of SHOES-OK CLOTHING
while on halt toppling of vehicles. scotch block SAFETY STANDARD)
 Driver will be out from A.3. Check the condition of tyre before JACKET- OK
the vehicle A.4.Toppling of vehicles due start of the vehicle. SAFETY SS/ENGG-15
to uneven access road. A.4. Area should be leveled/barricaded Mr.Bhaskar Das GLOVES - OK (STORAGE OF
and guidance of vehicle by flagman. Gupta, Head RMP SAFETY CONSTRUCTIO
Civil (TSL) GOGGLES-OK N MATERIAL)
Mo.N0-
BARRICADING
9040092694
–OK SS/ENGG-11
Mr. LN Goswami, (SAFETY IN
B Securing of loaded Civil Engineer SPADE –OK MATERIAL
materials on the bed of B.1.Uncertain release of B.1.1. Proper tying/lashing of materials (Parveen Cons) PICK AXE –OK HANDLING
truck/trailer. loaded materials. by chain/slings with the bed If required, Mob No- HAMMER –OK EQUIPMENT)
 Shifting of chains/belts weld the structure with the trailer bed 9777344302 CHISEL –OK
to trailer bed B.2. Hit or trap of person in- B.2. Install steel posts at the required SHOVEL –OK SS/ENGG-13
 Securing the loaded between objects positions of both sides of vehicle. Md.Abdus Salim, GAITA-OK (BARRICADING
material with the help of B.3. Slip, fall of person from B.3.1. Be always alert at work site Site GAMLA –OK SAFETY)
Supervioser(Parve
chains & turn buckles the vehicle. HAND PANJA –
en Cons)
. C.1. Proper tying/lashing of materials by Mo.No- OK
chain/slings with the bed.. If required, SLINGS -OK

TSL Representative Working agency Engineer


TATA STEEL M/s. PARVEEN CONSTRUCTION
Note: 1. This Safe Work Procedure shall be prepared by owner department countersigned by contractor's representative and safety department.
2. Sequence of work shall invoice step-by-step jobs.
3. All possible hazard including proximity hazard shall be amended and persons shall be identified.
4. With the change of working conditions, the procedure shall be amended and persons shall be trained
5. Review on status of implementation shall be done though task observation
6. Before start of the job, induction shall be given to persons engaged at site by departmental representative and Contractor's Representative.
EHSMSM/WORKS/9203/9217 SAFE WORK PROCEDURE – CIVIL & STRUCTURAL WORK 9 of 58 | P a g e
(Performance Criteria - Perfection in job with no injury to persons or damage to property) or damage to property REV

1. DEPARTMENT : RMP-Joda (ENGG & PROJECTS-Tata Steel Ltd.) DOC. NO: SWP/PAR/FAP/Joda/01 DATE:

2. SECTION / LOCATION : Ferro Plant, Joda NAME OF WORKING AGENCY: M/s. PARVEEN CONSTRUCTION
3. JOB TITLE : Civil works for Effluent Treatment Plant WORK ORDER No: 3800016542/109

JOB DURATION : Start Date: 01/01/2021 End Date: 30/06/2021


Persons Responsible Condition of Tools / Reference to
Sl.
Activities (Sequence of Work) Hazard Safety Precautions Name & P. No. Tackles required OK/Not document/criteria and
No.
Ok remarks
C. Transportation of weld the structure with the trailer bed 6370417428 SAFETY
materials (Mast & Copper C.1. Uncertain release of Use ladder for climbing on the vehicle HELMET- OK SS/GEN-54
Drum) loaded materials due to C.2.1. Tying the hanging load with ropes SAFETY (PPE AND
 Igniting engine for improper lashing / tying. to prevent uncertain swing SHOES-OK CLOTHING
vacuum filling C.2.Injury to person due to C.2.2. Vehicles movement within plant SAFETY STANDARD)
 Unlock the handbrake hit by vehicle. should be limited to 20 km /h. JACKET- OK
 Driving out from loading C.2.3.High Visibility jacket will wear SAFETY SS/ENGG-15
and unloading point wherever applicable. GLOVES - OK (STORAGE OF
 Follow Cautions and Mr.Bhaskar Das SAFETY CONSTRUCTIO
warnings for heavy C.3. Damage to property C.3.1. Avoid excess projection of Gupta, Head RMP GOGGLES-OK N MATERIAL)
Civil (TSL)
material transportation due to hit by vehicles. materials & Provide red flag on projected BARRICADING
Mo.N0-
materials 9040092694 –OK SS/ENGG-11
C.3.2. Follow road safety rules, follow No (SAFETY IN
Entry Timing/safety time of TATA Steel Mr. LN Goswami, SPADE –OK MATERIAL
C.3.3. Traffic rules should be followed. Civil Engineer PICK AXE –OK HANDLING
. C.4. Bursting of tyre & C.4.1.Prechecking of vehicle should be (Parveen Cons) HAMMER –OK EQUIPMENT)
toppling of vehicles. done. Mob No- CHISEL –OK
C.5.Toppling of vehicles C.5.1.Provideing of safe access. 9777344302 SHOVEL –OK SS/ENGG-13
due to uneven access road. GAITA-OK (BARRICADING
C.6.Road accident due to C.6.1. Controlled movement of vehicle in Md.Abdus Salim, GAMLA –OK SAFETY)
Site
rough driving. the premises HAND PANJA –
Supervioser(Parve
C.6.2.Proper guidance of vehicle by en Cons) OK
flagman/helper and use of scotch block. SLINGS -OK

TSL Representative Working agency Engineer


TATA STEEL M/s. PARVEEN CONSTRUCTION
Note: 1. This Safe Work Procedure shall be prepared by owner department countersigned by contractor's representative and safety department.
2. Sequence of work shall invoice step-by-step jobs.
3. All possible hazard including proximity hazard shall be amended and persons shall be identified.
4. With the change of working conditions, the procedure shall be amended and persons shall be trained
5. Review on status of implementation shall be done though task observation
6. Before start of the job, induction shall be given to persons engaged at site by departmental representative and Contractor's Representative.
EHSMSM/WORKS/9203/9217 SAFE WORK PROCEDURE – CIVIL & STRUCTURAL WORK 10 of 58 | P a g e
(Performance Criteria - Perfection in job with no injury to persons or damage to property) or damage to property REV

1. DEPARTMENT : RMP-Joda (ENGG & PROJECTS-Tata Steel Ltd.) DOC. NO: SWP/PAR/FAP/Joda/01 DATE:

2. SECTION / LOCATION : Ferro Plant, Joda NAME OF WORKING AGENCY: M/s. PARVEEN CONSTRUCTION
3. JOB TITLE : Civil works for Effluent Treatment Plant WORK ORDER No: 3800016542/109

JOB DURATION : Start Date: 01/01/2021 End Date: 30/06/2021


Persons Responsible Condition of Tools / Reference to
Sl.
Activities (Sequence of Work) Hazard Safety Precautions Name & P. No. Tackles required OK/Not document/criteria and
No.
Ok remarks
C.6.3. Authorized and Trained operator Mo.No- SAFETY SS/GEN-54
to be engaged. 6370417428 HELMET- OK (PPE AND
SAFETY CLOTHING
SHOES-OK STANDARD)
SAFETY
JACKET- OK SS/ENGG-15
SAFETY (STORAGE OF
GLOVES - OK CONSTRUCTIO
SAFETY N MATERIAL)
Mr.Bhaskar Das
3 Excavation and A.1.1.Review general terrain and
Gupta, Head RMP
GOGGLES-OK
identified surface conditions. Look for BARRICADING SS/ENGG-11
Backfilling A1.1.Slips trips and falls ruts, large rocks and uneven terrain.
Civil (TSL)
–OK (SAFETY IN
A. 1.Survey of the job site Mo.N0-
walking in general area of 9040092694 SPADE –OK MATERIAL
& locating underground
intended excavation. PICK AXE –OK HANDLING
utilities and obstructions
Mr. LN Goswami, HAMMER –OK EQUIPMENT)
prior to digging.
Civil Engineer CHISEL –OK
 Identification of type (Parveen Cons) SHOVEL –OK SS/ENGG-13
of soil Mob No- GAITA-OK (BARRICADING
9777344302 GAMLA –OK SAFETY)
A.2.1.) Damaging of A.2.1) Written clearance for excavation HAND PANJA –
A.2. Manual digging Md.Abdus Salim,
underground services to be taken from Tata Steel. Before start OK SS/ENGG-01
Site
the work & barricaded the excavated Supervioser(Parve SLINGS -OK D- (EXCAVATION
area prior start of the job. SHACKLE- OK SAFETY)

TSL Representative Working agency Engineer


TATA STEEL M/s. PARVEEN CONSTRUCTION
Note: 1. This Safe Work Procedure shall be prepared by owner department countersigned by contractor's representative and safety department.
2. Sequence of work shall invoice step-by-step jobs.
3. All possible hazard including proximity hazard shall be amended and persons shall be identified.
4. With the change of working conditions, the procedure shall be amended and persons shall be trained
5. Review on status of implementation shall be done though task observation
6. Before start of the job, induction shall be given to persons engaged at site by departmental representative and Contractor's Representative.
EHSMSM/WORKS/9203/9217 SAFE WORK PROCEDURE – CIVIL & STRUCTURAL WORK 11 of 58 | P a g e
(Performance Criteria - Perfection in job with no injury to persons or damage to property) or damage to property REV

1. DEPARTMENT : RMP-Joda (ENGG & PROJECTS-Tata Steel Ltd.) DOC. NO: SWP/PAR/FAP/Joda/01 DATE:

2. SECTION / LOCATION : Ferro Plant, Joda NAME OF WORKING AGENCY: M/s. PARVEEN CONSTRUCTION
3. JOB TITLE : Civil works for Effluent Treatment Plant WORK ORDER No: 3800016542/109

JOB DURATION : Start Date: 01/01/2021 End Date: 30/06/2021


Persons Responsible Condition of Tools / Reference to
Sl.
Activities (Sequence of Work) Hazard Safety Precautions Name & P. No. Tackles required OK/Not document/criteria and
No.
Ok remarks
A.2.2.1 Location of underground water en Cons) SAFETY SS/GEN-54
1. Site owner department A.2.2) Injury due to Pipes, Electrical cables, Telephone Mo.No- HELMET- OK (PPE AND
2. Electrical improper path way. Lines. Etc. should be ascertained by 6370417428 SAFETY CLOTHING
3. Telecommunication competent authority before commencing SHOES-OK STANDARD)
4. Engineering services excavation work by cable detector & SAFETY
5. Pipeline(gas, water) cutting trial trench to be done up to 1.5 JACKET- OK SS/ENGG-15
6. Safety mtrs all around the area. Excavated soil SAFETY (STORAGE OF
7. Any other agency(if will be dumped/stacked 1.5 mtr. From GLOVES - OK CONSTRUCTIO
required) the edge of the excavated pit. Hand tools SAFETY N MATERIAL)
(if Underground utilities will be used with wooden handle only. GOGGLES-OK
Mr.Bhaskar Das
identified) Condition of tools will be checked every BARRICADING SS/ENGG-11
Gupta, Head RMP
Trial Trench to be done on all day before starting the job. Civil (TSL) –OK (SAFETY IN
four sides covering the A.2.2.2 Proper and safe path way to be Mo.N0- SPADE –OK MATERIAL
proposed area develop – Steps with handrails. 9040092694 PICK AXE –OK HANDLING
A.2.3) Collapse of side A.2.3.1 Shoring to be done wherever HAMMER –OK EQUIPMENT)
earth due to movement of required, Use of Safety Net at Sides. Mr. LN Goswami, CHISEL –OK
 Hand tools shifted
locomotives at adjacent Benching to be done minimum 1:1. Civil Engineer SHOVEL –OK SS/ENGG-13
to trial pit point (Parveen Cons)
track A.2.3.2 Discontinuation of excavation GAITA-OK (BARRICADING
 Manually dig the Mob No-
work during movement of locos at GAMLA –OK SAFETY)
trial pit marked area 9777344302
adjacent track. HAND PANJA –
 Identify the
OK SS/ENGG-01
underground utility Md.Abdus Salim,
A.2.4 Fall of person into pit A.2.4.1) Excavated area should be hard SLINGS –OK D- (EXCAVATION
 Marking the depth Site
A.2.5 Cable puncture barricaded with top and mid rails at SHACKLE- OK SAFETY)

TSL Representative Working agency Engineer


TATA STEEL M/s. PARVEEN CONSTRUCTION
Note: 1. This Safe Work Procedure shall be prepared by owner department countersigned by contractor's representative and safety department.
2. Sequence of work shall invoice step-by-step jobs.
3. All possible hazard including proximity hazard shall be amended and persons shall be identified.
4. With the change of working conditions, the procedure shall be amended and persons shall be trained
5. Review on status of implementation shall be done though task observation
6. Before start of the job, induction shall be given to persons engaged at site by departmental representative and Contractor's Representative.
EHSMSM/WORKS/9203/9217 SAFE WORK PROCEDURE – CIVIL & STRUCTURAL WORK 12 of 58 | P a g e
(Performance Criteria - Perfection in job with no injury to persons or damage to property) or damage to property REV

1. DEPARTMENT : RMP-Joda (ENGG & PROJECTS-Tata Steel Ltd.) DOC. NO: SWP/PAR/FAP/Joda/01 DATE:

2. SECTION / LOCATION : Ferro Plant, Joda NAME OF WORKING AGENCY: M/s. PARVEEN CONSTRUCTION
3. JOB TITLE : Civil works for Effluent Treatment Plant WORK ORDER No: 3800016542/109

JOB DURATION : Start Date: 01/01/2021 End Date: 30/06/2021


Persons Responsible Condition of Tools / Reference to
Sl.
Activities (Sequence of Work) Hazard Safety Precautions Name & P. No. Tackles required OK/Not document/criteria and
No.
Ok remarks
of utilities identified A.2.6 Electrocution height 1200 mm and 600 mm Supervioser(Parve SAFETY SS/GEN-54
 Alternate trial pits to respectively. en Cons) HELMET- OK (PPE AND
be made for A.2.4.2) Erect barricades at minimum of Mo.No- SAFETY CLOTHING
clarification of depth A.2.5.1) Under ground clearance will be 6370417428 SHOES-OK STANDARD)
of utilities are taken from Civil/Electrical/Mechanical SAFETY
eventual Engineers of Tata Steel/Consultant. JACKET- OK SS/ENGG-15
 Then the clearance Cable detector to be used to identify SAFETY (STORAGE OF
might be acquired underground cables insulated tools will GLOVES - OK CONSTRUCTIO
from the authorized be used during trail trench. Competent SAFETY N MATERIAL)
authority supervisor will be deployed for this GOGGLES-OK
activity. BARRICADING SS/ENGG-11
Mr.Bhaskar Das
A.2.6.1) appropriate PPEs like rubber Gupta, Head RMP –OK (SAFETY IN
hand gloves, safety shoes safety helmet Civil (TSL) SPADE –OK MATERIAL
etc. Will be used. Insulated hand tools Mo.N0- PICK AXE –OK HANDLING
will be used during excavation of trail pit 9040092694 HAMMER –OK EQUIPMENT)
1.5 meters distance from the edge of CHISEL –OK
excavation. Mr. LN Goswami, SHOVEL –OK SS/ENGG-13
A.2.4.3.) Provide Safety net on the side Civil Engineer GAITA-OK (BARRICADING
walls for protection against fall of (Parveen Cons) GAMLA –OK SAFETY)
boulders and loose materials must be Mob No- HAND PANJA –
9777344302
well anchored at the top. OK SS/ENGG-01
A.2.4.4) Proper approach to be provided Md.Abdus Salim, SLINGS -OK D- (EXCAVATION
(at least two nos.) SHACKLE- OK SAFETY)

TSL Representative Working agency Engineer


TATA STEEL M/s. PARVEEN CONSTRUCTION
Note: 1. This Safe Work Procedure shall be prepared by owner department countersigned by contractor's representative and safety department.
2. Sequence of work shall invoice step-by-step jobs.
3. All possible hazard including proximity hazard shall be amended and persons shall be identified.
4. With the change of working conditions, the procedure shall be amended and persons shall be trained
5. Review on status of implementation shall be done though task observation
6. Before start of the job, induction shall be given to persons engaged at site by departmental representative and Contractor's Representative.
EHSMSM/WORKS/9203/9217 SAFE WORK PROCEDURE – CIVIL & STRUCTURAL WORK 13 of 58 | P a g e
(Performance Criteria - Perfection in job with no injury to persons or damage to property) or damage to property REV

1. DEPARTMENT : RMP-Joda (ENGG & PROJECTS-Tata Steel Ltd.) DOC. NO: SWP/PAR/FAP/Joda/01 DATE:

2. SECTION / LOCATION : Ferro Plant, Joda NAME OF WORKING AGENCY: M/s. PARVEEN CONSTRUCTION
3. JOB TITLE : Civil works for Effluent Treatment Plant WORK ORDER No: 3800016542/109

JOB DURATION : Start Date: 01/01/2021 End Date: 30/06/2021


Persons Responsible Condition of Tools / Reference to
Sl.
Activities (Sequence of Work) Hazard Safety Precautions Name & P. No. Tackles required OK/Not document/criteria and
No.
Ok remarks
A.2.4.5). Stairs, ladders or ramps must Site SAFETY SS/GEN-54
be provided where workers are required Supervioser(Parve HELMET- OK (PPE AND
to enter trench excavations four feet or en Cons) SAFETY CLOTHING
more in depth. Mo.No- SHOES-OK STANDARD)
6370417428 SAFETY
A.2.4.6. At every part of a trench likely to
be frequented by the public, fences, JACKET- OK SS/ENGG-15
guards or barricades shall be provided to SAFETY (STORAGE OF
prevent persons falling into the trench. GLOVES - OK CONSTRUCTIO
A.2.4.7. Illumination shall be adequately SAFETY N MATERIAL)
provided for night work GOGGLES-OK
A.2.5.Electrocution A.2.5.1. Using of insulated tools for BARRICADING SS/ENGG-11
manual excavation tools with woden –OK (SAFETY IN
Mr.Bhaskar Das
handle. Gupta, Head RMP SPADE –OK MATERIAL
A.2.5.2.Useing of appropriate PPEs. Civil (TSL) PICK AXE –OK HANDLING
Mo.N0- HAMMER –OK EQUIPMENT)
9040092694 CHISEL –OK
C.1. Hard barricading the C.1.Fall of person into pit C.2.1. Erect barricades at minimum of SHOVEL –OK SS/ENGG-13
excavation demarcated 1.5 meters distance from the edge of Mr. LN Goswami, GAITA-OK (BARRICADING
area excavation. (As per site condition). Civil Engineer GAMLA –OK SAFETY)
 Survey points are C.2.2.Excavated area should be hard (Parveen Cons) HAND PANJA –
Mob No- OK
observed as per barricaded with top and mid rails at SS/ENGG-01
9777344302
drawing height 1200 mm and 600 mm SLINGS -OK D- (EXCAVATION
 Top point provided for respectively. (As per site condition). SHACKLE- OK SAFETY)

TSL Representative Working agency Engineer


TATA STEEL M/s. PARVEEN CONSTRUCTION
Note: 1. This Safe Work Procedure shall be prepared by owner department countersigned by contractor's representative and safety department.
2. Sequence of work shall invoice step-by-step jobs.
3. All possible hazard including proximity hazard shall be amended and persons shall be identified.
4. With the change of working conditions, the procedure shall be amended and persons shall be trained
5. Review on status of implementation shall be done though task observation
6. Before start of the job, induction shall be given to persons engaged at site by departmental representative and Contractor's Representative.
EHSMSM/WORKS/9203/9217 SAFE WORK PROCEDURE – CIVIL & STRUCTURAL WORK 14 of 58 | P a g e
(Performance Criteria - Perfection in job with no injury to persons or damage to property) or damage to property REV

1. DEPARTMENT : RMP-Joda (ENGG & PROJECTS-Tata Steel Ltd.) DOC. NO: SWP/PAR/FAP/Joda/01 DATE:

2. SECTION / LOCATION : Ferro Plant, Joda NAME OF WORKING AGENCY: M/s. PARVEEN CONSTRUCTION
3. JOB TITLE : Civil works for Effluent Treatment Plant WORK ORDER No: 3800016542/109

JOB DURATION : Start Date: 01/01/2021 End Date: 30/06/2021


Persons Responsible Condition of Tools / Reference to
Sl.
Activities (Sequence of Work) Hazard Safety Precautions Name & P. No. Tackles required OK/Not document/criteria and
No.
Ok remarks
demarcation Md.Abdus Salim, SAFETY SS/GEN-54
4. Site HELMET- OK (PPE AND
HOT JOBS ( GAS A.1.1 Leakage of A1.1. Trolley should be placed on firm Supervioser(Parve SAFETY CLOTHING
CUTTING OF STEEL inflammable gas. ground and ensure prevention of en Cons) SHOES-OK STANDARD)
Mo.No-
MAST) toppling. SAFETY
6370417428
A. OXYFUEL GAS A.1. 2. Toppling of trolley. A.1.2.Oxygen/LPG cylinder is to be kept JACKET- OK SS/ENGG-15
CUTTING (Oxygen and in upright position on trolley with proper SAFETY (STORAGE OF
LPG) tie by chain. GLOVES - OK CONSTRUCTIO
A.1. Shifting of cylinders. A.2.1. Cylinder must be placed on SAFETY N MATERIAL)
 Manually using trolley designated stand and secure by chain GOGGLES-OK
 Mechanized using only. BARRICADING SS/ENGG-11
cylinder cage A.2.Falling of cylinders. A.2.2. Gas cylinder should be stored at –OK (SAFETY IN
isolated place. Maximum 5 nos. of MATERIAL
A.2. Placing of cylinders. cylinder will be stored in a one place Mr.Bhaskar Das SPADE –OK HANDLING
 Placing the cylinder in A.2.3 Cylinders shall be kept far enough Gupta, Head RMP PICK AXE –OK EQUIPMENT)
trolley/cage in upright away from the actual welding or cutting Civil (TSL) HAMMER –OK
position operation so that sparks, hot slag, or Mo.N0- CHISEL –OK SS/ENGG-13
 Securing cylinders with flame will not reach them. When this is 9040092694 SHOVEL –OK (BARRICADING
chains or ropes impractical, fire resistant shields shall be GAITA-OK SAFETY)
individually provided. Minimum distance in between Mr. LN Goswami, GAMLA –OK SS/ENGG-05
O2 &LPG will be 3mtr. Civil Engineer HAND PANJA – (WELDING AND
(Parveen Cons)
A.2.4 Cylinders shall be placed where OK CUTTING
Mob No-
they cannot become part of an electrical SLINGS -OK SAFETY)

TSL Representative Working agency Engineer


TATA STEEL M/s. PARVEEN CONSTRUCTION
Note: 1. This Safe Work Procedure shall be prepared by owner department countersigned by contractor's representative and safety department.
2. Sequence of work shall invoice step-by-step jobs.
3. All possible hazard including proximity hazard shall be amended and persons shall be identified.
4. With the change of working conditions, the procedure shall be amended and persons shall be trained
5. Review on status of implementation shall be done though task observation
6. Before start of the job, induction shall be given to persons engaged at site by departmental representative and Contractor's Representative.
EHSMSM/WORKS/9203/9217 SAFE WORK PROCEDURE – CIVIL & STRUCTURAL WORK 15 of 58 | P a g e
(Performance Criteria - Perfection in job with no injury to persons or damage to property) or damage to property REV

1. DEPARTMENT : RMP-Joda (ENGG & PROJECTS-Tata Steel Ltd.) DOC. NO: SWP/PAR/FAP/Joda/01 DATE:

2. SECTION / LOCATION : Ferro Plant, Joda NAME OF WORKING AGENCY: M/s. PARVEEN CONSTRUCTION
3. JOB TITLE : Civil works for Effluent Treatment Plant WORK ORDER No: 3800016542/109

JOB DURATION : Start Date: 01/01/2021 End Date: 30/06/2021


Persons Responsible Condition of Tools / Reference to
Sl.
Activities (Sequence of Work) Hazard Safety Precautions Name & P. No. Tackles required OK/Not document/criteria and
No.
Ok remarks
circuit. Cylinder not to place in direct sun. 9777344302 SAFETY SS/GEN-54
Canopy will be provided. HELMET- OK (PPE AND
A.2.5..Fuel gas cylinders shall be placed Md.Abdus Salim, SAFETY CLOTHING
with valve end up whenever they are in Site SHOES-OK STANDARD)
Supervioser(Parve
use. They shall not be placed in a SAFETY
en Cons)
location where they would be subject to Mo.No- JACKET- OK SS/ENGG-15
open flame, hot metal, or other sources 6370417428 SAFETY (STORAGE OF
of artificial heat. GLOVES - OK CONSTRUCTIO
A.2.7. Cylinders containing oxygen or SAFETY N MATERIAL)
LPG shall not be taken into confined GOGGLES-OK
spaces. BARRICADING SS/ENGG-11
A.2.8. Max 5 LPG cylinder should be –OK (SAFETY IN
stored at one place MATERIAL
A.3. Assembling of gas Mr.Bhaskar Das SPADE –OK HANDLING
cutting apparatus. Gupta, Head RMP PICK AXE –OK EQUIPMENT)
 With the use of hand A.3.1. Use of defective A.3.1.Inspect all apparatus physical Civil (TSL) HAMMER –OK
tools fixing the clamps apparatus. condition prior to use and remove items Mo.N0- CHISEL –OK SS/ENGG-13
 Griping the regulators A.3.2. Improper assembling. from service if found faults. 9040092694 SHOVEL –OK (BARRICADING
with proper lock pins A.3.2.Red hose for LPG and Black hose GAITA-OK SAFETY)
Mr. LN Goswami,
 Checks for leakage for Oxygen shall be used. GAMLA –OK SS/ENGG-05
Civil Engineer
 Checks for wear and A.3.3 Only 3 pipe cutting torches shall be (Parveen Cons) HAND PANJA – (WELDING &
tear used along with flashback arrestors at Mob No- OK CUTTING
the both ends. 9777344302 SLINGS -OK SAFETY)

TSL Representative Working agency Engineer


TATA STEEL M/s. PARVEEN CONSTRUCTION
Note: 1. This Safe Work Procedure shall be prepared by owner department countersigned by contractor's representative and safety department.
2. Sequence of work shall invoice step-by-step jobs.
3. All possible hazard including proximity hazard shall be amended and persons shall be identified.
4. With the change of working conditions, the procedure shall be amended and persons shall be trained
5. Review on status of implementation shall be done though task observation
6. Before start of the job, induction shall be given to persons engaged at site by departmental representative and Contractor's Representative.
EHSMSM/WORKS/9203/9217 SAFE WORK PROCEDURE – CIVIL & STRUCTURAL WORK 16 of 58 | P a g e
(Performance Criteria - Perfection in job with no injury to persons or damage to property) or damage to property REV

1. DEPARTMENT : RMP-Joda (ENGG & PROJECTS-Tata Steel Ltd.) DOC. NO: SWP/PAR/FAP/Joda/01 DATE:

2. SECTION / LOCATION : Ferro Plant, Joda NAME OF WORKING AGENCY: M/s. PARVEEN CONSTRUCTION
3. JOB TITLE : Civil works for Effluent Treatment Plant WORK ORDER No: 3800016542/109

JOB DURATION : Start Date: 01/01/2021 End Date: 30/06/2021


Persons Responsible Condition of Tools / Reference to
Sl.
Activities (Sequence of Work) Hazard Safety Precautions Name & P. No. Tackles required OK/Not document/criteria and
No.
Ok remarks
A.3.4. Hose couplings shall be tied of SAFETY SS/GEN-54
with Jubilee clamps. Md.Abdus Salim, HELMET- OK (PPE AND
A.3.5. Oxygen and fuel gas pressure Site SAFETY CLOTHING
regulators, including their related Supervioser(Parve SHOES-OK STANDARD)
en Cons)
gauges, shall be in proper working order SAFETY
Mo.No-
while in use. 6370417428 JACKET- OK SS/ENGG-15
A.3.6. Valve protection caps shall be in SAFETY (STORAGE OF
place and secured. GLOVES - OK CONSTRUCTIO
A.4. Routing of hose. SAFETY N MATERIAL)
 Routing the hose to job A.4.1.Cut on hose due to A.4.1. Ensure proper routing of hose GOGGLES-OK
point improper routing or contact pipes along with designated holders and BARRICADING SS/ENGG-11
 Identifying thermal with sharp edges. protect sharp edges with suitable –OK (SAFETY IN
sources not in routing packing. MATERIAL
path which could A.4.2. Gas hoses routing/ A.4.2.1. Hoses shall not be kept or Mr.Bhaskar Das SPADE –OK HANDLING
damage the hose crossing on the access routing on passageways, ladders and Gupta, Head RMP PICK AXE –OK EQUIPMENT)
 Checks for free of water road. stairs. Civil (TSL) HAMMER –OK
accumulation and A.4.2.2. If required hose pipes should be Mo.N0- CHISEL –OK SS/ENGG-13
vehicle/personal laid through metal pipes for crossing the 9040092694 SHOVEL –OK (BARRICADING
movement access road. GAITA-OK SAFETY)
A.4.3. Entanglement of gas A.4.3. Gas hoses and electrical cable Mr. LN Goswami, GAMLA –OK SS/ENGG-05
Civil Engineer
hoses with electrical cables should not be allowed to touch each HAND PANJA – (WELDING &
(Parveen Cons)
other and must have a minimum distance Mob No- OK CUTTING
of 250mm between them, SLINGS -OK SAFETY)

TSL Representative Working agency Engineer


TATA STEEL M/s. PARVEEN CONSTRUCTION
Note: 1. This Safe Work Procedure shall be prepared by owner department countersigned by contractor's representative and safety department.
2. Sequence of work shall invoice step-by-step jobs.
3. All possible hazard including proximity hazard shall be amended and persons shall be identified.
4. With the change of working conditions, the procedure shall be amended and persons shall be trained
5. Review on status of implementation shall be done though task observation
6. Before start of the job, induction shall be given to persons engaged at site by departmental representative and Contractor's Representative.
EHSMSM/WORKS/9203/9217 SAFE WORK PROCEDURE – CIVIL & STRUCTURAL WORK 17 of 58 | P a g e
(Performance Criteria - Perfection in job with no injury to persons or damage to property) or damage to property REV

1. DEPARTMENT : RMP-Joda (ENGG & PROJECTS-Tata Steel Ltd.) DOC. NO: SWP/PAR/FAP/Joda/01 DATE:

2. SECTION / LOCATION : Ferro Plant, Joda NAME OF WORKING AGENCY: M/s. PARVEEN CONSTRUCTION
3. JOB TITLE : Civil works for Effluent Treatment Plant WORK ORDER No: 3800016542/109

JOB DURATION : Start Date: 01/01/2021 End Date: 30/06/2021


Persons Responsible Condition of Tools / Reference to
Sl.
Activities (Sequence of Work) Hazard Safety Precautions Name & P. No. Tackles required OK/Not document/criteria and
No.
Ok remarks
9777344302 SAFETY SS/GEN-54
HELMET- OK (PPE AND
A.5. Executing gas Md.Abdus Salim, SAFETY CLOTHING
cutting operations A.5.1. Fire/explosion A.5.1.1 Oxygen/LPG cylinder is to be Site SHOES-OK STANDARD)
Supervioser(Parve
 Checking the torch for kept in upright position on trolley with SAFETY
en Cons)
easy air flow proper tie by chain as far a possible at Mo.No- JACKET- OK SS/ENGG-15
 Igniting the torch with working site. 6370417428 SAFETY (STORAGE OF
the help of igniter A.5.1.2 Gas hoses, regulators and all GLOVES - OK CONSTRUCTIO
 Before cutting the job associated apparatus will be regularly SAFETY N MATERIAL)
check for combustibles checked prior to start of job. GOGGLES-OK
nearby workplace A.5.1.3 All inflammable materials will be BARRICADING SS/ENGG-11
 Also verify the supports removed from site on daily basis. –OK (SAFETY IN
provided properly A.5.1.4.Generated scrap (inflammable MATERIAL
 Using appropriate PPE materials) removal will be done on SPADE –OK HANDLING
 Restricting continuous basis and proper area Mr.Bhaskar Das PICK AXE –OK EQUIPMENT)
unauthorized personal housekeeping to be maintained at site. Gupta, Head RMP HAMMER –OK
entry A.5.1.5.Sufficient number of fire Civil (TSL) CHISEL –OK SS/ENGG-13
extinguisher & sand buckets will be kept Mo.N0- SHOVEL –OK (BARRICADING
at site. Fire watcher to be provided at hot 9040092694 GAITA-OK SAFETY)
job. GAMLA –OK SS/ENGG-05
Mr. LN Goswami,
HAND PANJA – (WELDING AND
Civil Engineer
A.5.2. Burn injury A.5.2.1. Relevant PPE's to be used (Parveen Cons) OK CUTTING
during performing the cutting jobs (Safety SLINGS -OK SAFETY)

TSL Representative Working agency Engineer


TATA STEEL M/s. PARVEEN CONSTRUCTION
Note: 1. This Safe Work Procedure shall be prepared by owner department countersigned by contractor's representative and safety department.
2. Sequence of work shall invoice step-by-step jobs.
3. All possible hazard including proximity hazard shall be amended and persons shall be identified.
4. With the change of working conditions, the procedure shall be amended and persons shall be trained
5. Review on status of implementation shall be done though task observation
6. Before start of the job, induction shall be given to persons engaged at site by departmental representative and Contractor's Representative.
EHSMSM/WORKS/9203/9217 SAFE WORK PROCEDURE – CIVIL & STRUCTURAL WORK 18 of 58 | P a g e
(Performance Criteria - Perfection in job with no injury to persons or damage to property) or damage to property REV

1. DEPARTMENT : RMP-Joda (ENGG & PROJECTS-Tata Steel Ltd.) DOC. NO: SWP/PAR/FAP/Joda/01 DATE:

2. SECTION / LOCATION : Ferro Plant, Joda NAME OF WORKING AGENCY: M/s. PARVEEN CONSTRUCTION
3. JOB TITLE : Civil works for Effluent Treatment Plant WORK ORDER No: 3800016542/109

JOB DURATION : Start Date: 01/01/2021 End Date: 30/06/2021


Persons Responsible Condition of Tools / Reference to
Sl.
Activities (Sequence of Work) Hazard Safety Precautions Name & P. No. Tackles required OK/Not document/criteria and
No.
Ok remarks
goggles, full body apron, hand shelves, Mob No- SAFETY SS/GEN-54
leg guards). 9777344302 HELMET- OK (PPE AND
SAFETY CLOTHING
A.5.3. Eye Stress/Injury A.5.3.1. Relevant eye protection PPE's Md.Abdus Salim, SHOES-OK STANDARD)
Site
to be used during performing the cutting SAFETY
Supervioser(Parve
jobs (Cutting goggles/shield). en Cons) JACKET- OK SS/ENGG-15
Mo.No- SAFETY (STORAGE OF
A.5.3.2Take rest time to time and wash 6370417428 GLOVES - OK CONSTRUCTIO
A.5.4. Back Fire/ Flash back eye with cold water SAFETY N MATERIAL)
Fire. GOGGLES-OK
A.5.4.1. Clogged torch tip openings shall BARRICADING SS/ENGG-11
be cleaned with suitable cleaning wires, –OK (SAFETY IN
drills, or other devices designed for such MATERIAL
purpose. SPADE –OK HANDLING
A.5.4.2. Torches and flashback arrestors PICK AXE –OK EQUIPMENT)
in use shall be inspected at the Mr.Bhaskar Das HAMMER –OK
beginning of each working shift for Gupta, Head RMP CHISEL –OK SS/ENGG-13
leaking shutoff valves, hose couplings, Civil (TSL) SHOVEL –OK (BARRICADING
and tip connections. Defective items Mo.N0- GAITA-OK SAFETY)
shall not be used and be removed from 9040092694 GAMLA –OK SS/ENGG-05
site. HAND PANJA – (WELDING AND
Mr. LN Goswami,
A.5.5. Falling of spatter. Civil Engineer OK CUTTING
A.5.5.1. Gas cylinders will be kept away SLINGS -OK SAFETY)

TSL Representative Working agency Engineer


TATA STEEL M/s. PARVEEN CONSTRUCTION
Note: 1. This Safe Work Procedure shall be prepared by owner department countersigned by contractor's representative and safety department.
2. Sequence of work shall invoice step-by-step jobs.
3. All possible hazard including proximity hazard shall be amended and persons shall be identified.
4. With the change of working conditions, the procedure shall be amended and persons shall be trained
5. Review on status of implementation shall be done though task observation
6. Before start of the job, induction shall be given to persons engaged at site by departmental representative and Contractor's Representative.
EHSMSM/WORKS/9203/9217 SAFE WORK PROCEDURE – CIVIL & STRUCTURAL WORK 19 of 58 | P a g e
(Performance Criteria - Perfection in job with no injury to persons or damage to property) or damage to property REV

1. DEPARTMENT : RMP-Joda (ENGG & PROJECTS-Tata Steel Ltd.) DOC. NO: SWP/PAR/FAP/Joda/01 DATE:

2. SECTION / LOCATION : Ferro Plant, Joda NAME OF WORKING AGENCY: M/s. PARVEEN CONSTRUCTION
3. JOB TITLE : Civil works for Effluent Treatment Plant WORK ORDER No: 3800016542/109

JOB DURATION : Start Date: 01/01/2021 End Date: 30/06/2021


Persons Responsible Condition of Tools / Reference to
Sl.
Activities (Sequence of Work) Hazard Safety Precautions Name & P. No. Tackles required OK/Not document/criteria and
No.
Ok remarks
from heat & fire. It will be kept away from (Parveen Cons) SAFETY SS/GEN-54
falling splinters/ molten materials. Mob No- HELMET- OK (PPE AND
A.5.5. Ceramic cloth & temporary sheets 9777344302 SAFETY CLOTHING
shall be use to arrest falling spatters and SHOES-OK STANDARD)
Md.Abdus Salim,
avoid any fire incident. SAFETY
Site
Supervioser(Parve JACKET- OK SS/ENGG-15
5. en Cons) SAFETY (STORAGE OF
Mo.No- GLOVES - OK CONSTRUCTIO
A.1 Fall of Person due to A.1.1. Provide access to work location 6370417428 SAFETY N MATERIAL)
improper access and and ensure that all working platforms to GOGGLES-OK
Concrete Works working platform. constructed adequately and have stable BARRICADING SS/ENGG-11
Deployment of workmen handrail & toe guards –OK (SAFETY IN
for concreting MATERIAL
 Provision of grating A.2. Contact with concrete SPADE –OK HANDLING
above the Material A.2.1. All persons engaged in concreting PICK AXE –OK EQUIPMENT)
 Personals provided with work will use proper PPEs: Gumboot, HAMMER –OK
appropriate PPE Rubber Hand gloves, Safety goggles, Mr.Bhaskar Das CHISEL –OK SS/ENGG-13
Gupta, Head RMP SHOVEL –OK (BARRICADING
Safety Helmet, Noise/Dust Mask,. Civil (TSL) GAITA-OK SAFETY)
Mo.N0- GAMLA –OK
9040092694
HAND PANJA –
Mr. LN Goswami, OK
SLINGS -OK

TSL Representative Working agency Engineer


TATA STEEL M/s. PARVEEN CONSTRUCTION
Note: 1. This Safe Work Procedure shall be prepared by owner department countersigned by contractor's representative and safety department.
2. Sequence of work shall invoice step-by-step jobs.
3. All possible hazard including proximity hazard shall be amended and persons shall be identified.
4. With the change of working conditions, the procedure shall be amended and persons shall be trained
5. Review on status of implementation shall be done though task observation
6. Before start of the job, induction shall be given to persons engaged at site by departmental representative and Contractor's Representative.
EHSMSM/WORKS/9203/9217 SAFE WORK PROCEDURE – CIVIL & STRUCTURAL WORK 20 of 58 | P a g e
(Performance Criteria - Perfection in job with no injury to persons or damage to property) or damage to property REV

1. DEPARTMENT : RMP-Joda (ENGG & PROJECTS-Tata Steel Ltd.) DOC. NO: SWP/PAR/FAP/Joda/01 DATE:

2. SECTION / LOCATION : Ferro Plant, Joda NAME OF WORKING AGENCY: M/s. PARVEEN CONSTRUCTION
3. JOB TITLE : Civil works for Effluent Treatment Plant WORK ORDER No: 3800016542/109

JOB DURATION : Start Date: 01/01/2021 End Date: 30/06/2021


Persons Responsible Condition of Tools / Reference to
Sl.
Activities (Sequence of Work) Hazard Safety Precautions Name & P. No. Tackles required OK/Not document/criteria and
No.
Ok remarks
Civil Engineer SAFETY SS/GEN-54
(Parveen Cons) HELMET- OK (PPE AND
6 Mob No- SAFETY CLOTHING
5.1. Improper lifting of Mast 9777344302 SHOES-OK STANDARD)
5.1.1Engage adequate nos of workman SAFETY
Md.Abdus Salim,
for lifting and shifting of light poles. JACKET- OK SS/ENGG-15
Site
Erection Of O.H.E. Mast 5.2. Defective lifting tackles/ 5.2.1. Required capacity and tested tools Supervioser(Parve SAFETY (STORAGE OF
equipment and tackles should be used. en Cons) GLOVES - OK CONSTRUCTIO
5.2.2. Ensure proper signaling/ co- Mo.No- SAFETY N MATERIAL)
 Mechanized shifting
ordination between crane operator and 6370417428 GOGGLES-OK
using lifting equipment,
5.3. Improper erection of signal man. BARRICADING SS/ENGG-11
sling and d-shackle
poles may lead to serious 5.3.1. Ensure Close supervision while –OK (SAFETY IN
 Loading in truck
injury due to fall of poles pole erection. MATERIAL
 Transporting to
5.3.2. Avoid lifting and erection of poles SPADE –OK HANDLING
workplace
during heavy wind. PICK AXE –OK EQUIPMENT)
 Unloading using lifting
equipment, sling and d- HAMMER –OK
7. shackle CHISEL –OK SS/ENGG-13
Mr.Bhaskar Das SHOVEL –OK (BARRICADING
 Manually using ropes Gupta, Head RMP GAITA-OK SAFETY)
6.1.Fall from height 6.1.1. Use of quality Safety belt and Civil (TSL) GAMLA –OK
ladders trolley Mo.N0-
HAND PANJA – SS/ENGG -04
Working At Height 9040092694
6.2. Slip of Materials OK (WORKING AT
6.2.1. persons working on ground should SLINGS -OK HEIGHT)

TSL Representative Working agency Engineer


TATA STEEL M/s. PARVEEN CONSTRUCTION
Note: 1. This Safe Work Procedure shall be prepared by owner department countersigned by contractor's representative and safety department.
2. Sequence of work shall invoice step-by-step jobs.
3. All possible hazard including proximity hazard shall be amended and persons shall be identified.
4. With the change of working conditions, the procedure shall be amended and persons shall be trained
5. Review on status of implementation shall be done though task observation
6. Before start of the job, induction shall be given to persons engaged at site by departmental representative and Contractor's Representative.
EHSMSM/WORKS/9203/9217 SAFE WORK PROCEDURE – CIVIL & STRUCTURAL WORK 21 of 58 | P a g e
(Performance Criteria - Perfection in job with no injury to persons or damage to property) or damage to property REV

1. DEPARTMENT : RMP-Joda (ENGG & PROJECTS-Tata Steel Ltd.) DOC. NO: SWP/PAR/FAP/Joda/01 DATE:

2. SECTION / LOCATION : Ferro Plant, Joda NAME OF WORKING AGENCY: M/s. PARVEEN CONSTRUCTION
3. JOB TITLE : Civil works for Effluent Treatment Plant WORK ORDER No: 3800016542/109

JOB DURATION : Start Date: 01/01/2021 End Date: 30/06/2021


Persons Responsible Condition of Tools / Reference to
Sl.
Activities (Sequence of Work) Hazard Safety Precautions Name & P. No. Tackles required OK/Not document/criteria and
No.
Ok remarks

 Erection Of Iron & steel use proper PPE Mr. LN Goswami, SAFETY SS/GEN-54
Structure Civil Engineer HELMET- OK (PPE AND
 Erection of Insulator (Parveen Cons) SAFETY CLOTHING
8. Mob No- SHOES-OK STANDARD)
7.1.1. Cable routing i.e. Overhead: 9777344302
7.1. Improper cable routing SAFETY
and laying. should be routed through insulated Md.Abdus Salim, JACKET- OK SS/ENGG-15
hooks and above man height. Site SAFETY (STORAGE OF
Supervioser(Parve GLOVES - OK CONSTRUCTIO
Over Head SAFETY N MATERIAL)
7.1.2. Use of appropriate PPE for en Cons)
Cable/Conductor laying handling cables. Mo.No- GOGGLES-OK
6370417428 BARRICADING SS/ENGG-11
 Identifying the route of 7.2 Fall of persons from 7.2.1 Use of ladder trolley. The ladder –OK (SAFETY IN
cable laying height in ladder MATERIAL
trolley to be certified from competent
 Checks for obstruction trolley/genie/staging SPADE –OK HANDLING
in routing the cable authority of TSL.
PICK AXE –OK EQUIPMENT)
 Since it is temporary HAMMER –OK
cable needs to be 7.2.2 Use of full body safety harness.
CHISEL –OK SS/ENGG-13
routed overhead SHOVEL –OK (BARRICADING
7.2.3. Use of vertical and horizontal life Mr.Bhaskar Das GAITA-OK SAFETY)
lines while working at height. Gupta, Head RMP GAMLA –OK
Civil (TSL)
HAND PANJA – SS/ENGG -04
7.3.1 Use of toe guard at height Mo.N0-
7.3 Fall of tools and tackles 9040092694 OK (WORKING AT
from height in ladder trolley SLINGS -OK HEIGHT)

TSL Representative Working agency Engineer


TATA STEEL M/s. PARVEEN CONSTRUCTION
Note: 1. This Safe Work Procedure shall be prepared by owner department countersigned by contractor's representative and safety department.
2. Sequence of work shall invoice step-by-step jobs.
3. All possible hazard including proximity hazard shall be amended and persons shall be identified.
4. With the change of working conditions, the procedure shall be amended and persons shall be trained
5. Review on status of implementation shall be done though task observation
6. Before start of the job, induction shall be given to persons engaged at site by departmental representative and Contractor's Representative.
EHSMSM/WORKS/9203/9217 SAFE WORK PROCEDURE – CIVIL & STRUCTURAL WORK 22 of 58 | P a g e
(Performance Criteria - Perfection in job with no injury to persons or damage to property) or damage to property REV

1. DEPARTMENT : RMP-Joda (ENGG & PROJECTS-Tata Steel Ltd.) DOC. NO: SWP/PAR/FAP/Joda/01 DATE:

2. SECTION / LOCATION : Ferro Plant, Joda NAME OF WORKING AGENCY: M/s. PARVEEN CONSTRUCTION
3. JOB TITLE : Civil works for Effluent Treatment Plant WORK ORDER No: 3800016542/109

JOB DURATION : Start Date: 01/01/2021 End Date: 30/06/2021


Persons Responsible Condition of Tools / Reference to
Sl.
Activities (Sequence of Work) Hazard Safety Precautions Name & P. No. Tackles required OK/Not document/criteria and
No.
Ok remarks
7.3.2 Tieing of tools and tackles with SAFETY SS/ELECT-01
hand to prevent falling of materials from Mr. LN Goswami, HELMET- OK (SAFETY
Civil Engineer SAFETY STANDARD
height. (Parveen Cons) SHOES-OK FOR
Mob No-
7.4 Injury to persons due to 7.4.1 Use of appropriate PPE by working SAFETY TEMPORARY
9777344302
fall of materials from height. persons. JACKET- OK ELECTRICAL
Md.Abdus Salim, SAFETY WIRING)
7.4.2 Only authorized persons will be Site GLOVES - OK
Supervioser(Parve SAFETY SS/ELEC -09
allowed to working at height having
en Cons) GOGGLES-OK (FIRE SAFETY
height pass and proper medical checkup. Mo.No- BARRICADING IN CABLE
7.5 Electrocution of persons 6370417428 –OK RUNS)
7.5.1 Shut down/Positive Isolation of
due to induction at
crossover adjacent OHE line. SPADE –OK
PICK AXE –OK
7.5.2 Use of appropriate PPE’s by HAMMER –OK
working persons at site. CHISEL –OK
SHOVEL –OK
7.5.3 Use of discharge rods at both GAITA-OK
sides. Mr.Bhaskar Das GAMLA –OK
Gupta, Head RMP
HAND PANJA –
7.5.4 Use of earthing strips at steel mast. Civil (TSL)
Mo.N0- OK
SLINGS -OK

TSL Representative Working agency Engineer


TATA STEEL M/s. PARVEEN CONSTRUCTION
Note: 1. This Safe Work Procedure shall be prepared by owner department countersigned by contractor's representative and safety department.
2. Sequence of work shall invoice step-by-step jobs.
3. All possible hazard including proximity hazard shall be amended and persons shall be identified.
4. With the change of working conditions, the procedure shall be amended and persons shall be trained
5. Review on status of implementation shall be done though task observation
6. Before start of the job, induction shall be given to persons engaged at site by departmental representative and Contractor's Representative.
EHSMSM/WORKS/9203/9217 SAFE WORK PROCEDURE – CIVIL & STRUCTURAL WORK 23 of 58 | P a g e
(Performance Criteria - Perfection in job with no injury to persons or damage to property) or damage to property REV

1. DEPARTMENT : RMP-Joda (ENGG & PROJECTS-Tata Steel Ltd.) DOC. NO: SWP/PAR/FAP/Joda/01 DATE:

2. SECTION / LOCATION : Ferro Plant, Joda NAME OF WORKING AGENCY: M/s. PARVEEN CONSTRUCTION
3. JOB TITLE : Civil works for Effluent Treatment Plant WORK ORDER No: 3800016542/109

JOB DURATION : Start Date: 01/01/2021 End Date: 30/06/2021


Persons Responsible Condition of Tools / Reference to
Sl.
Activities (Sequence of Work) Hazard Safety Precautions Name & P. No. Tackles required OK/Not document/criteria and
No.
Ok remarks
9 Leakage of inflammable gas. 9040092694 SAFETY SS/GEN-54
HELMET- OK (PPE AND
Toppling of trolley. Trolley should be placed on firm ground and Mr. LN Goswami, SAFETY CLOTHING
ensure prevention of toppling.Oxygen/LPG Civil Engineer SHOES-OK STANDARD)
Falling of cylinders. (Parveen Cons)
cylinder is to be kept in upright position on SAFETY
Mob No-
trolley with proper tie by chain.Cylinder cap need 9777344302 JACKET- OK SS/ENGG-15
Hot Jobs: (Gas Cutting, Welding SAFETY (STORAGE OF
to be ensured.Cylinder must be placed on
& Grinding Md.Abdus Salim, GLOVES - OK CONSTRUCTIO
Use of defective apparatus. designated stand and secure by chain only.
Site SAFETY N MATERIAL)
A.Oxyfuel Gas Cutting (Oxygen and Supervioser(Parve GOGGLES-OK
Lpg) Improper assembling. When this is impractical, fire resistant shields
shall be provided. Minimum distance in between
en Cons) BARRICADING SS/ENGG-11
Mo.No- –OK (SAFETY IN
Shifting of cylinders. Manually using O2 & LPG will be 3 mtr. Cylinders shall be place 6370417428 MATERIAL
trolley mechanized using cylinder where they cannot become part of an electrical SPADE –OK HANDLING
cage circuit. Cylinders containing oxygen or LPG shall PICK AXE –OK EQUIPMENT)
not be taken into confined spaces. Max 5 LPG Or HAMMER –OK
Placing of cylindersin trolley/cage in
upright position 100kg cylinder should be stored at one place. CHISEL –OK SS/ENGG-13
SHOVEL –OK (BARRICADING
Securing cylinders with chains or Inspect all apparatus physical condition prior to GAITA-OK SAFETY)
ropes individually use and remove items from service if found GAMLA –OK SS/ENGG-05
Assembling of gas cutting Mr.Bhaskar Das
faults. HAND PANJA – (WELDING AND
apparatus. With the use of Gupta, Head RMP
Civil (TSL) OK CUTTING
hand tools fixing the clamps. Red hose for LPG and Black hose for oxygen shall be SLINGS -OK SAFETY)

TSL Representative Working agency Engineer


TATA STEEL M/s. PARVEEN CONSTRUCTION
Note: 1. This Safe Work Procedure shall be prepared by owner department countersigned by contractor's representative and safety department.
2. Sequence of work shall invoice step-by-step jobs.
3. All possible hazard including proximity hazard shall be amended and persons shall be identified.
4. With the change of working conditions, the procedure shall be amended and persons shall be trained
5. Review on status of implementation shall be done though task observation
6. Before start of the job, induction shall be given to persons engaged at site by departmental representative and Contractor's Representative.
EHSMSM/WORKS/9203/9217 SAFE WORK PROCEDURE – CIVIL & STRUCTURAL WORK 24 of 58 | P a g e
(Performance Criteria - Perfection in job with no injury to persons or damage to property) or damage to property REV

1. DEPARTMENT : RMP-Joda (ENGG & PROJECTS-Tata Steel Ltd.) DOC. NO: SWP/PAR/FAP/Joda/01 DATE:

2. SECTION / LOCATION : Ferro Plant, Joda NAME OF WORKING AGENCY: M/s. PARVEEN CONSTRUCTION
3. JOB TITLE : Civil works for Effluent Treatment Plant WORK ORDER No: 3800016542/109

JOB DURATION : Start Date: 01/01/2021 End Date: 30/06/2021


Persons Responsible Condition of Tools / Reference to
Sl.
Activities (Sequence of Work) Hazard Safety Precautions Name & P. No. Tackles required OK/Not document/criteria and
No.
Ok remarks
Griping the regulators with used. Only 3 pipe cutting torches shall be used along Mo.N0- SAFETY SS/GEN-54
proper lock pins. Checks of 9040092694 HELMET- OK (PPE AND
leakage with flashback arrestors at the both ends. Hose SAFETY CLOTHING
coupling shall be tied of with jubilee clamps. Oxygen Mr. LN Goswami, SHOES-OK STANDARD)
and fuel gas pressure regulators, including their Civil Engineer
SAFETY
related gauges, shall be in proper working order while (Parveen Cons)
Mob No- JACKET- OK SS/ENGG-15
in use. Valve protection caps shall be in place and SAFETY (STORAGE OF
Cut on hose due to improper secured.
9777344302
GLOVES - OK CONSTRUCTIO
routing or contact with sharp SAFETY N MATERIAL)
Md.Abdus Salim,
edges.Gas hoses routing/crossing Ensure proper routing of hose pipes along with
Site GOGGLES-OK
on the access road. designated holder and protect sharp edges with Supervioser(Parve BARRICADING SS/ENGG-11
suitable packing. Hoses shall not be kept or en Cons) –OK (SAFETY IN
Routing of hose. Routing the hose to Entanglement of gas hoses with routing on passageways, ladders and stairs.If Mo.No- MATERIAL
job point electrical cables required hose pipes should be laid through metal 6370417428 SPADE –OK HANDLING
pipes for crossing the access road. Gas hoses and PICK AXE –OK EQUIPMENT)
Indentifying thermal sources not in Fire / explosion HAMMER –OK
electrical cable should not be allowed to touch
routing path which could damage CHISEL –OK SS/ENGG-13
each other and must have a minimum distance of
the hose SHOVEL –OK (BARRICADING
250 mm between them. Oxygen /LPG cylinder is to
be kept in upright position on trolley with proper tie
GAITA-OK SAFETY)
Checks for free of water
by chain as far a possible at working site. Gas hoses ,
GAMLA –OK SS/ENGG-05
accumulation and vehicle/personal
HAND PANJA – (WELDING AND
movement regulators and all associated apparatus will be Mr.Bhaskar Das
Gupta, Head RMP OK CUTTING
SLINGS -OK SAFETY)

TSL Representative Working agency Engineer


TATA STEEL M/s. PARVEEN CONSTRUCTION
Note: 1. This Safe Work Procedure shall be prepared by owner department countersigned by contractor's representative and safety department.
2. Sequence of work shall invoice step-by-step jobs.
3. All possible hazard including proximity hazard shall be amended and persons shall be identified.
4. With the change of working conditions, the procedure shall be amended and persons shall be trained
5. Review on status of implementation shall be done though task observation
6. Before start of the job, induction shall be given to persons engaged at site by departmental representative and Contractor's Representative.
EHSMSM/WORKS/9203/9217 SAFE WORK PROCEDURE – CIVIL & STRUCTURAL WORK 25 of 58 | P a g e
(Performance Criteria - Perfection in job with no injury to persons or damage to property) or damage to property REV

1. DEPARTMENT : RMP-Joda (ENGG & PROJECTS-Tata Steel Ltd.) DOC. NO: SWP/PAR/FAP/Joda/01 DATE:

2. SECTION / LOCATION : Ferro Plant, Joda NAME OF WORKING AGENCY: M/s. PARVEEN CONSTRUCTION
3. JOB TITLE : Civil works for Effluent Treatment Plant WORK ORDER No: 3800016542/109

JOB DURATION : Start Date: 01/01/2021 End Date: 30/06/2021


Persons Responsible Condition of Tools / Reference to
Sl.
Activities (Sequence of Work) Hazard Safety Precautions Name & P. No. Tackles required OK/Not document/criteria and
No.
Ok remarks
regularly Civil (TSL) SAFETY SS/GEN-54
Mo.N0- HELMET- OK (PPE AND
Executing gas cutting operations 9040092694 SAFETY CLOTHING
SHOES-OK STANDARD)
Checking the torch for easy air flow Checked prior to start of job. Mr. LN Goswami,
SAFETY
Civil Engineer
Igniting the torch with the help of All inflammable material will be removed from (Parveen Cons) JACKET- OK SS/ENGG-15
igniter Mob No- SAFETY (STORAGE OF
site on daily basis.
9777344302 GLOVES - OK CONSTRUCTIO
Before cutting the job check for SAFETY N MATERIAL)
Generated scrap ( inflammable materials)
combustibles nearby workplace Md.Abdus Salim, GOGGLES-OK
removal will be done on continuous basis and Site BARRICADING SS/ENGG-11
proper area housekeeping to be maintained at Supervioser(Parve –OK (SAFETY IN
Burn injury site. en Cons) MATERIAL
Also verify the supports provided Mo.No- SPADE –OK HANDLING
properly Sufficient number of fire extinguisher & sand 6370417428
PICK AXE –OK EQUIPMENT)
bucket will be kept at site. Fire watcher to be HAMMER –OK
Eye stress/injury
provided at hot job.Relevant ppe,s to be used CHISEL –OK SS/ENGG-13
Using appropriate ppe during performing the cutting jobs ( safety SHOVEL –OK (BARRICADING
goggles, full body apron, hand shelves, leg GAITA-OK SAFETY)
guards). GAMLA –OK SS/ENGG-05
HAND PANJA – (WELDING AND
Restricting unauthorized personal Relevant eye protection ppe,s to be used during OK CUTTING
entry Mr.Bhaskar Das
performing the cutting jobs (cutting SLINGS -OK SAFETY)

TSL Representative Working agency Engineer


TATA STEEL M/s. PARVEEN CONSTRUCTION
Note: 1. This Safe Work Procedure shall be prepared by owner department countersigned by contractor's representative and safety department.
2. Sequence of work shall invoice step-by-step jobs.
3. All possible hazard including proximity hazard shall be amended and persons shall be identified.
4. With the change of working conditions, the procedure shall be amended and persons shall be trained
5. Review on status of implementation shall be done though task observation
6. Before start of the job, induction shall be given to persons engaged at site by departmental representative and Contractor's Representative.
EHSMSM/WORKS/9203/9217 SAFE WORK PROCEDURE – CIVIL & STRUCTURAL WORK 26 of 58 | P a g e
(Performance Criteria - Perfection in job with no injury to persons or damage to property) or damage to property REV

1. DEPARTMENT : RMP-Joda (ENGG & PROJECTS-Tata Steel Ltd.) DOC. NO: SWP/PAR/FAP/Joda/01 DATE:

2. SECTION / LOCATION : Ferro Plant, Joda NAME OF WORKING AGENCY: M/s. PARVEEN CONSTRUCTION
3. JOB TITLE : Civil works for Effluent Treatment Plant WORK ORDER No: 3800016542/109

JOB DURATION : Start Date: 01/01/2021 End Date: 30/06/2021


Persons Responsible Condition of Tools / Reference to
Sl.
Activities (Sequence of Work) Hazard Safety Precautions Name & P. No. Tackles required OK/Not document/criteria and
No.
Ok remarks
10 goggles/shield). Gupta, Head RMP SAFETY SS/GEN-54
Civil (TSL) HELMET- OK (PPE AND
Failure of working platform for Take rest time to time and wash Mo.N0- SAFETY CLOTHING
9040092694 SHOES-OK STANDARD)
painting at height.
Working platform must be construct as per TSL SAFETY
standard to avoid failure of collapse. Hand rails Mr. LN Goswami,
Civil Engineer JACKET- OK SS/ENGG-15
must be provided (Top & Middle). (Parveen Cons) SAFETY (STORAGE OF
Painting of Side wall, wall Mob No- GLOVES - OK CONSTRUCTIO
edge ,roof top & door, Standard approach/stair case must be provided 9777344302 SAFETY N MATERIAL)
window, angle, sheet with fall protection aids. 12 mm wire rope to be GOGGLES-OK
used as horizontal life line & it must be clamped Md.Abdus Salim, BARRICADING SS/ENGG-11
Fall of painting material from on fixed pole/mast. Sagging must be avoided. Site –OK (SAFETY IN
Supervioser(Parve MATERIAL
height. en Cons)
Worker must gone through height test & he must SPADE –OK HANDLING
Mo.No-
have valid height pass for painting at height.He PICK AXE –OK EQUIPMENT)
6370417428
must use safety goggles, hand gloves if required HAMMER –OK
CHISEL –OK SS/ENGG-13
Toxic fumes ingestion may retractable fall arrestor with other mandatory
SHOVEL –OK (BARRICADING
cause physical disorder. PPEs as per TSL standard.
GAITA-OK SAFETY)
All materials must be tied at top or height. Safety GAMLA –OK SS/ENGG-05
HAND PANJA – (WELDING AND
net must be tied if required. Toe guard must be
OK CUTTING
provided. he must use nose mask & take rest SLINGS -OK SAFETY)

TSL Representative Working agency Engineer


TATA STEEL M/s. PARVEEN CONSTRUCTION
Note: 1. This Safe Work Procedure shall be prepared by owner department countersigned by contractor's representative and safety department.
2. Sequence of work shall invoice step-by-step jobs.
3. All possible hazard including proximity hazard shall be amended and persons shall be identified.
4. With the change of working conditions, the procedure shall be amended and persons shall be trained
5. Review on status of implementation shall be done though task observation
6. Before start of the job, induction shall be given to persons engaged at site by departmental representative and Contractor's Representative.
EHSMSM/WORKS/9203/9217 SAFE WORK PROCEDURE – CIVIL & STRUCTURAL WORK 27 of 58 | P a g e
(Performance Criteria - Perfection in job with no injury to persons or damage to property) or damage to property REV

1. DEPARTMENT : RMP-Joda (ENGG & PROJECTS-Tata Steel Ltd.) DOC. NO: SWP/PAR/FAP/Joda/01 DATE:

2. SECTION / LOCATION : Ferro Plant, Joda NAME OF WORKING AGENCY: M/s. PARVEEN CONSTRUCTION
3. JOB TITLE : Civil works for Effluent Treatment Plant WORK ORDER No: 3800016542/109

JOB DURATION : Start Date: 01/01/2021 End Date: 30/06/2021


Persons Responsible Condition of Tools / Reference to
Sl.
Activities (Sequence of Work) Hazard Safety Precautions Name & P. No. Tackles required OK/Not document/criteria and
No.
Ok remarks
during short intervals. In closed room must Mr.Bhaskar Das SAFETY SS/GEN-54
11 ventilate for few minutes before enter the room. Gupta, Head RMP HELMET- OK (PPE AND
Civil (TSL) SAFETY CLOTHING
Mo.N0- SHOES-OK STANDARD)
9040092694
Inhalation of cement & sand dust. SAFETY
All the required PPE’s like dust mask, gum boot, JACKET- OK SS/ENGG-15
*Skin contamination goggles and rubber hand gloves must be used Mr. LN Goswami,
Civil Engineer SAFETY (STORAGE OF
during mixing of cement and sand.
Physical injury by hand tools. (Parveen Cons) GLOVES - OK CONSTRUCTIO
Bricks & Plastering work on Mob No- SAFETY N MATERIAL)
Damaged tools/ tackles removed from site & use
ground. always standard tools at work site. 9777344302 GOGGLES-OK
All the hand tools (belcha, hoe) should be checked BARRICADING SS/ENGG-11
before start the job and always use standard hand Md.Abdus Salim, –OK (SAFETY IN
tools Site MATERIAL
Poor House Keeping which causes Supervioser(Parve SPADE –OK HANDLING
stumbling. Work area to be clean & proper approach en Cons)
PICK AXE –OK EQUIPMENT)
provided. Mo.No-
Day to Day house keeping to be maintained in 6370417428 HAMMER –OK
regular basis at work site. CHISEL –OK SS/ENGG-13
Collapse of bricks stacking.
SHOVEL –OK (BARRICADING
All Bricks should be shifted & stacked in a proper GAITA-OK SAFETY)
manner (height 1.5 m). GAMLA –OK SS/ENGG-05
Avoid stacked near the excavated edge and. HAND PANJA – (WELDING AND
OK CUTTING
SLINGS -OK SAFETY)

TSL Representative Working agency Engineer


TATA STEEL M/s. PARVEEN CONSTRUCTION
Note: 1. This Safe Work Procedure shall be prepared by owner department countersigned by contractor's representative and safety department.
2. Sequence of work shall invoice step-by-step jobs.
3. All possible hazard including proximity hazard shall be amended and persons shall be identified.
4. With the change of working conditions, the procedure shall be amended and persons shall be trained
5. Review on status of implementation shall be done though task observation
6. Before start of the job, induction shall be given to persons engaged at site by departmental representative and Contractor's Representative.
EHSMSM/WORKS/9203/9217 SAFE WORK PROCEDURE – CIVIL & STRUCTURAL WORK 28 of 58 | P a g e
(Performance Criteria - Perfection in job with no injury to persons or damage to property) or damage to property REV

1. DEPARTMENT : RMP-Joda (ENGG & PROJECTS-Tata Steel Ltd.) DOC. NO: SWP/PAR/FAP/Joda/01 DATE:

2. SECTION / LOCATION : Ferro Plant, Joda NAME OF WORKING AGENCY: M/s. PARVEEN CONSTRUCTION
3. JOB TITLE : Civil works for Effluent Treatment Plant WORK ORDER No: 3800016542/109

JOB DURATION : Start Date: 01/01/2021 End Date: 30/06/2021


Persons Responsible Condition of Tools / Reference to
Sl.
Activities (Sequence of Work) Hazard Safety Precautions Name & P. No. Tackles required OK/Not document/criteria and
No.
Ok remarks
SAFETY SS/GEN-54
Mr.Bhaskar Das HELMET- OK (PPE AND
12 Gupta, Head RMP SAFETY CLOTHING
Civil (TSL) SHOES-OK STANDARD)
Mo.N0- SAFETY
9040092694
JACKET- OK SS/ENGG-15
Scaffold stage should be made as per standard and SAFETY (STORAGE OF
Certified by authorized person . (Base/soil plate, Mr. LN Goswami,
Collapse of scaffolding Civil Engineer GLOVES - OK CONSTRUCTIO
bracing, toe guard ,hand rail). SAFETY N MATERIAL)
(Parveen Cons)
The load is to be given in scaffold must be
Mob No- GOGGLES-OK
Working at height assessed before use.
9777344302 BARRICADING SS/ENGG-11
Scaffold should not be erected at excavated edge,
–OK (SAFETY IN
must be erected 1mtr. Away from the edge.
Md.Abdus Salim, MATERIAL
Unsafe Access. Before erection ground condition should be Site
checked SPADE –OK HANDLING
Supervioser(Parve PICK AXE –OK EQUIPMENT)
Ramp (30 degree) should be proper with hand rail en Cons)
and if ladder use kept in 65 to 75 degree, fixed on HAMMER –OK
Mo.No-
rigid structure and must be 1m. from the landing
6370417428 CHISEL –OK SS/ENGG-13
SHOVEL –OK (BARRICADING
Falling from height During working at height (2m. and above) full body GAITA-OK SAFETY)
harness with double lanyard should be used. GAMLA –OK SS/ENGG-05
Life line (if required) should be used (dia 25mm.
HAND PANJA – (WELDING AND
PP rope or 12mm wire rope sling).
OK CUTTING
Physical injury from material and SLINGS -OK SAFETY)

TSL Representative Working agency Engineer


TATA STEEL M/s. PARVEEN CONSTRUCTION
Note: 1. This Safe Work Procedure shall be prepared by owner department countersigned by contractor's representative and safety department.
2. Sequence of work shall invoice step-by-step jobs.
3. All possible hazard including proximity hazard shall be amended and persons shall be identified.
4. With the change of working conditions, the procedure shall be amended and persons shall be trained
5. Review on status of implementation shall be done though task observation
6. Before start of the job, induction shall be given to persons engaged at site by departmental representative and Contractor's Representative.
EHSMSM/WORKS/9203/9217 SAFE WORK PROCEDURE – CIVIL & STRUCTURAL WORK 29 of 58 | P a g e
(Performance Criteria - Perfection in job with no injury to persons or damage to property) or damage to property REV

1. DEPARTMENT : RMP-Joda (ENGG & PROJECTS-Tata Steel Ltd.) DOC. NO: SWP/PAR/FAP/Joda/01 DATE:

2. SECTION / LOCATION : Ferro Plant, Joda NAME OF WORKING AGENCY: M/s. PARVEEN CONSTRUCTION
3. JOB TITLE : Civil works for Effluent Treatment Plant WORK ORDER No: 3800016542/109

JOB DURATION : Start Date: 01/01/2021 End Date: 30/06/2021


Persons Responsible Condition of Tools / Reference to
Sl.
Activities (Sequence of Work) Hazard Safety Precautions Name & P. No. Tackles required OK/Not document/criteria and
No.
Ok remarks
hand tools. All the required PPE’s (helmet, hand gloves, safety SAFETY SS/GEN-54
shoe and goggles) shall be used. HELMET- OK (PPE AND
13 Use standard type hand tools SAFETY CLOTHING
Mr.Bhaskar Das SHOES-OK STANDARD)
Gupta, Head RMP SAFETY
Civil (TSL) JACKET- OK SS/ENGG-15
Physical injury due to unsafe Mo.N0- SAFETY (STORAGE OF
practice House keeping should be maintained in 9040092694
GLOVES - OK CONSTRUCTIO
regular basis at work site.
Mr. LN Goswami, SAFETY N MATERIAL)
Access should be clean and free from
Civil Engineer GOGGLES-OK
obstruction.
Shuttering work. (Parveen Cons) BARRICADING SS/ENGG-11
All the scattered nails should be collected in
boxes for disposal and removed all the Mob No- –OK (SAFETY IN
& projected nails from the wooden planks. 9777344302 MATERIAL
One nails removing area to be located. SPADE –OK HANDLING
Dishuttering work Md.Abdus Salim, PICK AXE –OK EQUIPMENT)
All Shuttering / De-shuttering materials
Site HAMMER –OK
should be shifted & Stacked up to 3 feet Supervioser(Parve
height. CHISEL –OK SS/ENGG-13
en Cons)
Shuttering and de-shuttering materials SHOVEL –OK (BARRICADING
Mo.No-
should not be kept at the edge of excavated 6370417428 GAITA-OK SAFETY)
pit. GAMLA –OK SS/ENGG-05
Sufficient man power to be engaged on the HAND PANJA – (WELDING AND
Use of damage tools & tackles job OK CUTTING
All the required PPE’s should be used (gloves, SLINGS -OK SAFETY)

TSL Representative Working agency Engineer


TATA STEEL M/s. PARVEEN CONSTRUCTION
Note: 1. This Safe Work Procedure shall be prepared by owner department countersigned by contractor's representative and safety department.
2. Sequence of work shall invoice step-by-step jobs.
3. All possible hazard including proximity hazard shall be amended and persons shall be identified.
4. With the change of working conditions, the procedure shall be amended and persons shall be trained
5. Review on status of implementation shall be done though task observation
6. Before start of the job, induction shall be given to persons engaged at site by departmental representative and Contractor's Representative.
EHSMSM/WORKS/9203/9217 SAFE WORK PROCEDURE – CIVIL & STRUCTURAL WORK 30 of 58 | P a g e
(Performance Criteria - Perfection in job with no injury to persons or damage to property) or damage to property REV

1. DEPARTMENT : RMP-Joda (ENGG & PROJECTS-Tata Steel Ltd.) DOC. NO: SWP/PAR/FAP/Joda/01 DATE:

2. SECTION / LOCATION : Ferro Plant, Joda NAME OF WORKING AGENCY: M/s. PARVEEN CONSTRUCTION
3. JOB TITLE : Civil works for Effluent Treatment Plant WORK ORDER No: 3800016542/109

JOB DURATION : Start Date: 01/01/2021 End Date: 30/06/2021


Persons Responsible Condition of Tools / Reference to
Sl.
Activities (Sequence of Work) Hazard Safety Precautions Name & P. No. Tackles required OK/Not document/criteria and
No.
Ok remarks
safety shoe, helmet etc.) SAFETY SS/GEN-54
14 HELMET- OK (PPE AND
SAFETY CLOTHING
Damaged tools/ tackles should not be used at Mr.Bhaskar Das SHOES-OK STANDARD)
site. Always use standard tools at site. Gupta, Head RMP SAFETY
Civil (TSL) JACKET- OK SS/ENGG-15
Mo.N0- SAFETY (STORAGE OF
Snack & Insect bite 9040092694
Checked prior to start of job.Work permit GLOVES - OK CONSTRUCTIO
should be taken from concern person Mr. LN Goswami, SAFETY N MATERIAL)
before start job. Civil Engineer GOGGLES-OK
BUSH CUTTING WORK (Parveen Cons) BARRICADING SS/ENGG-11
Mob No- –OK (SAFETY IN
Engaged trained person on the job. MATERIAL
9777344302
SPADE –OK HANDLING
Strict supervission must be required during Md.Abdus Salim, PICK AXE –OK EQUIPMENT)
the job. Site HAMMER –OK
Use gum boot during bush cutting.Use Supervioser(Parve CHISEL –OK SS/ENGG-13
en Cons)
safe access. SHOVEL –OK (BARRICADING
Mo.No-
6370417428 GAITA-OK SAFETY)
Carbolic acid should be spray at bush GAMLA –OK SS/ENGG-05
HAND PANJA – (WELDING AND
cutting area before stert the job. OK CUTTING
SLINGS -OK SAFETY)

TSL Representative Working agency Engineer


TATA STEEL M/s. PARVEEN CONSTRUCTION
Note: 1. This Safe Work Procedure shall be prepared by owner department countersigned by contractor's representative and safety department.
2. Sequence of work shall invoice step-by-step jobs.
3. All possible hazard including proximity hazard shall be amended and persons shall be identified.
4. With the change of working conditions, the procedure shall be amended and persons shall be trained
5. Review on status of implementation shall be done though task observation
6. Before start of the job, induction shall be given to persons engaged at site by departmental representative and Contractor's Representative.
EHSMSM/WORKS/9203/9217 SAFE WORK PROCEDURE – CIVIL & STRUCTURAL WORK 31 of 58 | P a g e
(Performance Criteria - Perfection in job with no injury to persons or damage to property) or damage to property REV

1. DEPARTMENT : RMP-Joda (ENGG & PROJECTS-Tata Steel Ltd.) DOC. NO: SWP/PAR/FAP/Joda/01 DATE:

2. SECTION / LOCATION : Ferro Plant, Joda NAME OF WORKING AGENCY: M/s. PARVEEN CONSTRUCTION
3. JOB TITLE : Civil works for Effluent Treatment Plant WORK ORDER No: 3800016542/109

JOB DURATION : Start Date: 01/01/2021 End Date: 30/06/2021


Persons Responsible Condition of Tools / Reference to
Sl.
Activities (Sequence of Work) Hazard Safety Precautions Name & P. No. Tackles required OK/Not document/criteria and
No.
Ok remarks

All required ppe should be used (gum SAFETY SS/GEN-54


boot,safety helmet,googles,hand gloves, full HELMET- OK (PPE AND
sleve shirt.etc) SAFETY CLOTHING
15. Don’’t take rest at bush cutting area. SHOES-OK STANDARD)
Physical injury by Hit, fall of Mr.Bhaskar Das SAFETY
Gupta, Head RMP JACKET- OK SS/ENGG-15
reinforcement rod during Civil (TSL)
handling SAFETY (STORAGE OF
Mo.N0- GLOVES - OK CONSTRUCTIO
All the workers should be used Safety Helmet, 9040092694
goggles, leather palm hand-gloves, safety shoes SAFETY N MATERIAL)
poor stacking.
as per standard. Loose clothing should not be Mr. LN Goswami, GOGGLES-OK
Stumbling due poor BARRICADING SS/ENGG-11
permitted. Civil Engineer
Housekeeping Only skilled gang shall be deployed for the job. –OK (SAFETY IN
(Parveen Cons)
Reinforcement work at All the hand tools shall be checked before start MATERIAL
Mob No-
yard. (Cutting and bending the job and remove all the damage hand tools. 9777344302 SPADE –OK HANDLING
and binding ) mechanical PICK AXE –OK EQUIPMENT)
& manual. Proper housekeeping will be ensured in regular Md.Abdus Salim, HAMMER –OK
basis, scarps should be removed in daily basis. Site CHISEL –OK SS/ENGG-13
All reinforcement rod should be stacked with Supervioser(Parve SHOVEL –OK (BARRICADING
proper way and rings should be stacked up to 3 en Cons)
GAITA-OK SAFETY)
Mo.No-
Electrocution feet height. Proper safety precaution mentioned GAMLA –OK SS/ENGG-05
6370417428
above in the material handling will be ensured HAND PANJA – (WELDING AND
during shifting of reinforcement. OK CUTTING
Approach should be cleared from all obstructions SLINGS -OK SAFETY)

TSL Representative Working agency Engineer


TATA STEEL M/s. PARVEEN CONSTRUCTION
Note: 1. This Safe Work Procedure shall be prepared by owner department countersigned by contractor's representative and safety department.
2. Sequence of work shall invoice step-by-step jobs.
3. All possible hazard including proximity hazard shall be amended and persons shall be identified.
4. With the change of working conditions, the procedure shall be amended and persons shall be trained
5. Review on status of implementation shall be done though task observation
6. Before start of the job, induction shall be given to persons engaged at site by departmental representative and Contractor's Representative.
EHSMSM/WORKS/9203/9217 SAFE WORK PROCEDURE – CIVIL & STRUCTURAL WORK 32 of 58 | P a g e
(Performance Criteria - Perfection in job with no injury to persons or damage to property) or damage to property REV

1. DEPARTMENT : RMP-Joda (ENGG & PROJECTS-Tata Steel Ltd.) DOC. NO: SWP/PAR/FAP/Joda/01 DATE:

2. SECTION / LOCATION : Ferro Plant, Joda NAME OF WORKING AGENCY: M/s. PARVEEN CONSTRUCTION
3. JOB TITLE : Civil works for Effluent Treatment Plant WORK ORDER No: 3800016542/109

JOB DURATION : Start Date: 01/01/2021 End Date: 30/06/2021


Persons Responsible Condition of Tools / Reference to
Sl.
Activities (Sequence of Work) Hazard Safety Precautions Name & P. No. Tackles required OK/Not document/criteria and
No.
Ok remarks
Safe walkway/approach will be made through SAFETY SS/GEN-54
G.I. Sheet / shuttering board/plate for safe HELMET- OK (PPE AND
movement of workmen. SAFETY CLOTHING
SHOES-OK STANDARD)
All the power connection should be taken SAFETY
Hit by flying objects and through ELCB (30 mA) and double body earthling Mr.Bhaskar Das JACKET- OK SS/ENGG-15
should be ensured and cable should be taken Gupta, Head RMP SAFETY (STORAGE OF
hammer during cutting of Civil (TSL)
either under ground or over head. GLOVES - OK CONSTRUCTIO
reinforcement bars Mo.N0-
Rubber mat should be kept in front of the SAFETY N MATERIAL)
9040092694
machine. GOGGLES-OK
Mr. LN Goswami, BARRICADING SS/ENGG-11
Mushroom head chisel should not to be allowed Civil Engineer –OK (SAFETY IN
for reinforcement cutting (Parveen Cons) MATERIAL
Hammer as per the standard will be ensured Mob No- SPADE –OK HANDLING
(steel handle not allowed). 9777344302 PICK AXE –OK EQUIPMENT)
Safety goggles and other required PPE’s should HAMMER –OK
be used while manual reinforcement cutting. Md.Abdus Salim, CHISEL –OK SS/ENGG-13
Site SHOVEL –OK (BARRICADING
Supervioser(Parve GAITA-OK SAFETY)
en Cons)
GAMLA –OK SS/ENGG-05
Mo.No-
6370417428 HAND PANJA – (WELDING AND
OK CUTTING
SLINGS -OK SAFETY)

TSL Representative Working agency Engineer


TATA STEEL M/s. PARVEEN CONSTRUCTION
Note: 1. This Safe Work Procedure shall be prepared by owner department countersigned by contractor's representative and safety department.
2. Sequence of work shall invoice step-by-step jobs.
3. All possible hazard including proximity hazard shall be amended and persons shall be identified.
4. With the change of working conditions, the procedure shall be amended and persons shall be trained
5. Review on status of implementation shall be done though task observation
6. Before start of the job, induction shall be given to persons engaged at site by departmental representative and Contractor's Representative.
EHSMSM/WORKS/9203/9217 SAFE WORK PROCEDURE – CIVIL & STRUCTURAL WORK 33 of 58 | P a g e
(Performance Criteria - Perfection in job with no injury to persons or damage to property) or damage to property REV

1. DEPARTMENT : RMP-Joda (ENGG & PROJECTS-Tata Steel Ltd.) DOC. NO: SWP/PAR/FAP/Joda/01 DATE:

2. SECTION / LOCATION : Ferro Plant, Joda NAME OF WORKING AGENCY: M/s. PARVEEN CONSTRUCTION
3. JOB TITLE : Civil works for Effluent Treatment Plant WORK ORDER No: 3800016542/109

JOB DURATION : Start Date: 01/01/2021 End Date: 30/06/2021


Persons Responsible Condition of Tools / Reference to
Sl.
Activities (Sequence of Work) Hazard Safety Precautions Name & P. No. Tackles required OK/Not document/criteria and
No.
Ok remarks
SAFETY SS/GEN-54
HELMET- OK (PPE AND
SAFETY CLOTHING
SHOES-OK STANDARD)
16 SAFETY
JACKET- OK SS/ENGG-15
Mr.Bhaskar Das SAFETY (STORAGE OF
Gupta, Head RMP GLOVES - OK CONSTRUCTIO
Civil (TSL) SAFETY N MATERIAL)
Electrocution Mo.N0- GOGGLES-OK
9040092694
All the connections should be taken through ELCB &
BARRICADING SS/ENGG-11
cable should be good condition. Mr. LN Goswami, –OK (SAFETY IN
Wood cutting by manually, MATERIAL
Machine should be insulated & connection should be Civil Engineer
electric saw machine. taken by industrial top. (Parveen Cons) SPADE –OK HANDLING
Incompetent operator All the flexible cable should be taken through either Mob No- PICK AXE –OK EQUIPMENT)
under ground or over head. 9777344302 HAMMER –OK
Machine should be insulated & connection shall be CHISEL –OK SS/ENGG-13
*Physical hazard. Md.Abdus Salim,
taken by industrial top. SHOVEL –OK (BARRICADING
Only expert and competent operator shall be Site GAITA-OK SAFETY)
operating the machine. Supervioser(Parve GAMLA –OK SS/ENGG-05
en Cons)
(Noise ,Dust) HAND PANJA – (WELDING AND
Ear plug shall be used by operator to eliminate the Mo.No-
6370417428 OK CUTTING
noise.
SLINGS -OK SAFETY)

TSL Representative Working agency Engineer


TATA STEEL M/s. PARVEEN CONSTRUCTION
Note: 1. This Safe Work Procedure shall be prepared by owner department countersigned by contractor's representative and safety department.
2. Sequence of work shall invoice step-by-step jobs.
3. All possible hazard including proximity hazard shall be amended and persons shall be identified.
4. With the change of working conditions, the procedure shall be amended and persons shall be trained
5. Review on status of implementation shall be done though task observation
6. Before start of the job, induction shall be given to persons engaged at site by departmental representative and Contractor's Representative.
EHSMSM/WORKS/9203/9217 SAFE WORK PROCEDURE – CIVIL & STRUCTURAL WORK 34 of 58 | P a g e
(Performance Criteria - Perfection in job with no injury to persons or damage to property) or damage to property REV

1. DEPARTMENT : RMP-Joda (ENGG & PROJECTS-Tata Steel Ltd.) DOC. NO: SWP/PAR/FAP/Joda/01 DATE:

2. SECTION / LOCATION : Ferro Plant, Joda NAME OF WORKING AGENCY: M/s. PARVEEN CONSTRUCTION
3. JOB TITLE : Civil works for Effluent Treatment Plant WORK ORDER No: 3800016542/109

JOB DURATION : Start Date: 01/01/2021 End Date: 30/06/2021


Persons Responsible Condition of Tools / Reference to
Sl.
Activities (Sequence of Work) Hazard Safety Precautions Name & P. No. Tackles required OK/Not document/criteria and
No.
Ok remarks
Safety goggles, dust musk and other required PPE’s SAFETY SS/GEN-54
17 (hamlet, shoe) shall be used by the operator and HELMET- OK (PPE AND
Use of damage wheel and helper SAFETY CLOTHING
unguarded machine. Damaged tools/ tackles removed from site & use SHOES-OK STANDARD)
always standard tools at work site.
SAFETY
Before starting the machine guard and wheel shall be
checked (crack, damage & tightness). JACKET- OK SS/ENGG-15
Loose cloth not to be allowed during operating the SAFETY (STORAGE OF
machine. Mr.Bhaskar Das GLOVES - OK CONSTRUCTIO
Gupta, Head RMP SAFETY N MATERIAL)
Fall of Persons and material Civil (TSL) GOGGLES-OK
from height Mo.N0-
Full body harness with double lanyard must BARRICADING SS/ENGG-11
9040092694
be used during working at height & –OK (SAFETY IN
Scaffolding Erection work approach should be proper. MATERIAL
Mr. LN Goswami,
Loose & unwanted material should not be Civil Engineer SPADE –OK HANDLING
kept on the scaffold or any other place. (Parveen Cons) PICK AXE –OK EQUIPMENT)
Collapse of scaffold Mob No- HAMMER –OK
Nobody should not be allowed to stand
under/near by area where height work shall
9777344302 CHISEL –OK SS/ENGG-13
SHOVEL –OK (BARRICADING
be done and area should be barricaded Md.Abdus Salim, GAITA-OK SAFETY)
Site GAMLA –OK SS/ENGG-05
Scaffolding will be made as per standard Supervioser(Parve
HAND PANJA – (WELDING AND
(base plate, soil plate, guard rail, toe guard, en Cons)
Hit by hand tools due to OK CUTTING
bracing) & certified by authorized persons Mo.No-
SLINGS -OK SAFETY)

TSL Representative Working agency Engineer


TATA STEEL M/s. PARVEEN CONSTRUCTION
Note: 1. This Safe Work Procedure shall be prepared by owner department countersigned by contractor's representative and safety department.
2. Sequence of work shall invoice step-by-step jobs.
3. All possible hazard including proximity hazard shall be amended and persons shall be identified.
4. With the change of working conditions, the procedure shall be amended and persons shall be trained
5. Review on status of implementation shall be done though task observation
6. Before start of the job, induction shall be given to persons engaged at site by departmental representative and Contractor's Representative.
EHSMSM/WORKS/9203/9217 SAFE WORK PROCEDURE – CIVIL & STRUCTURAL WORK 35 of 58 | P a g e
(Performance Criteria - Perfection in job with no injury to persons or damage to property) or damage to property REV

1. DEPARTMENT : RMP-Joda (ENGG & PROJECTS-Tata Steel Ltd.) DOC. NO: SWP/PAR/FAP/Joda/01 DATE:

2. SECTION / LOCATION : Ferro Plant, Joda NAME OF WORKING AGENCY: M/s. PARVEEN CONSTRUCTION
3. JOB TITLE : Civil works for Effluent Treatment Plant WORK ORDER No: 3800016542/109

JOB DURATION : Start Date: 01/01/2021 End Date: 30/06/2021


Persons Responsible Condition of Tools / Reference to
Sl.
Activities (Sequence of Work) Hazard Safety Precautions Name & P. No. Tackles required OK/Not document/criteria and
No.
Ok remarks

mishandling of material before use. 6370417428 SAFETY SS/GEN-54


The distance between two vertical members HELMET- OK (PPE AND
of MS pipe should not be exceeding 1.5m. SAFETY CLOTHING
The safety factor of scaffold should be 3. i.e SHOES-OK STANDARD)
the capacity of taking load is three times SAFETY
more than the load is to be given. JACKET- OK SS/ENGG-15
All Scaffolding materials & others tools/ SAFETY (STORAGE OF
GLOVES - OK CONSTRUCTIO
tackles to be checked. Mr.Bhaskar Das SAFETY N MATERIAL)
Scaffold should be erected on hard and level Gupta, Head RMP GOGGLES-OK
ground. Civil (TSL)
BARRICADING SS/ENGG-11
Always use proper tag i.e Under Erection. Mo.N0-
9040092694 –OK (SAFETY IN
To avoid use of damage scaffolding materials MATERIAL
Mr. LN Goswami, SPADE –OK HANDLING
Civil Engineer PICK AXE –OK EQUIPMENT)
(Parveen Cons) HAMMER –OK
The well trained person should be engaged
Mob No- CHISEL –OK SS/ENGG-13
in job 9777344302 SHOVEL –OK (BARRICADING
All the hand tools should be kept in tool box GAITA-OK SAFETY)
in proper way. Md.Abdus Salim, GAMLA –OK SS/ENGG-05
During height work all the hand tools shall Site
HAND PANJA – (WELDING AND
be tied with rope. Supervioser(Parve
en Cons) OK CUTTING
SLINGS -OK SAFETY)

TSL Representative Working agency Engineer


TATA STEEL M/s. PARVEEN CONSTRUCTION
Note: 1. This Safe Work Procedure shall be prepared by owner department countersigned by contractor's representative and safety department.
2. Sequence of work shall invoice step-by-step jobs.
3. All possible hazard including proximity hazard shall be amended and persons shall be identified.
4. With the change of working conditions, the procedure shall be amended and persons shall be trained
5. Review on status of implementation shall be done though task observation
6. Before start of the job, induction shall be given to persons engaged at site by departmental representative and Contractor's Representative.
EHSMSM/WORKS/9203/9217 SAFE WORK PROCEDURE – CIVIL & STRUCTURAL WORK 36 of 58 | P a g e
(Performance Criteria - Perfection in job with no injury to persons or damage to property) or damage to property REV

1. DEPARTMENT : RMP-Joda (ENGG & PROJECTS-Tata Steel Ltd.) DOC. NO: SWP/PAR/FAP/Joda/01 DATE:

2. SECTION / LOCATION : Ferro Plant, Joda NAME OF WORKING AGENCY: M/s. PARVEEN CONSTRUCTION
3. JOB TITLE : Civil works for Effluent Treatment Plant WORK ORDER No: 3800016542/109

JOB DURATION : Start Date: 01/01/2021 End Date: 30/06/2021


Persons Responsible Condition of Tools / Reference to
Sl.
Activities (Sequence of Work) Hazard Safety Precautions Name & P. No. Tackles required OK/Not document/criteria and
No.
Ok remarks
Mo.No- SAFETY SS/GEN-54
6370417428 HELMET- OK (PPE AND
SAFETY CLOTHING
18 SHOES-OK STANDARD)
SAFETY
JACKET- OK SS/ENGG-15
SAFETY (STORAGE OF
GLOVES - OK CONSTRUCTIO
SAFETY N MATERIAL)
Mr.Bhaskar Das GOGGLES-OK
Gupta, Head RMP
BARRICADING SS/ENGG-11
Civil (TSL)
Mo.N0- –OK (SAFETY IN
Fall of Persons and material
9040092694 MATERIAL
from height Full body harness with double lanyard must SPADE –OK HANDLING
be used during working at height & Mr. LN Goswami, PICK AXE –OK EQUIPMENT)
Scaffolding Dismantling work approach should be proper. HAMMER –OK
Civil Engineer
Loose & unwanted material should not be (Parveen Cons) CHISEL –OK SS/ENGG-13
kept on the scaffold or any other place. Mob No- SHOVEL –OK (BARRICADING
Sudden Collapse of scaffold Nobody should not be allowed to stand 9777344302 GAITA-OK SAFETY)
under/near by area where height work shall GAMLA –OK SS/ENGG-05
Md.Abdus Salim,
be done and area should be barricaded HAND PANJA – (WELDING AND
Site
The well trained person should be engaged Supervioser(Parve OK CUTTING
in job. SLINGS -OK SAFETY)

TSL Representative Working agency Engineer


TATA STEEL M/s. PARVEEN CONSTRUCTION
Note: 1. This Safe Work Procedure shall be prepared by owner department countersigned by contractor's representative and safety department.
2. Sequence of work shall invoice step-by-step jobs.
3. All possible hazard including proximity hazard shall be amended and persons shall be identified.
4. With the change of working conditions, the procedure shall be amended and persons shall be trained
5. Review on status of implementation shall be done though task observation
6. Before start of the job, induction shall be given to persons engaged at site by departmental representative and Contractor's Representative.
EHSMSM/WORKS/9203/9217 SAFE WORK PROCEDURE – CIVIL & STRUCTURAL WORK 37 of 58 | P a g e
(Performance Criteria - Perfection in job with no injury to persons or damage to property) or damage to property REV

1. DEPARTMENT : RMP-Joda (ENGG & PROJECTS-Tata Steel Ltd.) DOC. NO: SWP/PAR/FAP/Joda/01 DATE:

2. SECTION / LOCATION : Ferro Plant, Joda NAME OF WORKING AGENCY: M/s. PARVEEN CONSTRUCTION
3. JOB TITLE : Civil works for Effluent Treatment Plant WORK ORDER No: 3800016542/109

JOB DURATION : Start Date: 01/01/2021 End Date: 30/06/2021


Persons Responsible Condition of Tools / Reference to
Sl.
Activities (Sequence of Work) Hazard Safety Precautions Name & P. No. Tackles required OK/Not document/criteria and
No.
Ok remarks

Mishandling of material The scaffold must be dismantled from top to en Cons) SAFETY SS/GEN-54
bottom. Mo.No- HELMET- OK (PPE AND
6370417428 SAFETY CLOTHING
Only standard type hand tools shall be used
during the job. SHOES-OK STANDARD)
Area should be barricaded before start the SAFETY
19 job JACKET- OK SS/ENGG-15
The well trained person should be engaged SAFETY (STORAGE OF
GLOVES - OK CONSTRUCTIO
in job.
SAFETY N MATERIAL)
The sufficient number of manpower
GOGGLES-OK
Any materials like swivel clamp, pipe and Mr.Bhaskar Das
BARRICADING SS/ENGG-11
grating should not be thrown from the Gupta, Head RMP
Gravitational force(fall from –OK (SAFETY IN
height should be lowering in proper way. Civil (TSL)
Height,fall of Mo.N0- MATERIAL
materials)Eletrocution 9040092694 SPADE –OK HANDLING
Damage sling core(Hand PICK AXE –OK EQUIPMENT)
injuryies)Collapse of Mr. LN Goswami, HAMMER –OK
Dismantling shall start from top to
Structure(Scaffolding) Civil Engineer CHISEL –OK SS/ENGG-13
bottom only. (Parveen Cons) SHOVEL –OK (BARRICADING
Dismantling Use appropiate PPEs. Mob No- GAITA-OK SAFETY)
Cordoned the entire area. 9777344302 GAMLA –OK SS/ENGG-05
The electric cable shall be disconnected HAND PANJA – (WELDING AND
Md.Abdus Salim,
by the eletrician before start the Site OK CUTTING
SLINGS -OK SAFETY)

TSL Representative Working agency Engineer


TATA STEEL M/s. PARVEEN CONSTRUCTION
Note: 1. This Safe Work Procedure shall be prepared by owner department countersigned by contractor's representative and safety department.
2. Sequence of work shall invoice step-by-step jobs.
3. All possible hazard including proximity hazard shall be amended and persons shall be identified.
4. With the change of working conditions, the procedure shall be amended and persons shall be trained
5. Review on status of implementation shall be done though task observation
6. Before start of the job, induction shall be given to persons engaged at site by departmental representative and Contractor's Representative.
EHSMSM/WORKS/9203/9217 SAFE WORK PROCEDURE – CIVIL & STRUCTURAL WORK 38 of 58 | P a g e
(Performance Criteria - Perfection in job with no injury to persons or damage to property) or damage to property REV

1. DEPARTMENT : RMP-Joda (ENGG & PROJECTS-Tata Steel Ltd.) DOC. NO: SWP/PAR/FAP/Joda/01 DATE:

2. SECTION / LOCATION : Ferro Plant, Joda NAME OF WORKING AGENCY: M/s. PARVEEN CONSTRUCTION
3. JOB TITLE : Civil works for Effluent Treatment Plant WORK ORDER No: 3800016542/109

JOB DURATION : Start Date: 01/01/2021 End Date: 30/06/2021


Persons Responsible Condition of Tools / Reference to
Sl.
Activities (Sequence of Work) Hazard Safety Precautions Name & P. No. Tackles required OK/Not document/criteria and
No.
Ok remarks

dismantling job. Supervioser(Parve SAFETY SS/GEN-54


en Cons) HELMET- OK (PPE AND
Stacking of Dismantling materials shall
Mo.No- SAFETY CLOTHING
be in proper way. 6370417428 SHOES-OK STANDARD)
Manual handlind procedures shall be SAFETY
followed. JACKET- OK SS/ENGG-15
20 The area of Dismantling and erection SAFETY (STORAGE OF
shall be cordoned off. GLOVES - OK CONSTRUCTIO
SAFETY N MATERIAL)
GOGGLES-OK
BARRICADING SS/ENGG-11
Mr.Bhaskar Das
Fire and Electrocution due Gupta, Head RMP –OK (SAFETY IN
to damage of underground Civil (TSL) MATERIAL
Cable detector to be used before starting the Mo.N0- SPADE –OK HANDLING
Electric Cable excavation Inspection to be done if ok then PICK AXE –OK EQUIPMENT)
9040092694
allows to excavate by JCB. HAMMER –OK
Distance (min.8m.) should be maintain from Mr. LN Goswami, CHISEL –OK SS/ENGG-13
over head high tension line. Civil Engineer SHOVEL –OK (BARRICADING
Mechanized Clearance to be taken from authorized
(Parveen Cons) GAITA-OK SAFETY)
Mob No- GAMLA –OK SS/ENGG-05
Excavation by JCB & person of TSL/TCE before excavation in 9777344302
Fall of person into pit prescribed format & excavation checklist HAND PANJA – (WELDING AND
LOADER OK CUTTING
should be filled up. Md.Abdus Salim,
SLINGS -OK SAFETY)

TSL Representative Working agency Engineer


TATA STEEL M/s. PARVEEN CONSTRUCTION
Note: 1. This Safe Work Procedure shall be prepared by owner department countersigned by contractor's representative and safety department.
2. Sequence of work shall invoice step-by-step jobs.
3. All possible hazard including proximity hazard shall be amended and persons shall be identified.
4. With the change of working conditions, the procedure shall be amended and persons shall be trained
5. Review on status of implementation shall be done though task observation
6. Before start of the job, induction shall be given to persons engaged at site by departmental representative and Contractor's Representative.
EHSMSM/WORKS/9203/9217 SAFE WORK PROCEDURE – CIVIL & STRUCTURAL WORK 39 of 58 | P a g e
(Performance Criteria - Perfection in job with no injury to persons or damage to property) or damage to property REV

1. DEPARTMENT : RMP-Joda (ENGG & PROJECTS-Tata Steel Ltd.) DOC. NO: SWP/PAR/FAP/Joda/01 DATE:

2. SECTION / LOCATION : Ferro Plant, Joda NAME OF WORKING AGENCY: M/s. PARVEEN CONSTRUCTION
3. JOB TITLE : Civil works for Effluent Treatment Plant WORK ORDER No: 3800016542/109

JOB DURATION : Start Date: 01/01/2021 End Date: 30/06/2021


Persons Responsible Condition of Tools / Reference to
Sl.
Activities (Sequence of Work) Hazard Safety Precautions Name & P. No. Tackles required OK/Not document/criteria and
No.
Ok remarks

Caution board should be kept near the Site SAFETY SS/GEN-54


excavated area. Supervioser(Parve HELMET- OK (PPE AND
en Cons) SAFETY CLOTHING
Excavated area should be barricaded with
Mo.No- SHOES-OK STANDARD)
strong and rigid material. 6370417428
Earthen Ramp to be made with maximum SAFETY
Steep earthen, JACKET- OK SS/ENGG-15
collapse /slide of soil slope of 30 degrees
All the excavated earth to be kept at 1.5 m SAFETY (STORAGE OF
GLOVES - OK CONSTRUCTIO
away from the edge ofexcavated pit.
SAFETY N MATERIAL)
Sfety net, shoring, sand bags to be provided
GOGGLES-OK
on the sides of excavation fce or slope may BARRICADING SS/ENGG-11
be provided as per solid type. –OK (SAFETY IN
Movement of heavy vehicle beside or near Mr.Bhaskar Das
Gupta, Head RMP MATERIAL
by excavated pit is restricted. Civil (TSL) SPADE –OK HANDLING
Experienced supervisor will be engaged on Mo.N0- PICK AXE –OK EQUIPMENT)
the job & Small heaps not exceeding 1.2 mt 9040092694 HAMMER –OK
heights to be stacked. CHISEL –OK SS/ENGG-13
Proper checking of excavated pit should be Mr. LN Goswami, SHOVEL –OK (BARRICADING
done prior to starting of job through Civil Engineer GAITA-OK SAFETY)
(Parveen Cons) GAMLA –OK SS/ENGG-05
checklist by line engineer. Mob No-
Slope cutting must be done during the time HAND PANJA – (WELDING AND
9777344302
of excavation. OK CUTTING
SLINGS -OK SAFETY)

TSL Representative Working agency Engineer


TATA STEEL M/s. PARVEEN CONSTRUCTION
Note: 1. This Safe Work Procedure shall be prepared by owner department countersigned by contractor's representative and safety department.
2. Sequence of work shall invoice step-by-step jobs.
3. All possible hazard including proximity hazard shall be amended and persons shall be identified.
4. With the change of working conditions, the procedure shall be amended and persons shall be trained
5. Review on status of implementation shall be done though task observation
6. Before start of the job, induction shall be given to persons engaged at site by departmental representative and Contractor's Representative.
EHSMSM/WORKS/9203/9217 SAFE WORK PROCEDURE – CIVIL & STRUCTURAL WORK 40 of 58 | P a g e
(Performance Criteria - Perfection in job with no injury to persons or damage to property) or damage to property REV

1. DEPARTMENT : RMP-Joda (ENGG & PROJECTS-Tata Steel Ltd.) DOC. NO: SWP/PAR/FAP/Joda/01 DATE:

2. SECTION / LOCATION : Ferro Plant, Joda NAME OF WORKING AGENCY: M/s. PARVEEN CONSTRUCTION
3. JOB TITLE : Civil works for Effluent Treatment Plant WORK ORDER No: 3800016542/109

JOB DURATION : Start Date: 01/01/2021 End Date: 30/06/2021


Persons Responsible Condition of Tools / Reference to
Sl.
Activities (Sequence of Work) Hazard Safety Precautions Name & P. No. Tackles required OK/Not document/criteria and
No.
Ok remarks

No boulders or any unwanted materials Md.Abdus Salim, SAFETY SS/GEN-54


should be kepton the edge of excavated pit. Site HELMET- OK (PPE AND
Supervioser(Parve SAFETY CLOTHING
Poor visibility Illumination more than 65 lux will be
en Cons)
provided during the night time. SHOES-OK STANDARD)
Mo.No-
Hit by bucket may cause injury SAFETY
6370417428
One person with flag should be deployed JACKET- OK SS/ENGG-15
to the workmen..
SAFETY (STORAGE OF
during marching/movement..
GLOVES - OK CONSTRUCTIO
Spillage of soil and boulders Only experience operator with HMV license
SAFETY N MATERIAL)
due to over loading. holder operator operate the equipment. GOGGLES-OK
Over loading of excavated earth should be
BARRICADING SS/ENGG-11
Wrong placement of dumper, like restricted.
–OK (SAFETY IN
loading on ramp or uneven The excavated soil must be loaded up to the level
MATERIAL
of Dala.
ground which causes toppling of SPADE –OK HANDLING
Do not travel on slopes of over 30 degree as Mr.Bhaskar Das
there is danger that the machine may overturn.. Gupta, Head RMP PICK AXE –OK EQUIPMENT)
Follow three mirrors during reversing. Civil (TSL) HAMMER –OK
The vehicles should be 3m away from the edge of Mo.N0- CHISEL –OK SS/ENGG-13
Using of mobile during 9040092694 SHOVEL –OK (BARRICADING
operation. excavated pit.
GAITA-OK SAFETY)
Mr. LN Goswami, GAMLA –OK SS/ENGG-05
The use of mobile phone is strictly Civil Engineer HAND PANJA – (WELDING AND
prohibited during operation of vehicles (Parveen Cons)
OK CUTTING
Failure of equipment. Mob No-
SLINGS -OK SAFETY)

TSL Representative Working agency Engineer


TATA STEEL M/s. PARVEEN CONSTRUCTION
Note: 1. This Safe Work Procedure shall be prepared by owner department countersigned by contractor's representative and safety department.
2. Sequence of work shall invoice step-by-step jobs.
3. All possible hazard including proximity hazard shall be amended and persons shall be identified.
4. With the change of working conditions, the procedure shall be amended and persons shall be trained
5. Review on status of implementation shall be done though task observation
6. Before start of the job, induction shall be given to persons engaged at site by departmental representative and Contractor's Representative.
EHSMSM/WORKS/9203/9217 SAFE WORK PROCEDURE – CIVIL & STRUCTURAL WORK 41 of 58 | P a g e
(Performance Criteria - Perfection in job with no injury to persons or damage to property) or damage to property REV

1. DEPARTMENT : RMP-Joda (ENGG & PROJECTS-Tata Steel Ltd.) DOC. NO: SWP/PAR/FAP/Joda/01 DATE:

2. SECTION / LOCATION : Ferro Plant, Joda NAME OF WORKING AGENCY: M/s. PARVEEN CONSTRUCTION
3. JOB TITLE : Civil works for Effluent Treatment Plant WORK ORDER No: 3800016542/109

JOB DURATION : Start Date: 01/01/2021 End Date: 30/06/2021


Persons Responsible Condition of Tools / Reference to
Sl.
Activities (Sequence of Work) Hazard Safety Precautions Name & P. No. Tackles required OK/Not document/criteria and
No.
Ok remarks
All the vehicle should be checked as per the 9777344302 SAFETY SS/GEN-54
checklist before starting the job. HELMET- OK (PPE AND
Only competent operator with medically fit and Md.Abdus Salim, SAFETY CLOTHING
21 must have HMV license operate the equipment. Site SHOES-OK STANDARD)
Condition/fitness of equipment should be Supervioser(Parve
SAFETY
en Cons)
checked before use. JACKET- OK SS/ENGG-15
Mo.No-
6370417428 SAFETY (STORAGE OF
GLOVES - OK CONSTRUCTIO
SAFETY N MATERIAL)
GOGGLES-OK
Poor Stacking/Shifting of BARRICADING SS/ENGG-11
other materials –OK (SAFETY IN
Only skilled gang shall be deployed for the job.
MATERIAL
Pipe will be stacked in a designated place with
Mr.Bhaskar Das SPADE –OK HANDLING
scoth block to avoid rolling and area shouldbe
Gupta, Head RMP PICK AXE –OK EQUIPMENT)
barricaded.
Two person should be deployed to maintain the
Civil (TSL) HAMMER –OK
Mo.N0- CHISEL –OK SS/ENGG-13
balance while handling more than 9040092694
20feet(lenth)pope to avoid hit or dased with SHOVEL –OK (BARRICADING
Plumbing structure and people. Mr. LN Goswami,
GAITA-OK SAFETY)
Damaged tools/tackles GAMLA –OK SS/ENGG-05
Civil Engineer
(Parveen Cons) HAND PANJA – (WELDING AND
Mob No- OK CUTTING
Damage tools/tackles shall not be used at 9777344302 SLINGS -OK SAFETY)

TSL Representative Working agency Engineer


TATA STEEL M/s. PARVEEN CONSTRUCTION
Note: 1. This Safe Work Procedure shall be prepared by owner department countersigned by contractor's representative and safety department.
2. Sequence of work shall invoice step-by-step jobs.
3. All possible hazard including proximity hazard shall be amended and persons shall be identified.
4. With the change of working conditions, the procedure shall be amended and persons shall be trained
5. Review on status of implementation shall be done though task observation
6. Before start of the job, induction shall be given to persons engaged at site by departmental representative and Contractor's Representative.
EHSMSM/WORKS/9203/9217 SAFE WORK PROCEDURE – CIVIL & STRUCTURAL WORK 42 of 58 | P a g e
(Performance Criteria - Perfection in job with no injury to persons or damage to property) or damage to property REV

1. DEPARTMENT : RMP-Joda (ENGG & PROJECTS-Tata Steel Ltd.) DOC. NO: SWP/PAR/FAP/Joda/01 DATE:

2. SECTION / LOCATION : Ferro Plant, Joda NAME OF WORKING AGENCY: M/s. PARVEEN CONSTRUCTION
3. JOB TITLE : Civil works for Effluent Treatment Plant WORK ORDER No: 3800016542/109

JOB DURATION : Start Date: 01/01/2021 End Date: 30/06/2021


Persons Responsible Condition of Tools / Reference to
Sl.
Activities (Sequence of Work) Hazard Safety Precautions Name & P. No. Tackles required OK/Not document/criteria and
No.
Ok remarks

Fall of tools and materials. site,Always use standard tools at site. SAFETY SS/GEN-54
Md.Abdus Salim, HELMET- OK (PPE AND
While fitting sufficient manpower shall be Site SAFETY CLOTHING
deployed and remove the loose material from Supervioser(Parve SHOES-OK STANDARD)
height to avoid fall from height. en Cons)
Improper HouseKeeping SAFETY
Mo.No-
6370417428 JACKET- OK SS/ENGG-15
Housekeeping should be maintained at site in SAFETY (STORAGE OF
regular basis and all the loose material should be GLOVES - OK CONSTRUCTIO
kept in a container. SAFETY N MATERIAL)
GOGGLES-OK
Noise and dust during BARRICADING SS/ENGG-11
chipping –OK (SAFETY IN
and wall cutting MATERIAL
Ear plug and nose mask should be used while
Mr.Bhaskar Das SPADE –OK HANDLING
chipping.No person should be allowed to stand
under the job. Gupta, Head RMP PICK AXE –OK EQUIPMENT)
Civil (TSL) HAMMER –OK
Mo.N0- CHISEL –OK SS/ENGG-13
Use of damage wheel and 9040092694 SHOVEL –OK (BARRICADING
Damage tools/tackles removed from site & use
underground machine GAITA-OK SAFETY)
always standard tools at work site. Mr. LN Goswami,
Before starting the machine guard and wheel GAMLA –OK SS/ENGG-05
Civil Engineer
shall be checked(crack,damage) HAND PANJA – (WELDING AND
(Parveen Cons)
Loose cloth not be allowed during operating the Mob No- OK CUTTING
machine. SLINGS –OK SAFETY)

TSL Representative Working agency Engineer


TATA STEEL M/s. PARVEEN CONSTRUCTION
Note: 1. This Safe Work Procedure shall be prepared by owner department countersigned by contractor's representative and safety department.
2. Sequence of work shall invoice step-by-step jobs.
3. All possible hazard including proximity hazard shall be amended and persons shall be identified.
4. With the change of working conditions, the procedure shall be amended and persons shall be trained
5. Review on status of implementation shall be done though task observation
6. Before start of the job, induction shall be given to persons engaged at site by departmental representative and Contractor's Representative.
EHSMSM/WORKS/9203/9217 SAFE WORK PROCEDURE – CIVIL & STRUCTURAL WORK 43 of 58 | P a g e
(Performance Criteria - Perfection in job with no injury to persons or damage to property) or damage to property REV

1. DEPARTMENT : RMP-Joda (ENGG & PROJECTS-Tata Steel Ltd.) DOC. NO: SWP/PAR/FAP/Joda/01 DATE:

2. SECTION / LOCATION : Ferro Plant, Joda NAME OF WORKING AGENCY: M/s. PARVEEN CONSTRUCTION
3. JOB TITLE : Civil works for Effluent Treatment Plant WORK ORDER No: 3800016542/109

JOB DURATION : Start Date: 01/01/2021 End Date: 30/06/2021


Persons Responsible Condition of Tools / Reference to
Sl.
Activities (Sequence of Work) Hazard Safety Precautions Name & P. No. Tackles required OK/Not document/criteria and
No.
Ok remarks
9777344302 SAFETY SS/GEN-54
HELMET- OK (PPE AND
Md.Abdus Salim, SAFETY CLOTHING
Site SHOES-OK STANDARD)
Supervioser(Parve
SAFETY
en Cons)
Mo.No- JACKET- OK SS/ENGG-15
6370417428 SAFETY (STORAGE OF
22 GLOVES - OK CONSTRUCTIO
SAFETY N MATERIAL)
GOGGLES-OK
Untrained workers/supervisor. BARRICADING SS/ENGG-11
–OK (SAFETY IN
Only trained workers with experinced supervisor MATERIAL
should be engaged for shed sheeting & SPADE –OK HANDLING
dismantling job. PICK AXE –OK EQUIPMENT)
Mr.Bhaskar Das
Physicial Injury Gupta, Head RMP HAMMER –OK
Ensure six directional hazards & its precautions. Civil (TSL) CHISEL –OK SS/ENGG-13
Used required ppes like safety helmet, safety Mo.N0- SHOVEL –OK (BARRICADING
goggols,H.V jacket, Hand gloves,Safety shoe etc. 9040092694 GAITA-OK SAFETY)
Don’t keep the loose sheets on acces or without
GAMLA –OK SS/ENGG-05
any load. Safe scaffolding must be required Mr. LN Goswami,
HAND PANJA – (WELDING AND
during shed erection & dismantling work Civil Engineer
Access & approach should be clear during work (Parveen Cons) OK CUTTING
SLINGS -OK SAFETY)

TSL Representative Working agency Engineer


TATA STEEL M/s. PARVEEN CONSTRUCTION
Note: 1. This Safe Work Procedure shall be prepared by owner department countersigned by contractor's representative and safety department.
2. Sequence of work shall invoice step-by-step jobs.
3. All possible hazard including proximity hazard shall be amended and persons shall be identified.
4. With the change of working conditions, the procedure shall be amended and persons shall be trained
5. Review on status of implementation shall be done though task observation
6. Before start of the job, induction shall be given to persons engaged at site by departmental representative and Contractor's Representative.
EHSMSM/WORKS/9203/9217 SAFE WORK PROCEDURE – CIVIL & STRUCTURAL WORK 44 of 58 | P a g e
(Performance Criteria - Perfection in job with no injury to persons or damage to property) or damage to property REV

1. DEPARTMENT : RMP-Joda (ENGG & PROJECTS-Tata Steel Ltd.) DOC. NO: SWP/PAR/FAP/Joda/01 DATE:

2. SECTION / LOCATION : Ferro Plant, Joda NAME OF WORKING AGENCY: M/s. PARVEEN CONSTRUCTION
3. JOB TITLE : Civil works for Effluent Treatment Plant WORK ORDER No: 3800016542/109

JOB DURATION : Start Date: 01/01/2021 End Date: 30/06/2021


Persons Responsible Condition of Tools / Reference to
Sl.
Activities (Sequence of Work) Hazard Safety Precautions Name & P. No. Tackles required OK/Not document/criteria and
No.
Ok remarks

Sheeting & Dismantling at height Right tools must be used for fixing or Mob No- SAFETY SS/GEN-54
removing the sheets. J hook must be used for 9777344302 HELMET- OK (PPE AND
of Shed
fixing the sheet on shed.Materials should be SAFETY CLOTHING
handle with rope for lifting &lowering Md.Abdus Salim, SHOES-OK STANDARD)
Dismantling materials should be stacked safely as Site
Working at Height. SAFETY
per standrad. Shed sheeting & dismantling work Supervioser(Parve
en Cons) JACKET- OK SS/ENGG-15
should be done in day light. SAFETY (STORAGE OF
Mo.No-
6370417428 GLOVES - OK CONSTRUCTIO
Only height tested worker should be used for SAFETY N MATERIAL)
work at height. Before dismantling a plan must GOGGLES-OK
Fall of materials be approved by concerned engineer
BARRICADING SS/ENGG-11
sheeting & Dismantling job should not be done
–OK (SAFETY IN
during heavy rain & wind.
MATERIAL
Safe scaffolding must be required during shed
SPADE –OK HANDLING
sheeting & dismantling work.
Access & approach should be clear during work
PICK AXE –OK EQUIPMENT)
at height. HAMMER –OK
Safety belt must be used during working at Mr.Bhaskar Das CHISEL –OK SS/ENGG-13
height . Gupta, Head RMP SHOVEL –OK (BARRICADING
Civil (TSL) GAITA-OK SAFETY)
Provide weight on loose sheets
Mo.N0- GAMLA –OK SS/ENGG-05
Materials should be stacked not more than 1.2
9040092694 HAND PANJA – (WELDING AND
mtr height.
Shed dismantling area should be barricaded. OK CUTTING
Mr. LN Goswami,
Ensure unauthorised persons should not be SLINGS -OK SAFETY)

TSL Representative Working agency Engineer


TATA STEEL M/s. PARVEEN CONSTRUCTION
Note: 1. This Safe Work Procedure shall be prepared by owner department countersigned by contractor's representative and safety department.
2. Sequence of work shall invoice step-by-step jobs.
3. All possible hazard including proximity hazard shall be amended and persons shall be identified.
4. With the change of working conditions, the procedure shall be amended and persons shall be trained
5. Review on status of implementation shall be done though task observation
6. Before start of the job, induction shall be given to persons engaged at site by departmental representative and Contractor's Representative.
EHSMSM/WORKS/9203/9217 SAFE WORK PROCEDURE – CIVIL & STRUCTURAL WORK 45 of 58 | P a g e
(Performance Criteria - Perfection in job with no injury to persons or damage to property) or damage to property REV

1. DEPARTMENT : RMP-Joda (ENGG & PROJECTS-Tata Steel Ltd.) DOC. NO: SWP/PAR/FAP/Joda/01 DATE:

2. SECTION / LOCATION : Ferro Plant, Joda NAME OF WORKING AGENCY: M/s. PARVEEN CONSTRUCTION
3. JOB TITLE : Civil works for Effluent Treatment Plant WORK ORDER No: 3800016542/109

JOB DURATION : Start Date: 01/01/2021 End Date: 30/06/2021


Persons Responsible Condition of Tools / Reference to
Sl.
Activities (Sequence of Work) Hazard Safety Precautions Name & P. No. Tackles required OK/Not document/criteria and
No.
Ok remarks
allowed at work area. Civil Engineer SS/GEN-54
(Parveen Cons) SAFETY (PPE AND
Mob No- HELMET- OK CLOTHING
9777344302 SAFETY STANDARD)
SHOES-OK
Md.Abdus Salim,
Site SAFETY SS/ENGG-15
Supervioser(Parve JACKET- OK (STORAGE OF
en Cons) SAFETY CONSTRUCTIO
Injury due ti hit,fall during GLOVES - OK N MATERIAL)
Mo.No-
shifting/handling 6370417428 SAFETY
23. GOGGLES-OK SS/ENGG-11
BARRICADING (SAFETY IN
–OK MATERIAL
Improper stacking/Shifting All the worker should be used proper PPEs.and
HANDLING
of stone materials. Loose clothing should not be permited.
Day to day housekeeping shall be maintained in
SPADE –OK EQUIPMENT)
regular basis at work site. Access shall be free PICK AXE –OK
from any obstruction. HAMMER –OK SS/ENGG-13
Mr.Bhaskar Das CHISEL –OK (BARRICADING
Damage tools/tackles. All stones/tiles shall be shifted & stacking in a Gupta, Head RMP SHOVEL –OK SAFETY)
proper manner or leveled floor.Material shall not Civil (TSL) GAITA-OK SS/ENGG-05
be kept at edge of floor to prevent fall from Mo.N0-
GAMLA –OK (WELDING AND
height. 9040092694
HAND PANJA – CUTTING
OK SAFETY)

TSL Representative Working agency Engineer


TATA STEEL M/s. PARVEEN CONSTRUCTION
Note: 1. This Safe Work Procedure shall be prepared by owner department countersigned by contractor's representative and safety department.
2. Sequence of work shall invoice step-by-step jobs.
3. All possible hazard including proximity hazard shall be amended and persons shall be identified.
4. With the change of working conditions, the procedure shall be amended and persons shall be trained
5. Review on status of implementation shall be done though task observation
6. Before start of the job, induction shall be given to persons engaged at site by departmental representative and Contractor's Representative.
EHSMSM/WORKS/9203/9217 SAFE WORK PROCEDURE – CIVIL & STRUCTURAL WORK 46 of 58 | P a g e
(Performance Criteria - Perfection in job with no injury to persons or damage to property) or damage to property REV

1. DEPARTMENT : RMP-Joda (ENGG & PROJECTS-Tata Steel Ltd.) DOC. NO: SWP/PAR/FAP/Joda/01 DATE:

2. SECTION / LOCATION : Ferro Plant, Joda NAME OF WORKING AGENCY: M/s. PARVEEN CONSTRUCTION
3. JOB TITLE : Civil works for Effluent Treatment Plant WORK ORDER No: 3800016542/109

JOB DURATION : Start Date: 01/01/2021 End Date: 30/06/2021


Persons Responsible Condition of Tools / Reference to
Sl.
Activities (Sequence of Work) Hazard Safety Precautions Name & P. No. Tackles required OK/Not document/criteria and
No.
Ok remarks
Electric Shock Damage tools/tackles removed from site & use Mr. LN Goswami, SAFETY SS/GEN-54
always standard tools at work site. Civil Engineer HELMET- OK (PPE AND
Machine used in Tiles/stone cutting power (Parveen Cons) SAFETY CLOTHING
conection shall be tacken through ELCB. Mob No- SHOES-OK STANDARD)
Tiles Fixing/Kota Stone Machine should be insulated & connection shall 9777344302
SAFETY
be taken by Industrial top. Before starting the JACKET- OK SS/ENGG-15
Work Md.Abdus Salim,
Physical Injury(Dust,Noise) machine guard and wheel shall be SAFETY (STORAGE OF
Site
checked(cracck,damage) Loose cloth not to be GLOVES - OK CONSTRUCTIO
Supervioser(Parve
allowed during operating the machine. SAFETY N MATERIAL)
en Cons)
Ear plug shall be used by operatore to eleminate Mo.No- GOGGLES-OK
the noise. Safety goggles dust mask and other 6370417428 BARRICADING SS/ENGG-11
required PPEs shall be used by the operatore and
–OK (SAFETY IN
helper. Only export operatore shall operates the
MATERIAL
machine.
SPADE –OK HANDLING
PICK AXE –OK EQUIPMENT)
HAMMER –OK
CHISEL –OK SS/ENGG-13
SHOVEL –OK (BARRICADING
Mr.Bhaskar Das GAITA-OK SAFETY)
Gupta, Head RMP GAMLA –OK SS/ENGG-05
Civil (TSL)
HAND PANJA – (WELDING AND
Mo.N0-
9040092694 OK CUTTING
SAFETY)

TSL Representative Working agency Engineer


TATA STEEL M/s. PARVEEN CONSTRUCTION
Note: 1. This Safe Work Procedure shall be prepared by owner department countersigned by contractor's representative and safety department.
2. Sequence of work shall invoice step-by-step jobs.
3. All possible hazard including proximity hazard shall be amended and persons shall be identified.
4. With the change of working conditions, the procedure shall be amended and persons shall be trained
5. Review on status of implementation shall be done though task observation
6. Before start of the job, induction shall be given to persons engaged at site by departmental representative and Contractor's Representative.
EHSMSM/WORKS/9203/9217 SAFE WORK PROCEDURE – CIVIL & STRUCTURAL WORK 47 of 58 | P a g e
(Performance Criteria - Perfection in job with no injury to persons or damage to property) or damage to property REV

1. DEPARTMENT : RMP-Joda (ENGG & PROJECTS-Tata Steel Ltd.) DOC. NO: SWP/PAR/FAP/Joda/01 DATE:

2. SECTION / LOCATION : Ferro Plant, Joda NAME OF WORKING AGENCY: M/s. PARVEEN CONSTRUCTION
3. JOB TITLE : Civil works for Effluent Treatment Plant WORK ORDER No: 3800016542/109

JOB DURATION : Start Date: 01/01/2021 End Date: 30/06/2021


Persons Responsible Condition of Tools / Reference to
Sl.
Activities (Sequence of Work) Hazard Safety Precautions Name & P. No. Tackles required OK/Not document/criteria and
No.
Ok remarks

Mr. LN Goswami,
Civil Engineer
(Parveen Cons)
Mob No-
9777344302

Md.Abdus Salim,
Site
Supervioser(Parve
en Cons) SLINGS -OK
Mo.No- NYLON ROPE
6370417428 – OK
D-SHACKLE-
OK

TSL Representative Working agency Engineer


TATA STEEL M/s. PARVEEN CONSTRUCTION
Note: 1. This Safe Work Procedure shall be prepared by owner department countersigned by contractor's representative and safety department.
2. Sequence of work shall invoice step-by-step jobs.
3. All possible hazard including proximity hazard shall be amended and persons shall be identified.
4. With the change of working conditions, the procedure shall be amended and persons shall be trained
5. Review on status of implementation shall be done though task observation
6. Before start of the job, induction shall be given to persons engaged at site by departmental representative and Contractor's Representative.
EHSMSM/WORKS/9203/9217 SAFE WORK PROCEDURE – CIVIL & STRUCTURAL WORK 48 of 58 | P a g e
(Performance Criteria - Perfection in job with no injury to persons or damage to property) or damage to property REV

1. DEPARTMENT : RMP-Joda (ENGG & PROJECTS-Tata Steel Ltd.) DOC. NO: SWP/PAR/FAP/Joda/01 DATE:

2. SECTION / LOCATION : Ferro Plant, Joda NAME OF WORKING AGENCY: M/s. PARVEEN CONSTRUCTION
3. JOB TITLE : Civil works for Effluent Treatment Plant WORK ORDER No: 3800016542/109

JOB DURATION : Start Date: 01/01/2021 End Date: 30/06/2021


Persons Responsible Condition of Tools / Reference to
Sl.
Activities (Sequence of Work) Hazard Safety Precautions Name & P. No. Tackles required OK/Not document/criteria and
No.
Ok remarks

TSL Representative Working agency Engineer


TATA STEEL M/s. PARVEEN CONSTRUCTION
Note: 1. This Safe Work Procedure shall be prepared by owner department countersigned by contractor's representative and safety department.
2. Sequence of work shall invoice step-by-step jobs.
3. All possible hazard including proximity hazard shall be amended and persons shall be identified.
4. With the change of working conditions, the procedure shall be amended and persons shall be trained
5. Review on status of implementation shall be done though task observation
6. Before start of the job, induction shall be given to persons engaged at site by departmental representative and Contractor's Representative.
EHSMSM/WORKS/9203/9217 SAFE WORK PROCEDURE – CIVIL & STRUCTURAL WORK 49 of 58 | P a g e
(Performance Criteria - Perfection in job with no injury to persons or damage to property) or damage to property REV

1. DEPARTMENT : RMP-Joda (ENGG & PROJECTS-Tata Steel Ltd.) DOC. NO: SWP/PAR/FAP/Joda/01 DATE:

2. SECTION / LOCATION : Ferro Plant, Joda NAME OF WORKING AGENCY: M/s. PARVEEN CONSTRUCTION
3. JOB TITLE : Civil works for Effluent Treatment Plant WORK ORDER No: 3800016542/109

JOB DURATION : Start Date: 01/01/2021 End Date: 30/06/2021


Persons Responsible Condition of Tools / Reference to
Sl.
Activities (Sequence of Work) Hazard Safety Precautions Name & P. No. Tackles required OK/Not document/criteria and
No.
Ok remarks
SLINGS -OK
NYLON ROPE
– OK
D-SHACKLE-
OK

10.

TSL Representative Working agency Engineer


TATA STEEL M/s. PARVEEN CONSTRUCTION
Note: 1. This Safe Work Procedure shall be prepared by owner department countersigned by contractor's representative and safety department.
2. Sequence of work shall invoice step-by-step jobs.
3. All possible hazard including proximity hazard shall be amended and persons shall be identified.
4. With the change of working conditions, the procedure shall be amended and persons shall be trained
5. Review on status of implementation shall be done though task observation
6. Before start of the job, induction shall be given to persons engaged at site by departmental representative and Contractor's Representative.
EHSMSM/WORKS/9203/9217 SAFE WORK PROCEDURE – CIVIL & STRUCTURAL WORK 50 of 58 | P a g e
(Performance Criteria - Perfection in job with no injury to persons or damage to property) or damage to property REV

1. DEPARTMENT : RMP-Joda (ENGG & PROJECTS-Tata Steel Ltd.) DOC. NO: SWP/PAR/FAP/Joda/01 DATE:

2. SECTION / LOCATION : Ferro Plant, Joda NAME OF WORKING AGENCY: M/s. PARVEEN CONSTRUCTION
3. JOB TITLE : Civil works for Effluent Treatment Plant WORK ORDER No: 3800016542/109

JOB DURATION : Start Date: 01/01/2021 End Date: 30/06/2021


Persons Responsible Condition of Tools / Reference to
Sl.
Activities (Sequence of Work) Hazard Safety Precautions Name & P. No. Tackles required OK/Not document/criteria and
No.
Ok remarks

SPADE –OK
SHOVEL –OK
GAITA-OK
GAMLA –OK
HAND PANJA –
OK

11.

TSL Representative Working agency Engineer


TATA STEEL M/s. PARVEEN CONSTRUCTION
Note: 1. This Safe Work Procedure shall be prepared by owner department countersigned by contractor's representative and safety department.
2. Sequence of work shall invoice step-by-step jobs.
3. All possible hazard including proximity hazard shall be amended and persons shall be identified.
4. With the change of working conditions, the procedure shall be amended and persons shall be trained
5. Review on status of implementation shall be done though task observation
6. Before start of the job, induction shall be given to persons engaged at site by departmental representative and Contractor's Representative.
EHSMSM/WORKS/9203/9217 SAFE WORK PROCEDURE – CIVIL & STRUCTURAL WORK 51 of 58 | P a g e
(Performance Criteria - Perfection in job with no injury to persons or damage to property) or damage to property REV

1. DEPARTMENT : RMP-Joda (ENGG & PROJECTS-Tata Steel Ltd.) DOC. NO: SWP/PAR/FAP/Joda/01 DATE:

2. SECTION / LOCATION : Ferro Plant, Joda NAME OF WORKING AGENCY: M/s. PARVEEN CONSTRUCTION
3. JOB TITLE : Civil works for Effluent Treatment Plant WORK ORDER No: 3800016542/109

JOB DURATION : Start Date: 01/01/2021 End Date: 30/06/2021


Persons Responsible Condition of Tools / Reference to
Sl.
Activities (Sequence of Work) Hazard Safety Precautions Name & P. No. Tackles required OK/Not document/criteria and
No.
Ok remarks

SPADE –OK
PICK AXE –OK
SHOVEL –OK
GAITA-OK
GAMLA –OK
HAND PANJA –
OK

TSL Representative Working agency Engineer


TATA STEEL M/s. PARVEEN CONSTRUCTION
Note: 1. This Safe Work Procedure shall be prepared by owner department countersigned by contractor's representative and safety department.
2. Sequence of work shall invoice step-by-step jobs.
3. All possible hazard including proximity hazard shall be amended and persons shall be identified.
4. With the change of working conditions, the procedure shall be amended and persons shall be trained
5. Review on status of implementation shall be done though task observation
6. Before start of the job, induction shall be given to persons engaged at site by departmental representative and Contractor's Representative.
EHSMSM/WORKS/9203/9217 SAFE WORK PROCEDURE – CIVIL & STRUCTURAL WORK 52 of 58 | P a g e
(Performance Criteria - Perfection in job with no injury to persons or damage to property) or damage to property REV

1. DEPARTMENT : RMP-Joda (ENGG & PROJECTS-Tata Steel Ltd.) DOC. NO: SWP/PAR/FAP/Joda/01 DATE:

2. SECTION / LOCATION : Ferro Plant, Joda NAME OF WORKING AGENCY: M/s. PARVEEN CONSTRUCTION
3. JOB TITLE : Civil works for Effluent Treatment Plant WORK ORDER No: 3800016542/109

JOB DURATION : Start Date: 01/01/2021 End Date: 30/06/2021


Persons Responsible Condition of Tools / Reference to
Sl.
Activities (Sequence of Work) Hazard Safety Precautions Name & P. No. Tackles required OK/Not document/criteria and
No.
Ok remarks

SPADE –OK
PICK AXE –OK
HAMMER –OK
CHISEL –OK
SHOVEL –OK
GAITA-OK
GAMLA –OK
HAND PANJA –
OK

TSL Representative Working agency Engineer


TATA STEEL M/s. PARVEEN CONSTRUCTION
Note: 1. This Safe Work Procedure shall be prepared by owner department countersigned by contractor's representative and safety department.
2. Sequence of work shall invoice step-by-step jobs.
3. All possible hazard including proximity hazard shall be amended and persons shall be identified.
4. With the change of working conditions, the procedure shall be amended and persons shall be trained
5. Review on status of implementation shall be done though task observation
6. Before start of the job, induction shall be given to persons engaged at site by departmental representative and Contractor's Representative.
EHSMSM/WORKS/9203/9217 SAFE WORK PROCEDURE – CIVIL & STRUCTURAL WORK 53 of 58 | P a g e
(Performance Criteria - Perfection in job with no injury to persons or damage to property) or damage to property REV

1. DEPARTMENT : RMP-Joda (ENGG & PROJECTS-Tata Steel Ltd.) DOC. NO: SWP/PAR/FAP/Joda/01 DATE:

2. SECTION / LOCATION : Ferro Plant, Joda NAME OF WORKING AGENCY: M/s. PARVEEN CONSTRUCTION
3. JOB TITLE : Civil works for Effluent Treatment Plant WORK ORDER No: 3800016542/109

JOB DURATION : Start Date: 01/01/2021 End Date: 30/06/2021


Persons Responsible Condition of Tools / Reference to
Sl.
Activities (Sequence of Work) Hazard Safety Precautions Name & P. No. Tackles required OK/Not document/criteria and
No.
Ok remarks

TSL Representative Working agency Engineer


TATA STEEL M/s. PARVEEN CONSTRUCTION
Note: 1. This Safe Work Procedure shall be prepared by owner department countersigned by contractor's representative and safety department.
2. Sequence of work shall invoice step-by-step jobs.
3. All possible hazard including proximity hazard shall be amended and persons shall be identified.
4. With the change of working conditions, the procedure shall be amended and persons shall be trained
5. Review on status of implementation shall be done though task observation
6. Before start of the job, induction shall be given to persons engaged at site by departmental representative and Contractor's Representative.
EHSMSM/WORKS/9203/9217 SAFE WORK PROCEDURE – CIVIL & STRUCTURAL WORK 54 of 58 | P a g e
(Performance Criteria - Perfection in job with no injury to persons or damage to property) or damage to property REV

1. DEPARTMENT : RMP-Joda (ENGG & PROJECTS-Tata Steel Ltd.) DOC. NO: SWP/PAR/FAP/Joda/01 DATE:

2. SECTION / LOCATION : Ferro Plant, Joda NAME OF WORKING AGENCY: M/s. PARVEEN CONSTRUCTION
3. JOB TITLE : Civil works for Effluent Treatment Plant WORK ORDER No: 3800016542/109

JOB DURATION : Start Date: 01/01/2021 End Date: 30/06/2021


Persons Responsible Condition of Tools / Reference to
Sl.
Activities (Sequence of Work) Hazard Safety Precautions Name & P. No. Tackles required OK/Not document/criteria and
No.
Ok remarks

GAS CUTTER
SET
OXYGEN
CYLINDER –
OK
LPG - OK

TSL Representative Working agency Engineer


TATA STEEL M/s. PARVEEN CONSTRUCTION
Note: 1. This Safe Work Procedure shall be prepared by owner department countersigned by contractor's representative and safety department.
2. Sequence of work shall invoice step-by-step jobs.
3. All possible hazard including proximity hazard shall be amended and persons shall be identified.
4. With the change of working conditions, the procedure shall be amended and persons shall be trained
5. Review on status of implementation shall be done though task observation
6. Before start of the job, induction shall be given to persons engaged at site by departmental representative and Contractor's Representative.
EHSMSM/WORKS/9203/9217 SAFE WORK PROCEDURE – CIVIL & STRUCTURAL WORK 55 of 58 | P a g e
(Performance Criteria - Perfection in job with no injury to persons or damage to property) or damage to property REV

1. DEPARTMENT : RMP-Joda (ENGG & PROJECTS-Tata Steel Ltd.) DOC. NO: SWP/PAR/FAP/Joda/01 DATE:

2. SECTION / LOCATION : Ferro Plant, Joda NAME OF WORKING AGENCY: M/s. PARVEEN CONSTRUCTION
3. JOB TITLE : Civil works for Effluent Treatment Plant WORK ORDER No: 3800016542/109

JOB DURATION : Start Date: 01/01/2021 End Date: 30/06/2021


Persons Responsible Condition of Tools / Reference to
Sl.
Activities (Sequence of Work) Hazard Safety Precautions Name & P. No. Tackles required OK/Not document/criteria and
No.
Ok remarks

12.

TSL Representative Working agency Engineer


TATA STEEL M/s. PARVEEN CONSTRUCTION
Note: 1. This Safe Work Procedure shall be prepared by owner department countersigned by contractor's representative and safety department.
2. Sequence of work shall invoice step-by-step jobs.
3. All possible hazard including proximity hazard shall be amended and persons shall be identified.
4. With the change of working conditions, the procedure shall be amended and persons shall be trained
5. Review on status of implementation shall be done though task observation
6. Before start of the job, induction shall be given to persons engaged at site by departmental representative and Contractor's Representative.
EHSMSM/WORKS/9203/9217 SAFE WORK PROCEDURE – CIVIL & STRUCTURAL WORK 56 of 58 | P a g e
(Performance Criteria - Perfection in job with no injury to persons or damage to property) or damage to property REV

1. DEPARTMENT : RMP-Joda (ENGG & PROJECTS-Tata Steel Ltd.) DOC. NO: SWP/PAR/FAP/Joda/01 DATE:

2. SECTION / LOCATION : Ferro Plant, Joda NAME OF WORKING AGENCY: M/s. PARVEEN CONSTRUCTION
3. JOB TITLE : Civil works for Effluent Treatment Plant WORK ORDER No: 3800016542/109

JOB DURATION : Start Date: 01/01/2021 End Date: 30/06/2021


Persons Responsible Condition of Tools / Reference to
Sl.
Activities (Sequence of Work) Hazard Safety Precautions Name & P. No. Tackles required OK/Not document/criteria and
No.
Ok remarks

TSL Representative Working agency Engineer


TATA STEEL M/s. PARVEEN CONSTRUCTION
Note: 1. This Safe Work Procedure shall be prepared by owner department countersigned by contractor's representative and safety department.
2. Sequence of work shall invoice step-by-step jobs.
3. All possible hazard including proximity hazard shall be amended and persons shall be identified.
4. With the change of working conditions, the procedure shall be amended and persons shall be trained
5. Review on status of implementation shall be done though task observation
6. Before start of the job, induction shall be given to persons engaged at site by departmental representative and Contractor's Representative.
EHSMSM/WORKS/9203/9217 SAFE WORK PROCEDURE – CIVIL & STRUCTURAL WORK 57 of 58 | P a g e
(Performance Criteria - Perfection in job with no injury to persons or damage to property) or damage to property REV

1. DEPARTMENT : RMP-Joda (ENGG & PROJECTS-Tata Steel Ltd.) DOC. NO: SWP/PAR/FAP/Joda/01 DATE:

2. SECTION / LOCATION : Ferro Plant, Joda NAME OF WORKING AGENCY: M/s. PARVEEN CONSTRUCTION
3. JOB TITLE : Civil works for Effluent Treatment Plant WORK ORDER No: 3800016542/109

JOB DURATION : Start Date: 01/01/2021 End Date: 30/06/2021


Persons Responsible Condition of Tools / Reference to
Sl.
Activities (Sequence of Work) Hazard Safety Precautions Name & P. No. Tackles required OK/Not document/criteria and
No.
Ok remarks

13.

TSL Representative Working agency Engineer


TATA STEEL M/s. PARVEEN CONSTRUCTION
Note: 1. This Safe Work Procedure shall be prepared by owner department countersigned by contractor's representative and safety department.
2. Sequence of work shall invoice step-by-step jobs.
3. All possible hazard including proximity hazard shall be amended and persons shall be identified.
4. With the change of working conditions, the procedure shall be amended and persons shall be trained
5. Review on status of implementation shall be done though task observation
6. Before start of the job, induction shall be given to persons engaged at site by departmental representative and Contractor's Representative.
EHSMSM/WORKS/9203/9217 SAFE WORK PROCEDURE – CIVIL & STRUCTURAL WORK 58 of 58 | P a g e
(Performance Criteria - Perfection in job with no injury to persons or damage to property) or damage to property REV

1. DEPARTMENT : RMP-Joda (ENGG & PROJECTS-Tata Steel Ltd.) DOC. NO: SWP/PAR/FAP/Joda/01 DATE:

2. SECTION / LOCATION : Ferro Plant, Joda NAME OF WORKING AGENCY: M/s. PARVEEN CONSTRUCTION
3. JOB TITLE : Civil works for Effluent Treatment Plant WORK ORDER No: 3800016542/109

JOB DURATION : Start Date: 01/01/2021 End Date: 30/06/2021


Persons Responsible Condition of Tools / Reference to
Sl.
Activities (Sequence of Work) Hazard Safety Precautions Name & P. No. Tackles required OK/Not document/criteria and
No.
Ok remarks

TSL Representative Working agency Engineer


TATA STEEL M/s. PARVEEN CONSTRUCTION
Note: 1. This Safe Work Procedure shall be prepared by owner department countersigned by contractor's representative and safety department.
2. Sequence of work shall invoice step-by-step jobs.
3. All possible hazard including proximity hazard shall be amended and persons shall be identified.
4. With the change of working conditions, the procedure shall be amended and persons shall be trained
5. Review on status of implementation shall be done though task observation
6. Before start of the job, induction shall be given to persons engaged at site by departmental representative and Contractor's Representative.
EHSMSM/WORKS/9203/9217 SAFE WORK PROCEDURE – CIVIL & STRUCTURAL WORK 59 of 58 | P a g e
(Performance Criteria - Perfection in job with no injury to persons or damage to property) or damage to property REV

1. DEPARTMENT : RMP-Joda (ENGG & PROJECTS-Tata Steel Ltd.) DOC. NO: SWP/PAR/FAP/Joda/01 DATE:

2. SECTION / LOCATION : Ferro Plant, Joda NAME OF WORKING AGENCY: M/s. PARVEEN CONSTRUCTION
3. JOB TITLE : Civil works for Effluent Treatment Plant WORK ORDER No: 3800016542/109

JOB DURATION : Start Date: 01/01/2021 End Date: 30/06/2021


Persons Responsible Condition of Tools / Reference to
Sl.
Activities (Sequence of Work) Hazard Safety Precautions Name & P. No. Tackles required OK/Not document/criteria and
No.
Ok remarks

GAITA -OK
BELCHA- OK
GAMLA-OK

TSL Representative Working agency Engineer


TATA STEEL M/s. PARVEEN CONSTRUCTION
Note: 1. This Safe Work Procedure shall be prepared by owner department countersigned by contractor's representative and safety department.
2. Sequence of work shall invoice step-by-step jobs.
3. All possible hazard including proximity hazard shall be amended and persons shall be identified.
4. With the change of working conditions, the procedure shall be amended and persons shall be trained
5. Review on status of implementation shall be done though task observation
6. Before start of the job, induction shall be given to persons engaged at site by departmental representative and Contractor's Representative.
EHSMSM/WORKS/9203/9217 SAFE WORK PROCEDURE – CIVIL & STRUCTURAL WORK 60 of 58 | P a g e
(Performance Criteria - Perfection in job with no injury to persons or damage to property) or damage to property REV

1. DEPARTMENT : RMP-Joda (ENGG & PROJECTS-Tata Steel Ltd.) DOC. NO: SWP/PAR/FAP/Joda/01 DATE:

2. SECTION / LOCATION : Ferro Plant, Joda NAME OF WORKING AGENCY: M/s. PARVEEN CONSTRUCTION
3. JOB TITLE : Civil works for Effluent Treatment Plant WORK ORDER No: 3800016542/109

JOB DURATION : Start Date: 01/01/2021 End Date: 30/06/2021


Persons Responsible Condition of Tools / Reference to
Sl.
Activities (Sequence of Work) Hazard Safety Precautions Name & P. No. Tackles required OK/Not document/criteria and
No.
Ok remarks

F15 CRANE -
OK

SLINGS- OK
D-SHACKLE -
OK

TSL Representative Working agency Engineer


TATA STEEL M/s. PARVEEN CONSTRUCTION
Note: 1. This Safe Work Procedure shall be prepared by owner department countersigned by contractor's representative and safety department.
2. Sequence of work shall invoice step-by-step jobs.
3. All possible hazard including proximity hazard shall be amended and persons shall be identified.
4. With the change of working conditions, the procedure shall be amended and persons shall be trained
5. Review on status of implementation shall be done though task observation
6. Before start of the job, induction shall be given to persons engaged at site by departmental representative and Contractor's Representative.
EHSMSM/WORKS/9203/9217 SAFE WORK PROCEDURE – CIVIL & STRUCTURAL WORK 61 of 58 | P a g e
(Performance Criteria - Perfection in job with no injury to persons or damage to property) or damage to property REV

1. DEPARTMENT : RMP-Joda (ENGG & PROJECTS-Tata Steel Ltd.) DOC. NO: SWP/PAR/FAP/Joda/01 DATE:

2. SECTION / LOCATION : Ferro Plant, Joda NAME OF WORKING AGENCY: M/s. PARVEEN CONSTRUCTION
3. JOB TITLE : Civil works for Effluent Treatment Plant WORK ORDER No: 3800016542/109

JOB DURATION : Start Date: 01/01/2021 End Date: 30/06/2021


Persons Responsible Condition of Tools / Reference to
Sl.
Activities (Sequence of Work) Hazard Safety Precautions Name & P. No. Tackles required OK/Not document/criteria and
No.
Ok remarks

SPANNER SET
- OK
CUTTING SET
– OK
LADDER
TROLLEY -OK

SPANNER SET
-OK
CUTTING
PLUS -OK
LADDER
TROLLEY -OK

TSL Representative Working agency Engineer


TATA STEEL M/s. PARVEEN CONSTRUCTION
Note: 1. This Safe Work Procedure shall be prepared by owner department countersigned by contractor's representative and safety department.
2. Sequence of work shall invoice step-by-step jobs.
3. All possible hazard including proximity hazard shall be amended and persons shall be identified.
4. With the change of working conditions, the procedure shall be amended and persons shall be trained
5. Review on status of implementation shall be done though task observation
6. Before start of the job, induction shall be given to persons engaged at site by departmental representative and Contractor's Representative.
EHSMSM/WORKS/9203/9217 SAFE WORK PROCEDURE – CIVIL & STRUCTURAL WORK 62 of 58 | P a g e
(Performance Criteria - Perfection in job with no injury to persons or damage to property) or damage to property REV

1. DEPARTMENT : RMP-Joda (ENGG & PROJECTS-Tata Steel Ltd.) DOC. NO: SWP/PAR/FAP/Joda/01 DATE:

2. SECTION / LOCATION : Ferro Plant, Joda NAME OF WORKING AGENCY: M/s. PARVEEN CONSTRUCTION
3. JOB TITLE : Civil works for Effluent Treatment Plant WORK ORDER No: 3800016542/109

JOB DURATION : Start Date: 01/01/2021 End Date: 30/06/2021


Persons Responsible Condition of Tools / Reference to
Sl.
Activities (Sequence of Work) Hazard Safety Precautions Name & P. No. Tackles required OK/Not document/criteria and
No.
Ok remarks

TSL Representative Working agency Engineer


TATA STEEL M/s. PARVEEN CONSTRUCTION
Note: 1. This Safe Work Procedure shall be prepared by owner department countersigned by contractor's representative and safety department.
2. Sequence of work shall invoice step-by-step jobs.
3. All possible hazard including proximity hazard shall be amended and persons shall be identified.
4. With the change of working conditions, the procedure shall be amended and persons shall be trained
5. Review on status of implementation shall be done though task observation
6. Before start of the job, induction shall be given to persons engaged at site by departmental representative and Contractor's Representative.
EHSMSM/WORKS/9203/9217 SAFE WORK PROCEDURE – CIVIL & STRUCTURAL WORK 63 of 58 | P a g e
(Performance Criteria - Perfection in job with no injury to persons or damage to property) or damage to property REV

1. DEPARTMENT : RMP-Joda (ENGG & PROJECTS-Tata Steel Ltd.) DOC. NO: SWP/PAR/FAP/Joda/01 DATE:

2. SECTION / LOCATION : Ferro Plant, Joda NAME OF WORKING AGENCY: M/s. PARVEEN CONSTRUCTION
3. JOB TITLE : Civil works for Effluent Treatment Plant WORK ORDER No: 3800016542/109

JOB DURATION : Start Date: 01/01/2021 End Date: 30/06/2021


Persons Responsible Condition of Tools / Reference to
Sl.
Activities (Sequence of Work) Hazard Safety Precautions Name & P. No. Tackles required OK/Not document/criteria and
No.
Ok remarks

TSL Representative Working agency Engineer


TATA STEEL M/s. PARVEEN CONSTRUCTION
Note: 1. This Safe Work Procedure shall be prepared by owner department countersigned by contractor's representative and safety department.
2. Sequence of work shall invoice step-by-step jobs.
3. All possible hazard including proximity hazard shall be amended and persons shall be identified.
4. With the change of working conditions, the procedure shall be amended and persons shall be trained
5. Review on status of implementation shall be done though task observation
6. Before start of the job, induction shall be given to persons engaged at site by departmental representative and Contractor's Representative.
EHSMSM/WORKS/9203/9217 SAFE WORK PROCEDURE – CIVIL & STRUCTURAL WORK 64 of 58 | P a g e
(Performance Criteria - Perfection in job with no injury to persons or damage to property) or damage to property REV

1. DEPARTMENT : RMP-Joda (ENGG & PROJECTS-Tata Steel Ltd.) DOC. NO: SWP/PAR/FAP/Joda/01 DATE:

2. SECTION / LOCATION : Ferro Plant, Joda NAME OF WORKING AGENCY: M/s. PARVEEN CONSTRUCTION
3. JOB TITLE : Civil works for Effluent Treatment Plant WORK ORDER No: 3800016542/109

JOB DURATION : Start Date: 01/01/2021 End Date: 30/06/2021


Persons Responsible Condition of Tools / Reference to
Sl.
Activities (Sequence of Work) Hazard Safety Precautions Name & P. No. Tackles required OK/Not document/criteria and
No.
Ok remarks

TSL Representative Working agency Engineer


TATA STEEL M/s. PARVEEN CONSTRUCTION
Note: 1. This Safe Work Procedure shall be prepared by owner department countersigned by contractor's representative and safety department.
2. Sequence of work shall invoice step-by-step jobs.
3. All possible hazard including proximity hazard shall be amended and persons shall be identified.
4. With the change of working conditions, the procedure shall be amended and persons shall be trained
5. Review on status of implementation shall be done though task observation
6. Before start of the job, induction shall be given to persons engaged at site by departmental representative and Contractor's Representative.
EHSMSM/WORKS/9203/9217 SAFE WORK PROCEDURE – CIVIL & STRUCTURAL WORK 65 of 58 | P a g e
(Performance Criteria - Perfection in job with no injury to persons or damage to property) or damage to property REV

1. DEPARTMENT : RMP-Joda (ENGG & PROJECTS-Tata Steel Ltd.) DOC. NO: SWP/PAR/FAP/Joda/01 DATE:

2. SECTION / LOCATION : Ferro Plant, Joda NAME OF WORKING AGENCY: M/s. PARVEEN CONSTRUCTION
3. JOB TITLE : Civil works for Effluent Treatment Plant WORK ORDER No: 3800016542/109

JOB DURATION : Start Date: 01/01/2021 End Date: 30/06/2021


Persons Responsible Condition of Tools / Reference to
Sl.
Activities (Sequence of Work) Hazard Safety Precautions Name & P. No. Tackles required OK/Not document/criteria and
No.
Ok remarks

TSL Representative Working agency Engineer


TATA STEEL M/s. PARVEEN CONSTRUCTION
Note: 1. This Safe Work Procedure shall be prepared by owner department countersigned by contractor's representative and safety department.
2. Sequence of work shall invoice step-by-step jobs.
3. All possible hazard including proximity hazard shall be amended and persons shall be identified.
4. With the change of working conditions, the procedure shall be amended and persons shall be trained
5. Review on status of implementation shall be done though task observation
6. Before start of the job, induction shall be given to persons engaged at site by departmental representative and Contractor's Representative.
EHSMSM/WORKS/9203/9217 SAFE WORK PROCEDURE – CIVIL & STRUCTURAL WORK 66 of 58 | P a g e
(Performance Criteria - Perfection in job with no injury to persons or damage to property) or damage to property REV

1. DEPARTMENT : RMP-Joda (ENGG & PROJECTS-Tata Steel Ltd.) DOC. NO: SWP/PAR/FAP/Joda/01 DATE:

2. SECTION / LOCATION : Ferro Plant, Joda NAME OF WORKING AGENCY: M/s. PARVEEN CONSTRUCTION
3. JOB TITLE : Civil works for Effluent Treatment Plant WORK ORDER No: 3800016542/109

JOB DURATION : Start Date: 01/01/2021 End Date: 30/06/2021


Persons Responsible Condition of Tools / Reference to
Sl.
Activities (Sequence of Work) Hazard Safety Precautions Name & P. No. Tackles required OK/Not document/criteria and
No.
Ok remarks

TSL Representative Working agency Engineer


TATA STEEL M/s. PARVEEN CONSTRUCTION
Note: 1. This Safe Work Procedure shall be prepared by owner department countersigned by contractor's representative and safety department.
2. Sequence of work shall invoice step-by-step jobs.
3. All possible hazard including proximity hazard shall be amended and persons shall be identified.
4. With the change of working conditions, the procedure shall be amended and persons shall be trained
5. Review on status of implementation shall be done though task observation
6. Before start of the job, induction shall be given to persons engaged at site by departmental representative and Contractor's Representative.
EHSMSM/WORKS/9203/9217 SAFE WORK PROCEDURE – CIVIL & STRUCTURAL WORK 67 of 58 | P a g e
(Performance Criteria - Perfection in job with no injury to persons or damage to property) or damage to property REV

1. DEPARTMENT : RMP-Joda (ENGG & PROJECTS-Tata Steel Ltd.) DOC. NO: SWP/PAR/FAP/Joda/01 DATE:

2. SECTION / LOCATION : Ferro Plant, Joda NAME OF WORKING AGENCY: M/s. PARVEEN CONSTRUCTION
3. JOB TITLE : Civil works for Effluent Treatment Plant WORK ORDER No: 3800016542/109

JOB DURATION : Start Date: 01/01/2021 End Date: 30/06/2021


Persons Responsible Condition of Tools / Reference to
Sl.
Activities (Sequence of Work) Hazard Safety Precautions Name & P. No. Tackles required OK/Not document/criteria and
No.
Ok remarks

TSL Representative Working agency Engineer


TATA STEEL M/s. PARVEEN CONSTRUCTION
Note: 1. This Safe Work Procedure shall be prepared by owner department countersigned by contractor's representative and safety department.
2. Sequence of work shall invoice step-by-step jobs.
3. All possible hazard including proximity hazard shall be amended and persons shall be identified.
4. With the change of working conditions, the procedure shall be amended and persons shall be trained
5. Review on status of implementation shall be done though task observation
6. Before start of the job, induction shall be given to persons engaged at site by departmental representative and Contractor's Representative.