Date : 18th MAY 2022 Will the work involve any of the activities below?(Circle any that apply)
If ‘YES’ a Permit must be obtained
Prepared By: JHA DEVELOPMENT TEAM
Hot work in Hazardous areas Confined space entry Excavation >/=1.2m
Company : E DESU
Inerting or Gas Freeing Work on Flammable Live Electrical Work
Retail Station Address: Gas Systems
Asbestos Work Explosive Blasting Other(specify):
JHA Reference No.: EDE/CSU/22 JHA Review No.: JHA REV 2.0 :18th MAY 2022
Predetermined JHA shall be verified and reviewed on site every day before performing the work
Description of work and number of days anticipated: REPLACE CSU AND LEADER BOARD
PREPARED BY: SAFETY EXEC -- MR. FIKRI HIDAYAT 18th MAY 2022
18th
MAY 2022 Shell Retail Permit to Work _ Version 5.1
RETAIL PERMIT TO WORK SYSTEM –JOB HAZARD ANALYSIS
18th
MAY 2022 Shell Retail Permit to Work _ Version 5.1
RETAIL PERMIT TO WORK SYSTEM –JOB HAZARD ANALYSIS
18th
MAY 2022 Shell Retail Permit to Work _ Version 5.1