1 Project Summary
2 Photo Report
3 Risk Register
4 Labour Report
5 EHS Report
FliPKART NON LARGE FC & MH ( KHEDA ) , GUJRAT
1 2-Aug-21 SP Closed Not using the PPES during STEPNEY fixing CAN CAUSE CUT AND SCRATCH L L Medium conduct training regarding proper use of PPPS and hazards of sharp edge 0f meterial. G SQUARE complied immediately
2 18-Jul-21 SKD Closed Poor housekeeping and unsafe material handeling. Fall of person, minor injury. H M LOW clear the unwanted meterials ,store with proper manner. G SQUARE complied immediately
CRAFTSMA
5 12-Jul-21 SP closed UNSAFELY REMOVING AND SHIFTING BARRICADE. fall of material, cut injury. L M low conduct training regarding proper use of PPPS and how to handles materials. complied immediately
N
CLIENT PROJECT MANAGEMENT CONSULTANCY
LABOUR REPORT
Project Status Report 01 Date: Mon, 26-Jul-21
POLITE ENTERPRISE
RIYA BUILDCON
CRAFTSMAN
G SQUARE
OPSIS
BMI
DATE TOTAL
1 Fall from Height Minor Injury Follow the safe work method Medium
2 Collapse of Scaffold Minor injury, Partial or Permanent disablement Scaffold propery inspect by compitent person before start the job Medium
3 Damage of Working Plateform Minor injury, Partial or Permanent disablement Follow the safe work method Medium
4 Inadequate Access Minor injury, Partial or Permanent disablement Provide proper access to reach the platform Medium
5 Trip Injury Minor injury, Major injury Good housekeeping required at work place Medium
6 Electric Shock Minor injury, Partial or Permanent disablement Installed Earth Leakage Circuit Breaker to main DB of 30 MA tripping value Medium
7 Injury while working with unguarded machinerery Minor injury, Major injury Provide guarded machinrries Medium
8 Chance of fire due to improper storage of raw material Material damage, minor injury Properly storage materials and display NO SMOKING sign Medium
9 Exposure to Welding Flash Eye Injury Do not visualise direct ARC welding, must use recomended face shiel/safety glass Medium
During
Up To Last
Sl No Discription
Week
Reporting During Reporting Period Cumulative Contractor is compliant to the EHS conduct at site, and
Period
minor observations observed during our audits have been
indicated to the Contracor for immediate closure
1 Incidents / Accidents in the reporting period 0 0 26/07/21 to 01/08/21 0