WEEKLY SAFETY REPORT

AHMEDABAD NON LARGE FC & MH ( KHEDA ) AHMEDABAD , GUJRAT - 387570

Report Date: 02 Aug 2021

Project Status Report - 001


CLIENT: CONSULTANT:

AHMEDABAD NON LARGE FC & MH ( KHEDA ) AHMEDABAD , GUJRAT - 387570


Contents

1 Project Summary

2 Photo Report

3 Risk Register

4 Labour Report

5 EHS Report
FliPKART NON LARGE FC & MH ( KHEDA ) , GUJRAT

RACKING AREA RACKING AREA HAND SANITISATION

MORNING TOOL BOX MEETING HOT WORK

THERMAL SCANNING WORK AT HEIGHT


RISK REGISTER
Project Name: AHMEDABAD NON LARGE FC & MH
HILLWAY LOGISTIC PARK ( KHEDA ) GUJRAT - 387570
Summary Description Preventative Actions
Likelihood Impact Prevent. Remarks/Risk Closing
ID Date Raised Raised By Status Description of Risk Description of Impact Risk Preventative Actions
(L/M/H) (L/M/H/C) Owners Remarks

1 2-Aug-21 SP Closed Not using the PPES during STEPNEY fixing CAN CAUSE CUT AND SCRATCH L L Medium conduct training regarding proper use of PPPS and hazards of sharp edge 0f meterial. G SQUARE complied immediately

2 18-Jul-21 SKD Closed Poor housekeeping and unsafe material handeling. Fall of person, minor injury. H M LOW clear the unwanted meterials ,store with proper manner. G SQUARE complied immediately

WORKMEN WORKING AT HEIGHT


3 18-Jul-21 SKD Closed IMPROPER USE OF SAFETY HARNESS M M High conduct tranning regarding proper use of safety harness while work on height. OPSIS complied immediately
MAY FALL.

CAN DAMAGE OTHER MATERIALS


CRAFTSMA
4 13-Jul-21 SP Closed MATERIAL SHIFTING IN IMPROPER WAY AND WORKERS WORKING H M Medium conduct training regarding proper use of PPPS and how to handles materials. complied immediately
N
AROUND.

CRAFTSMA
5 12-Jul-21 SP closed UNSAFELY REMOVING AND SHIFTING BARRICADE. fall of material, cut injury. L M low conduct training regarding proper use of PPPS and how to handles materials. complied immediately
N
CLIENT PROJECT MANAGEMENT CONSULTANCY

LABOUR REPORT
Project Status Report 01 Date: Mon, 26-Jul-21

POLITE ENTERPRISE
RIYA BUILDCON
CRAFTSMAN

G SQUARE
OPSIS

BMI
DATE TOTAL

26-Jul-21 117 73 3 34 4 16 247


27-Jul-21 105 70 13 35 5 18 246
28-Jul-21 106 71 12 34 5 18 246
29-Jul-21 100 71 17 34 5 18 245
30-Jul-21 100 67 17 36 5 17 242
31-Jul-21 100 79 17 37 4 17 254
01-Aug-21 86 71 23 37 4 16 237
714 502 102 247 32 120 1717
EHS REPORT

EHS RISK ANALYSIS

Sl No Critical / Risk Points Impact Mitigation Plan Risk Evalution

1 Fall from Height Minor Injury Follow the safe work method Medium

2 Collapse of Scaffold Minor injury, Partial or Permanent disablement Scaffold propery inspect by compitent person before start the job Medium

3 Damage of Working Plateform Minor injury, Partial or Permanent disablement Follow the safe work method Medium

4 Inadequate Access Minor injury, Partial or Permanent disablement Provide proper access to reach the platform Medium

5 Trip Injury Minor injury, Major injury Good housekeeping required at work place Medium

6 Electric Shock Minor injury, Partial or Permanent disablement Installed Earth Leakage Circuit Breaker to main DB of 30 MA tripping value Medium

7 Injury while working with unguarded machinerery Minor injury, Major injury Provide guarded machinrries Medium

8 Chance of fire due to improper storage of raw material Material damage, minor injury Properly storage materials and display NO SMOKING sign Medium

9 Exposure to Welding Flash Eye Injury Do not visualise direct ARC welding, must use recomended face shiel/safety glass Medium

EHS STATISTICS CONTRACTORS EHS PERFORMANCE

During
Up To Last
Sl No Discription
Week
Reporting During Reporting Period Cumulative Contractor is compliant to the EHS conduct at site, and
Period
minor observations observed during our audits have been
indicated to the Contracor for immediate closure
1 Incidents / Accidents in the reporting period 0 0 26/07/21 to 01/08/21 0

2 Safe Man-Hours 1,537 17,170 26/07/21 to 01/08/21 18,707

3 Number of First Aid Cases 0 0 26/07/21 to 01/08/21 0

4 Number of Tool Box Meeting Held 0 42 26/07/21 to 01/08/21 42

5 Number of Safety Training Program Held 0 1 26/07/21 to 01/08/21 1

6 Number of Emergency Evacuation Drills Held 0 1 26/07/21 to 01/08/21 1