TRA
ACTIVITIES: PTW Nos. : -
NOTE FROM SGPC HSE TEAM: Number:
1. Safety Helmet with chinstrap, Coveralls and Safety Shoes are compulsory at SITE. (as per
2. PTW shall be signed ONLY when all per-requisites mentioned in TRA complied with and verified by SGPC HSE Team.
TRA
Register)
SPECIFIC LOCATION: New Camp Construction Site (East Side) at SGPC DATE:
ACTIVITY/TASK Risk Evaluation FURTHER Actions TO BE TAKEN (if required) Residual Risk
S.NO. HAZARDS HAZARD EFFECT EXISTING CONTROLS ALAR
L S RISK PROPOSED CONTROLS & STATUS RESPONSIBILI L S RISK P
ACTIONS TY
1 -Ergonomically -Personnel injury 3 2 6 -Use PPE,S coverall, shoes, mask, -Visually Inspection of hand tools Close 2 2 4 Yes
Carpentry work Improper /faulty manual tools -Assets Damage Eye protection gogles, galves shall be carried out on daily basis
-Sharp Edges - Strict supervision of whole activity and damaged tools shall be
-Protruding nails - Safe manual Techniques shall be removed from sit
followed Watch your step - proper stacking of material
- Clear access and egress route
during after work