JOB HAZARD ANALYSIS - JHA JHA No:

ABG/JHA003
Rev: 01
Step TASK Issued: ___ /___/_____
POTENTIAL HAZARD REQUIRED HAZARD CONTROL RESPONSIBILITY
No.
For each hazard identified list the control measures required to eliminate
TASK TASK or minimize the risk of injury to
TASK: Lifting of cabins and containers LOCATION:
ALARP. SUPERVISOR:

1 ALL TASKS 1. Incident due to lack 1. WORKSITE


PPE to be alwaysHAZARDworn as a minimum.IDENTIFICATION PICW/EHS
Working at height (>1.2 m) Equip. moving, rotating parts Lightning discharge Hot surfaces Adverse weather conditions
of knowledge, Coverall, Safety helmet (max 3 yrs.), Safety footwear SB3 with toe-tector and midsole puncture
Dropped objects Using hand
experience or tools Hydrocarbon’s
protection. Safety eyewear leaks/spills Manual handling
(Dark glasses in direct sunlight), Gloves (cut resistant)
(pinch points) Snakes/spiders/scorpions
and mechanical
Confined space understanding
Use of knifes/sharp objects protection for riggers
Ignition source Loud steady noise (>85Dba) Biological hazard (COVID-19)
Excavation Gas/liquid under pressure 2. All workers, drivers and operators to have the correct
Fire / explosion training and certification for their task.
Vibration Simultaneous Ops (SIMOPS)
3. Procedures to be followed
Ground / slope stability Objects under tension Radiation work NEW ON Dust (including abrasive blasting, silica) Remote location (< supervision)
PTW

MENTOR
Slips, trips, and falls Electricity (low voltage) THE
Chemical (diesel / engine oils) HEREBY
OverexertionI CONFIRM THAT I HAVE READ, UNDERSTOOD,
Inadequate lightingAND WILL ADHERE TO
WAH
NAME TASK FUNCTION TASK? THE REQUIREMENTS TO THIS JHA TO PERFORM THE TASK SAFELY.
Overspeed (driving) Electricity (medium-high voltage) Lifting Plan Welding fumes Awkward posture Struck by objects or equipment
(< 30 days)
Transient vehicles Electrostatic energy Life Saving Rules.
Toxic materials (lead YES Heat stress
painting)
Nvehicle SIGNATURE Others_______________ PICW/EHS DATE
O
2 Movement of 1. Personal injury from 1. Check operator license before allowing onto site
1. vehicle/truck impact. Possible 2. Vehicles should be inspected when arriving at site (use vehicle inspection sheet to record) Vehicles
crushingWORKSITE HAZARD must be inCONTROLS
safe condition check, + REQUIRED DOCUMENTATION
lights, tires, mirrors, horn, reversing alarm and exhaust.
Work Permit 2. Support system/shoring
Property damage Equipment isolations (LOTO)
3. All Vehicle movements from entry to leaving sites shall Hot bework permit controlled.
banksman HSE induction training
2.
Scaffold check (tagging system) Journey Management Plan 4. Follow trafficPropermanagement plan
tool for the jobwhen implementedContinuous gas testing MOPO (Matrix of Permitted Operations)
3 Lifting with crane/truck 1. Failure of crane 1. ABG Lifting specialist to inspect all equipment when brought to site PICW/EHS
Scissor lift requirements Worksite Traffic Plan Housekeeping standards Temporary lighting
3. mounted HIAB hook/ Rigging 2. All lifting equipment and Accessories are subject to statutory Load test being carried out & COVID-19 certified. Management Plan
Lifting Supervisor /
Lifting Plan 2. Overloading
Work Method Statement Visual inspection before
Rigging use. If site based, confirm correct
assessment Adequate colour code
air ventilation Fatigue Management Manager Plan
4. 3. Ground collapse 3. Check ground condition on route and at location. Ensure adequate distance from excavations etc.
Dropped objects inspection Inspect tools / equipment Safetysupports
Data Sheet (SDS) Secondary containment Buddy system
4. Pinch points. 4. Prepare laydown before starting lift
5. Barrier & warning signs 5. FallBody
frompositioning
height (line of 5. fire) Barrier to be erected around the
Ignition source controls area and unauthorized persons to
Weather monitoring remain outside. Gas testing
6. Being hit by loose or 6. Check for and remove any loose objects. (Dropped objects)
Maintain 3-point contact Pressure
falling loads.control / relief7.valveAttach rigging Non-sparking
using a ladder toolto access high lifting points.
Ground wetting
Chains can be pulled to lugs using Others: ______________
tag lines.
6. (Dropped objects) Use a harness and retractable lifeline.
RECOVERY MEASURES (PPE & SAFETY EQUIPMENTS)
8. Ensure no one is below the suspended load at all times of the operation and no part of the body in the
Basic worksite PPE Rubber/chemical gloves Harness lanyard w/ Shock Absorber Lock Out / Tag Out Devices Access and egress plans
7. firing line
Safety glasses + face shield Cotton gloves 9. Refer to lifting plan for lifeline
Horizontal specific details Chemical apron Spill kit
8. 10. Check to ensure cabin or container is empty or that contents have been assessed within the lifting plan
Chemical splash goggles Heat resistant gloves Self-retracting lifeline Tyvek suit / chemical suit
Others: ______________
Double hearing protection Dust mask Hard safety barricade Eyewash / emergency shower
9. Others: ______________
Coveralls (antistatic/flame retardant) Respirator mask (cartridge) Caution tape Fire Fighting / ERT standby
Others: ______________
10. High visible vests SCBA mask Fire extinguisher First aid kit
Others: ______________
Heavy duty gloves Safety harness (> 1.2m) Fire blankets Radio communication Others: ______________
11.

TASK SUPERVISOR CONSTRUCTION MANAGER SITE HSE MANAGER


12.

13. Name& Signature Name& Signature Name& Signature

Page 1
14.

15.

Page 2