ACTIVITY: CABLE PULLING, CABLE HARNESSING, TESTING PROJECT LEAD: ROLLIE JAVIER
(SAT) OF TRANSFORMER and SWITCHGEAR
WORKERS:
NORUDIN RAZUL, BADJUNAID CAUNDA, RICHARD FRANCISO, ASHANTI GANDAWALI, ABUBAKAR ALI, JONATHAN RAZUL, MARK LACADIN,
ANGELO CAUNDA
(List the tasks required to (Against each task list (List the control measures required (Write the name of the
(Indicate if Elimination,
perform the activity in the hazards that could (List the effects or impacts of the to eliminate or minimize the risk of person responsible to
Substitution, Engineering,
the sequence they are case injury when the hazards you have identified) injury arising from the identified implement the control
Administrative, PPE)
carried out) task is performed) hazard) measure identified)
Sickness
Prior to work execution,
Must practice social distancing
Supervisor/Safety
when doing Inspection of PPE &
Officer shall if COVID LEO TABITA/ROD
Worst Case Death all PPE req. Wear surgical Mask & ADMINISTRATIVE
check if proper PPE's are ADORABLE
Face shield
completely worn.
PREPARED BY:
ROD ADORABLE
ICC SITE SAFETY OFFICER 2