Professional Documents
Culture Documents
Rev: 01
ABG/JHA018
Issued:
TASK TASK
TASK: roofs installation
LOCATION:BH GYM SUPERVISOR:wissam
☐ Scaffold check (tagging system) ☐ Journey Management Plan ☒ Proper tool for the job ☐ Continuous gas testing ☐ MOPO (Matrix of Permitted Operations)
☐ Scissor lift requirements ☐ Worksite Traffic Plan ☒ Housekeeping standards ☐ Temporary lighting ☒ COVID-19 Management Plan
☐ Lifting Plan ☐ Work Method Statement ☐ Rigging assessment ☐ Adequate air ventilation ☐ Fatigue Management Plan
☐ Dropped objects inspection ☒ Inspect tools / equipment ☐ Safety Data Sheet (SDS) ☐ Secondary containment ☐ Buddy system
☒ Barrier & warning signs ☒ Body positioning (line of fire) ☐ Ignition source controls ☐ Weather monitoring ☐ Gas testing
☒ Maintain 3-point contact ☐ Pressure control / relief valve ☐ Non-sparking tool ☐ Ground wetting ☐ Others: ______________
☒ Safety glasses + face shield ☐ Cotton gloves ☐ Horizontal lifeline ☐ Chemical apron ☐ Spill kit
☐ Chemical splash goggles ☐ Heat resistant gloves ☐ Self-retracting lifeline ☐ Tyvek suit / chemical suit
☐ Others: ______________
☐ Double hearing protection ☒ Dust mask ☐ Hard safety barricade ☐ Eyewash / emergency shower
☐ Others: ______________
☒ Coveralls (antistatic/flame retardant) ☐ Respirator mask (cartridge) ☒ Caution tape ☐ Fire Fighting / ERT standby
☐ Others: ______________
☐ High visible vests ☐ SCBA mask ☒ Fire extinguisher ☐ First aid kit
☐ Others: ______________
☐ Heavy duty gloves ☐ Safety harness (> 1.2m) ☐ Fire blankets ☐ Radio communication ☐ Others: ______________
Page 1
POTENTIAL RESPONSIBILITY
# JOB STEP CONTROL MEASURES / HAZARD CONTROLS
HAZARD
1. Incident due to lack of 1. Perform Toolbox talk – discuss this JHA and task specific requirements. All people PICW/EHS
knowledge, experience including housekeeping team are to attend and sign attendance sheet.
or understanding
الحادث بسبب نقص الخبره 2. Correct PPE checked before starting work. Hard Hat, safety glasses or goggles, ear
protection for when using power saw/tools or within 3mtrs, SB3 boots (must have
او المعرفه او الفهم
puncture proof sole and toe-tector) coverall, cut and puncture resistant gloves
3. Check training and experience is valid for the task
Task Planning +
4. Check power and hand tools and equipment before use. (Condition and color
Pre-start task coding as required)
1
تنفيذ المهام مهمه ماقبل Procedures
العمل PTW
JHA
Page 2
PICW/EHS
1. Power tools inspection before using(color code tags).
فحص االدوات قبل االستعمال استخدام ورقة الفحص
1. Person injury. 2. Unplug socket before changing saw disk or drill bit.
اصابات جسديه افصل المقبس قبل تغيير قرص المنشار او لقمة الحفر
2. Equipment 3. Skilled and authorized persons to deal with power tools.
failure. االشخاص المهره المصرح لهم بالتعامل مع االدوات الكهربائيه
Using power tools
3 3. تلف الماكنات
اسخدام االدوات الكهربائيه 4. Proper PPE to be worn while using power tools.
4. Flying objects
االشياء المتساقطه ارتداء معدات الوقايه الشخصيه المناسبه اثناء استخدام عدد الكهرباء
5. Dust. 5. Always use drills with anti-rotation system.
الغبار استخدام المثاقب بنظام مضاد للدوران
6. Ensure gaurds are installed for the power tools.
7. تاكد من تثبيت ادوات التحكم الدوات الطاقه
Using scaffolding. 3. Scaffolding collapsing; If possible, use a hi-ranger or genie boom instead. Verify that scaffolding is properly
استعمال السقاالت slipping/falling from assembled and wheels locked. Use safety rails properly. Verify a safe means of climbing
scaffolding. on/off scaffolding.
االنزالق السقوط/ إنهيار السقاالت تحقق من أن السقاالت. بدال ًمن ذلكgenie boom أوhi-ranger استخدم، إذا كان ذلك ممكنًا
من السقاالت
تحقق من وجود. استخدم قضبان األمان بشكل صحيح.مجمعة بشكل صحيح وأن العجالت مقفولة
. إيقاف السقاالت/ وسيلة آمنة لتسلق
5
Page 3
Working on roofs. Injuries from material Using proper PPE
العمل على السقف handling ارتداء معدات الوقاية الشخصية
Falls from heights Install anchor points
االصابات من تداول المواد تثبيت نقاط الربط
والسقوط من المرتفعات
Using self retracting lanyard
Life line
استخدام حبل التراجع الداتي خط الحياة
• Cover use of ladder safety extensions
6 • تغطية اسخدام امتدادات سالمة السلم
• Not carrying items while ascending and descending
• عدم حمل االشياء اثناء الصعود والنزول
• Proper way to climb
• الطريقة الصحيحة للتسلق
• Changes in rungs
• التغيرات في الدرجات
Proper anchoring
Proper harness and fall protection system to be used
التثبيت المناسب واستخدام نظام الحماية من السقوط والحزام المناسب
PICW/EHS
Page 4
WORK TEAM SIGN ON / JHA no:
NEW ON M
THE E HEREBY I CONFIRM THAT I HAVE READ, UNDERSTOOD, AND WILL ADHERE
N TO THE REQUIREMENTS TO THIS JHA TO PERFORM THE TASK SAFELY.
NAME TASK FUNCTION TASK?
T
(< 30 days)
O
YES NO R SIGNATURE DATE
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
Page 5