You are on page 1of 1

KEY PLAN:

R O A D R O A D

DRAIN PIPE DOWN TO FIRST FLOOR T(3) T(3) T(3) T(3) T(3) T(3) T(3) T(3) T(3) T(3) T(3) T(3) T(3)

R O A D
SOFFIT LEVEL

T545
T551

T543

T541
T544
T553

T547
T552

T546

T542
DRAIN PIPE DOWN TO FIRST FLOOR

T549
T550

T548
PLOT LIMIT PLOT LIMIT

SOFFIT LEVEL

12
61
240 352 351 350 349 348 347 346 345 344 343 342 341 340 339 338 337 336 335 334 333 332 331 330 329 328 327 326 325 324 323 322 321 320 319 318

BUILDING

11
62
LINE ABOVE

10
63
60 59 58 57 56 55 54 53 52 51 50 49 48 47 46 45 44 43 42 41 40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13

S\S

9
6
EXIT

R O A D
METAL

GLASS

PAPER
8
PLASTIC

64 65 66 67 68 69 70 71 72 73 101 100 99 98 97 96 95 94 93 92 91 90 89 88 87 86 85 84

4
3
UP
102

47
UP
7

103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122

83

2
UP
123

82

1
81

57
BUILDING
LINE ABOVE BUILDING BUILDING
LINE ABOVE LINE ABOVE

67

ENTRANCE
77

5 91
128
141 140 139 138 137 136 135 134 133 132 131 130 129 127 126 125 124

87
6500
1B

80

49 1

1''

2 61

8 22
79

EXIT
WA
LIN TER

3 91

1 61
E BEL TAN
196 OW K

36 1

72 2
14
2 2''

143

4 61

6 22
1A
BUI

06 1
192 LIN LDI 144
E AB NG 1000

1B
x100 S.S.L
OV WATE 0
TOP (TOP
191 E
145 R TANK HATC OF
-1.93
RAFT5

561

522

922
ACC H FOR
UP
ESS )

9 51
19 146
0 1''

WA 317
LIN TER

661

422

032
147 E BEL TAN
197 189
OW K

851
188 14
198 8

76 1

32 2

13 2
187 149
199

751
1A

EX

2''
IT
150 1000
x100
186

A
200 WATE 0
TOP
R TANK 316

861

222

232
HATC
151 ACC H FOR

D
185 ESS

EN
201

TR
269

AN
152 6

CE
184 15
202

12 2

33 2
268
15
3

5
15
183
203
267
182 4

4 32
20 15

300X300mm SS ANTI VORTEX MAIN


266 4
181 BUI 9
205 16

0
LIN LDI

27
26
5 E AB NG UP
OV

315
180 0

3-STEP LADDER
20 E
6 17
264
207 179 1
263 17

314
1
178

0
27
208

22
DRAIN

Pa
262

2 9
209 17 21
7 17
261

313
rk
21 176 8
0 21

27

3
260

17
2
211 175

in

312
259 4

27
17

3
7
21

g
212

5
23
258

27
4

311
213

6
UP
257

21
6
23

27
21

5
256 4 5
21 7

310
23

27
6
255

8
23
27

309
7 254

N
253 23

27
METAL

8
GLASS

30
PAPER

PLASTIC

252

IO

27
9
1

7
251 24

30
28
CT

0
356 250
2

6
24

30
28
249

D
355
3
24 5
30

RE
248

28

A
354

4
24
247 4
28 30

O
353
3

DI
BUI 3

R
246
28 LIN LDI 5 30
4 E AB NG 24
OV
285 E 302

DEEP END
286 301

LA
287 300

288 299
289

IB
298
290 297
291 296
292 293 294 295

Pa
rk
ABS SKIMMERS REG. MOUTH FOR

i ng
g

CONCRETE SQUARE 01 B.L.P +8.50 SS INLET FITTING PLOT LIMIT

Pa
rk
in

S.S.L +8.35
35W LED U/W LIGHT
35W LED U/W LIGHT
LEGENDS FOR SWIMMING POOL & KID'S POOL
QTY.
LEGEND DESCRIPTION

SWIMMING POOL WATER LEVEL REGULATOR 4

1350 mm DEEP
ABS SKIMMERS REG. MOUTH FOR

10000
SS INLET FITTING DECK BOX 4
CONCRETE SQUARE 02

10W LED U/W LIGHT 2

ABS SKIMMER 4

35W LED U/W LIGHT


10W LED U/W LIGHT
STAINLESS STEEL WALL INLET 4
FITTING
VACUUM LINE FROM POOL TO FILTER PUMP VACUUM LINE FROM POOL TO FILTER
PUMP
STAINLESS STEEL VACUUM 2
FITTING
ABS SKIMMERS REG. MOUTH FOR
CONCRETE SQUARE 03 SS INLET FITTING
35W LED U/W LIGHT 4
SHALLOW END
F.F.L +9.85 4
300X300mm SS ANTI VORTEX
1.2M GLASS FENCE B.L.P +8.95 F.F.L +9.55 DRAIN

S.S.L +8.80 1
3-STEP LADDER

4550
2"Ø UPVC PIPE CLASS E

500
CONDUIT CABLE
WATER LEVEL REGULATOR

KIDS SWIMMING POOL


400 mm DEEP

3500
35W LED U/W LIGHT
10W LED U/W LIGHT

B.L.P +9.45
S.S.LREG.
ABS SKIMMERS +9.30
MOUTH FOR
CONCRETE SQUARE 04 300X300mm SS ANTI VORTEX MAIN
SS INLET FITTING

REVISED AS PER COMMENTS


DRAIN 01 08-12-2023 AM NR TB
6511 00 ISSUED FOR APPROVAL 04-11-2023 AM NR TB

No. Explanatory Note Date Dra Chk Apr


DRAIN PIPE DOWN TO FIRST FLOOR
SOFFIT LEVEL
CLIENT :
DRAIN PIPE DOWN TO FIRST FLOOR
SOFFIT LEVEL
VACUUM PIPE DOWN TO FIRST FLOOR AL HAMRA REAL ESTATE
15600 RAS AL KHAIMAH, UAE
SOFFIT LEVEL

PROJECT :

PROPOSED MARINA RESIDENCES PHASE-3


(G+1st GYM+2nd SWIMMING POOL+6 TYP FLOORS)
ABS SKIMMER PIPE DOWN TO FIRST CONDUIT CABLE DOWN TO FIRST FLOOR LOCATION: ISLAND OF AL HAMRA
FLOOR SOFFIT LEVEL SOFFIT LEVEL RAK_ID NO: 602015036

PROJECT MANAGERS: CONSULTANT :


SS INLET PIPE DOWN TO FIRST FLOOR
SOFFIT LEVEL P.O.Box 128456, Dubai, U.A.E, ARCHITECTS | ENGINEERS |
PROJECT MANAGERS
T: +971 4 3209646,
F: +971 4 3266624, P.O.Box 26369,Dubai, U.A.E,
E: info@project-cenQ.N.al.com T: +971 4 3266625,
W: www.project-cenQ.N.al.com F: +971 4 3266624,
E: info@modeleng.ae W:
ENGINEERING CONSULTANTS
www.modeleng.ae

125 mm EXPANSION MAIN CONTRACTOR :


JOINT
INTERNATIONAL
CONTRACTING LLC
. 8 5 Diligence is what we believe...

+9 55
F. L +9.
F. F.L SUB CONTRACTOR :
F.
13

GW 5
50

Premier Irrigation and Landscaping LLC


0 #4
DN
P.O.BOX:233610, DUBAI, U.A.E.,

00 AIR 0 TEL:04 2808995, FAX:04 2808996


www.ptsgroups.org

41 S T 70
2
00 DRAWING TITLE :
UP 12
25

GW 4
20
50

0 FLOOR PLAN
50

03 SECOND SECOND FLOOR PIPE LAYOUT


A-102 SCALE - 1:250
Drawn Checked Approved
85

AM NR TB Size
50

58

00
13

UP

36 .
70

Date Scale Project No.


AT QM
50
35

L A1
50

F -
K .11 S
08-12-2023 -

B H Drawing No. Rev.


UM 2- 119
02
60

N GBH-PR-003 01
MI TAIL A
0

E 2
U
AL E AR
H RD

You might also like