PARSONS

BRINCKERHOFF
PIER LENGTH
P26
P25
P24
P23
P22
P21
P20
P19
P18
P17
P16
P15
P14
P13
P12
P11
P10
ABUTMENT
EXISTING
EXIS.
PILE
(from Existing
NO.
TO TOP
P9
P8
P7
P6
P5
P4
P3
P2
P1

ระยะอมหั
PIER
TYPE
166.482
166.249
166.127
166.121
166.151
166.995
166.037
165.928
166.213
166.108
165.823
165.821
166.409
166.073
165.768
165.851
165.651
165.897
166.036
165.892
166.071
166.242
166.337
166.339
166.391
166.754
TOP
1.361
1.128
1.006
1.030
1.109
1.285
1.180
1.002
1.336
1.117
1.005
1.144
1.179
1.095
1.097
1.149
165.121
165.995
164.928
164.821
165.073
164.651
164.892
165.242
165.754
DEPTH
2.000
1.800
0.100
LEVEL
Bored
163.421
164.295
163.228
163.121
162.921
163.173
162.951
163.192
163.542
164.654
1.500
1.200
1.000
PILE
46.500
28.500
19.500
ELEV.
137.982
137.749
119.627
119.621
119.651
120.495
119.537
119.428
119.713
119.608
119.323
119.321
119.909
119.573
119.268
119.351
119.151
119.397
119.536
119.392
119.571
119.742
137.837
137.839
137.891
147.254
GROUND
(m.)
TYPE
GL.)
(m)
OF
OF
CAP
CUT
TIPAวเสาเข็
TYPE
C
B
A
Pile
(m.)
(m.)Dia. ม
(m.)
OFF
(m.)

THE CONSTRUCTION OF TRACK DOUBLING PROJECT


บริษัท เอ็ม เอ เอ คอนซัลแตนท์ จำกัด
FOR TRANSPORTATION AND LOGISTICS
(SECTION : CHIRA JUNCTION - KHON KAEN)
PARSONS
BRINCKERHOFF
บริษัท พีบี เอเชีย จำกัด

บริษัท เอเชี่ยน เอ็นจิเนียริ่ง คอนซัลแต้นส์ จำกัด


CKCH JOINT VENTURE
THE CONSTRUCTION OF TRACK DOUBLING PROJECT
บริษัท เอ็ม เอ เอ คอนซัลแตนท์ จำกัด
FOR TRANSPORTATION AND LOGISTICS
(SECTION : CHIRA JUNCTION - KHON KAEN)
PARSONS
BRINCKERHOFF
บริษัท พีบี เอเชีย จำกัด

บริษัท เอเชี่ยน เอ็นจิเนียริ่ง คอนซัลแต้นส์ จำกัด


CKCH JOINT VENTURE
THE CONSTRUCTION OF TRACK DOUBLING PROJECT
บริษัท เอ็ม เอ เอ คอนซัลแตนท์ จำกัด
FOR TRANSPORTATION AND LOGISTICS
(SECTION : CHIRA JUNCTION - KHON KAEN)
PARSONS
BRINCKERHOFF
บริษัท พีบี เอเชีย จำกัด

บริษัท เอเชี่ยน เอ็นจิเนียริ่ง คอนซัลแต้นส์ จำกัด


CKCH JOINT VENTURE