International Site Preparation Data Guide (6 pages)

8KVA:
SYMINIFI

16KVA:
SYMSTRFI
Site Preparation

Preparation for the SymmetraTM


the installation site. A ramp is shipped with the frame,
and is used to roll the frame from the pallet onto the
n The SymmetraTM pallets must be moved to the in- floor. (The frame is equipped with casters.) The il-
stallation site using a pallet jack. lustration below details the procedure for unpacking
n The installation site must meet specific environ- the SymmetraTM frame from the custom pallet. These
mental and structural requirements. steps are as follows:
n The SymmetraTM must be hardwired. Wiring for
the system includes input wiring from the build- 1. Remove the grill covers from the SymmetraTM
ing service to the SymmetraTM, output wiring from frame.
the SymmetraTM to the load equipment, and the 2. Position the ramp onto the pallet - insert the po-
installation of an optional remote emergency sitioning bolt on the ramp into the hole on the
power off (REPO) switch. All electrical connec- pallet.
tions must be made by a certified electrician. 3. Loosen the two pallet restraint brackets at the
rear of the frame.
4. Remove the pallet restraint beam at the front of
Unpacking the frame.
5. Two people roll the frame onto the floor.
The SymmetraTM will arrive at the loading dock bolted
to a custom pallet. (Battery and power modules are
stacked on an additional pallet.) A pallet jack must
be used to position these pallets as near as possible to

International Models Page 2


Weight Considerations Operating Conditions

Structural/Environmental Requirements
The weight of the SymmetraTM rests on four 3.8cm Install in a temperature controlled, clean, dry, and pro-
(1.5") diameter leveling feet. Make sure the installa- tected indoor area that is free of conductive contami-
tion site is structurally sound. nants. The atmosphere must be free of dust and cor-
Note: Weights shown are for empty frames and frames rosive fumes, and with adequate airflow.
fully loaded with modules.
Environmental Conditions:
D i m e n si on s n Relative Humidity: 0 to 95%, non-condensing.
S y m m et r aTM Wei g h t
C om pon e n t kg (lb)
W x D x H cm n Temperature: 0°C to 40°C (32°F to 104°F).
(inc hes) n Elevation: 0m to 3,048m (0ft to 10,000ft).
SYMINIFI 82kg n Electro-Static Discharge (ESD) Susceptibility:
(No Modules) (180lb) 61 x 71 x 86.4 System components are capable of withstanding
(24" x 28" x 34" ) “through air” electrostatic discharges up to an am-
SYMINIFI 155kg
plitude of +/-15kV and “direct discharge” elec-
(With Modules) (340lb)
trostatic discharges up to an amplitude of +/-8kV
SYMSTRFI 155kg without failure, abnormal operation, or degrada-
(No Modules) (340lb) 61 x 71 x 122 tion in performance. ESD test methods conform
SYMSTRFI 343kg (24" x 28" x 48" ) to IEC 801-2.
(With Modules) (755lb)
SY X R 4 145kg 61 x 71 x 43 BTU Output
(With Modules) (318lb) (24" x 28" x 17" )
Refer to the table for BTU output of a fully loaded
S Y X R 12 423kg 61 x 71 x 122
(With Modules) (930lb) (24" x 28" x 48" )
SymmetraTM . The BTU output is significantly higher
while the batteries are charging. Under normal oper-
SYBATT 28kg 22.9 x 50.8 x 15.2 ating conditions, battery recharge periods are rela-
(Battery Module) (60lb) (9" x 20" x 6" ) tively infrequent.
SY PM 16kg 25.4 x 50.8 x 15.2
(Power Module) (35lb) (10" x 20" x 6" )
B T U/H r
B T U/H r ( ba t t e r i e s
Space Considerations F r am e
S i ze
( ba t t e r i e s
fully
c h ar g i n g , f u l l
f r a m e c a p a c i t y,
Allow 30.5cm (12") of clearance behind the frame c h ar g ed ) N +1 m od u l e
for adequate airflow, and 122cm (48") of clearance c on f i g u r a t i on )
in the front of the Symmetra TM to access the
PowerView interface and to install power and battery SYMINIFI 2,321 7,578
modules.
SYMSTRFI 4,642 13,456

Storage of Modules
The battery modules must be temporarily stored until
the frame is permanently installed. To preserve bat-
tery life, always store batteries in a cool, dry place.
Note: Installing battery modules in a SymmetraTM that
is not powered will discharge the batteries and could
damage them permanently. Do not install battery
modules into the SymmetraTM frame until the system
is connected to input power.

International Models Page 3


SymmetraTM Wiring Output Wiring

Wiring Preparation
n All power and control wiring must be in- n Single phase power is distributed to load equip-
stalled by a qualified electrician and must ment via hardwired connections and by plugging
comply with applicable local and country the load equipment into the convenience power
codes. panel at the rear of the frame.
n Use flexible metal conduit for ease of ser- n With the PowerView user interface, the Power
vice and maintenance of the system. Array can be configured to deliver either 220V,
230V, or 240V.

Input Wiring SYMINIFI Output Wiring:


n Maximum Output
n Single phase 220V, 230V, or 240V, 50Hz or 60Hz Per Conductor ......................... 40 Amp
incoming AC mains (utility) power source. n Output Overcurrent
n Incoming power is wired directly to a terminal Protection (External) .............. 50 Amp (2-pole)
block inside the Power Array. n Minimum Output
n A dedicated power feed, within flexible metal Wire Gauge .............................. 10mm2 (#8 AWG)
conduit is recommended.
SYMSTRFI Output Wiring:
SYMINIFI Input Wiring:
n Maximum Output
n Input Full Load Amperage ...... 35 Amp Per Conductor ......................... 80 Amp
n Input Overcurrent n Output Overcurrent
Protection (External) .............. 50 Amp Protection (External) .............. 90 Amp (2-pole)
n Minimum Input n Minimum Output
Wire Gauge .............................. 10mm2 (#8 AWG) Wire Gauge .............................. 25mm2 (#3 AWG)
SYMSTRFI Input Wiring:
SYMINIFI & SYMSTRFI Power Panel:
n Input Full Load Amperage ...... 70 Amp n 8 (eight) IEC 320 C13 receptacles
n Input Overcurrent
Protection (External) .............. 100 Amp
n Minimum Input REPO Switch Wiring
Wire Gauge .............................. 25mm2 (#3 AWG)
The SymmetraTM Power Array can be connected to
either a dry contact or a 24Vdc remote emergency
power off (REPO) switch. The wiring terminal con-
nections for the REPO are physically isolated from
the primary circuitry of the Power Array.
REPO Cable Specifications
Use one of the following cable types to connect the
SymmetraTM to the REPO switch:
CL2 - Class 2 cable for general purpose use; or
CL2P - Plenum cable for use in ducts, plenums, and
other space used for environmental air; or
CL2R - Riser cable for use in a vertical run in a shaft
or from floor to floor; or
CL2X - Limited Use cable for use in dwellings and
for use in raceway.
For installation in Canada, the cable should be CSA
Certified, type ELC (Extra-Low-Voltage Control
Cable).

International Models Page 4


IMPORTANT!: Read chapter 4 of the Symmetra User’s Manual!

Wiring Overview - SYMINIFI & SYMSTRFI


REPO Wiring Utility (Mains)
Remote Emergency Power Off Switch Power Source

Single Phase
Output Power to
Load Equipment

220V,
230V,
or 240V

Output Input
L1 Wire Ground

Output
Neutral Input
L1

Output
Ground

Input
Neutral

Output Wiring
(Single Phase) Input Wiring (Single Phase)

International Models Page 5


SymmetraTM Site Preparation Checklist

Site Preparation Checklist


Purchase of System:
q 1. Determined the load (datacenter) power requirements.
q 2. Determined minimum run time requirements for existing and future loads.
q 3. Evaluated additional run time available with XR Extended Run frame(s).
q 4. Purchased a SymmetraTM Power Array system that will meet minimum requirements.
q 5. Purchased at least one redundant power module.
q 6. Evaluated and selected a service plan.
q 7. Notified building and maintenance departments that SymmetraTM will be arriving.

Site Preparation:
q 1. Determined where the SymmetraTM Power Array will be installed.
q 2. Floor is structurally sound to support a fully loaded SymmetraTM frame and additional XR frames.
(See table - page 3.)
q 3. Installation site meets minimum environmental requirements.
q 4. Installation site cooling system can support the additional heat output of the SymmetraTM.

Electrical Preparation:
q 1. Required input voltage is available.
q 2. Determined all output wiring configurations to be installed.
q 3. Scheduled an electrician to install the SymmetraTM Power Array.
q 4. Delivered a copy of this document to the electrician. (Important.)
q 5. Made electrician aware of the electrician’s checklist in chapter 4 of the User’s Manual.

International Models Page 6