RENCANA ANGGARAN BIAYA

PEKERJAAN INTERIOR
2023

HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME SATUAN SATUAN HARGA
(Rp.) (Rp.)
1 2 3 4 5 6
I PEKERJAAN PERSIAPAN
1 Demobilisasi & Mobilisasi 1.00 Ls 2,000,000.00 2,000,000.00
Sub Jumlah 2,000,000.00
II PEKERJAAN KITCHEN SET
1 Kitchen Set Fin. HPL 4.10 m2 2,200,000.00 9,020,000.00
2 Top Table Kitchen Solid Surface 2.79 m2 1,550,000.00 4,324,500.00
3 Pek. Pasang Backsplash Cermin 1.00 m2 440,000.00 440,000.00
4 Pek. Pasang Plin Top Table Kitchen 3.00 m1 128,000.00 384,000.00
5 Pek. Pasang Kitchen Sink 1.00 unit 1,330,000.00 1,330,000.00
6 Aksesoris 0.50 m2 1,100,000.00 550,000.00
Sub Jumlah 16,048,500.00
II PEKERJAAN BACKDROP TV
1 Pek. Pasang Backdrop TV Multiplek 9 mm + 3 mm Fin. HPL 3.50 m2 1,330,000.00 4,655,000.00
2 Pek. Pasang Cermin Bevel 2.96 m2 985,000.00 2,915,600.00
3 Pek. Pasang Wall Moulding 30.00 m2 300,000.00 9,000,000.00
2 Pek. Pasang TV Cabinet 1.00 unit 1,550,000.00 1,550,000.00
Sub Jumlah 18,120,600.00
Sub Jumlah Total 36,169,100.00