EF24-0033 (B) - 233168 Design Certificate - Jumpform 240119
280 Bilsen Rd
Geebung QLD 4034
P: 02 9780 6500
F: 02 97806499
www.acrow.com.au
Date 19/01/24
Job No 233168
Acrow Formwork & Scaffolding have undertaken the design and certification of the core jumpform system for the above
noted structure and project. The design has been documented on the following Acrow Formwork & Scaffolding design
drawings;
2.0 Certification
We hereby certify that the designs described by the above noted drawings generally comply with the relevant provisions
of the following Australian Standards (subject to the items listed in Section 3.0);
AS/NZS 1170.0:2002 Structural design actions Part 0: General Principles
AS/NZS 1170.2:2021 Structural design actions Part 2: Wind Actions
AS/NZS 1720.1-2010 Timber structures Part 1: Design methods
AS 3610:1995 Formwork for concrete
AS 3610.1-2018 Formwork for concrete Part 1: Specifications
AS 4100:2020 Steel structures
AS 6669:2016 Plywood - Formwork
The design checks carried out have been undertaken using the technical data sheets, guides and manuals for the
proprietary items published by Acrow Formwork & Scaffolding.
www.acrow.com.au
All formwork shall be inspected by a competent person/engineer in accordance with the relevant Formwork
Code of Practice. Variation in design may be permitted in isolated areas providing design criteria is achieved
and verified by an engineer;
It is not possible to convey every single piece of information on any formwork drawing. It is the responsibility
of trained and competent formworker’s to read the design drawings, relevant manufacturer technical manuals
and use their own expertise to fill any gaps in information. If in doubt – ask;
The formwork shall be monitored prior to and during the concrete placement and adjusted as necessary.
Additional bracing or anchoring shall be installed in deemed necessary;
Maximum wind speed during the jumping process & operation = 16m/s (57.6 km/hr);
Stacked materials shall be removed & shutters shall be secured to the jump during the jumping process;
No point loading on the ply allowed in between joist location (ie. Install dunnage over top of joists);
Monitor loadings to ensure they do not exceed design loadings. Platforms shall be evenly loaded;
Concrete shall be placed in even layers within vertical formwork not exceeding 400mm thickness;
Refer to drawings for specific arrangement and design notes;
Note that this certification is for the structural capacity only – it does not check dimensions or set-out accuracy;
and
This certification is for the nominated structure and project only.
The jumpform design allows for the installation of the concrete placing boom based on the details and loads provided
by the Contractor’s consulting engineer. Acrow have relied upon these loads and have not undertaken independent
verification. The concrete placing boom loads were provided on the following drawings by O’Hearn Consulting;
23301-S01(B)
23301-S02(B)
23301-S03(B)
This certificate is limited to the compliance of the structural integrity for the above-mentioned items only. Acrow
Formwork & Scaffolding accepts no responsibility for information that has not been expressly identified as part of this
advice. This certificate can only be relied upon by the addressee and cannot be used or adopted by any third -party.
This certificate does not relieve the contractor of their obligations to comply with all relevant standards, codes of
practice and statutory requirements.
Whilst this certificate addresses the structural capacity of the above arrangement in its final erected state, it does not
relieve the contractor or any other party of their responsibility of ensuring that all equipment used is in a good state of
repair in accordance with the manufacturer’s specification, meets the minimum requirements of the current code and
the design notes as well as any local regulations for its intended use. Safe work method statements for installation of
the formwork are the responsibility of the contractor.
This certificate shall not be construed as relieving any other party of their responsibilities, liabilities, or contractual
obligations, and does not constitute an inspection certificate.
Should you require any additional information please do not hesitate to call the undersigned on 0438 382 013.
ABN 35 004 284 806
280 Bilsen Rd
Geebung QLD 4034
P: 02 9780 6500
F: 02 97806499
www.acrow.com.au
www.acrow.com.au
Attachment A
Acrow Formwork & Scaffolding
www.acrow.com.au
280 Bilsen Rd
Geebung QLD 4034
Current Revision
15/08/2023
23/08/2023
25/08/2023
20/09/2023
27/09/2023
29/09/2023
11/10/2023
12/10/2023
10/11/2023
13/11/2023
24/11/2023
20/12/2023
3/08/2023
1/09/2023
6/10/2023
6/11/2023
8/11/2023
9/11/2023
Drawing no. Drawing title
233168-01 General Title Sheet A B C C
280 Bilsen Rd
Geebung QLD 4034
Current Revision
15/08/2023
23/08/2023
25/08/2023
20/09/2023
27/09/2023
29/09/2023
11/10/2023
12/10/2023
10/11/2023
13/11/2023
24/11/2023
20/12/2023
3/08/2023
1/09/2023
6/10/2023
6/11/2023
8/11/2023
9/11/2023
Drawing no. Drawing title
233168-430 General
Top DeckTitle Sheet Layout Platform 05 and 06
Assembly A A
233168-431 Top Deck Assembly Layout Platform 07 and 08 A A
233168-432 Top Deck Platform Modification PT-001 A A
233168-433 Top Deck Assembly Layout Internal C1 and C2 A A
233168-434 Top Deck Assembly Layout Internal C3 A A
233168-435 Top Deck Assembly Layout Internal C4 and C5 A A
233168-450 Lower Deck Assembly Layout Level 03 to Level 09 A A
233168-451 Lower Deck Assembly Layout Corner 01 and 02 A A
233168-452 Lower Deck Assembly Layout Corner 03 and 04 A A
233168-453 Lower Deck Assembly Layout Platform 01 and 02 A A
233168-454 Lower Deck Assembly Layout Platform 03 and 04 A A
233168-455 Lower Deck Assembly Layout Platform 05 and 06 A A
233168-456 Lower Deck Assembly Layout Platform 07 and 08 A A
233168-457 Lower Deck Platform Modification PL-001 A A
233168-458 Lower Deck Platform Modification PL1000 A A
233168-459 Lower Deck Assembly Layout Internal C1 and C2 A A
233168-460 Lower Deck Assembly Layout Internal C3 A A
233168-461 Lower Deck Assembly Layout Internal C4 and C5 A A
233168-462 Lower Deck MK Spacer Details A A
233168-475 Trailing Deck Assembly Layout Level 03 to Level 18 A A
233168-476 Trailing Deck Assembly Layout Deck C2 and C4 A A
280 Bilsen Rd
Geebung QLD 4034
Current Revision
15/08/2023
23/08/2023
25/08/2023
20/09/2023
27/09/2023
29/09/2023
11/10/2023
12/10/2023
10/11/2023
13/11/2023
24/11/2023
20/12/2023
3/08/2023
1/09/2023
6/10/2023
6/11/2023
8/11/2023
9/11/2023
Drawing no. Drawing title
233168-610 General TitleSequence
Installation Sheet Step 10 A A
233168-620 Temporary Support Stools Plan View Top of Pour 2 A B B
233168-621 Temporary Support Stools Detail Top of Pour 2 A B B
233168-625 Kicker Pour Scaffold Level 2 to Level 3 Walls Plan View A A
233168-626 Kicker Pour Scaffold Level 2 to Level 3 Walls Section A A
233168-627 Kicker Pour Scaffold Level 2 to Level 3 Walls Typical Details 1 A A
233168-628 Kicker Pour Scaffold Level 2 to Level 3 Walls Typical Details 2 A A
233168-629 Kicker Pour Scaffold Level 2 to Level 3 Walls Construction Stair Detail A A
233168-640 Lifting Diagram Top Grid Stage 1 A A
233168-641 Lifting Diagram Top Grid Stage 2 A A