The document describes the startup sequence for a raw mill hydraulic system group. It involves starting various pumps and motors in a specific order to build pressure in the low pressure and high pressure systems. The main drive will start after 180 seconds if the proper pressures are reached in the low pressure, high pressure, and gearbox systems. Once started, the raw mill group will be in a running state.
The document describes the startup sequence for a raw mill hydraulic system group. It involves starting various pumps and motors in a specific order to build pressure in the low pressure and high pressure systems. The main drive will start after 180 seconds if the proper pressures are reached in the low pressure, high pressure, and gearbox systems. Once started, the raw mill group will be in a running state.
The document describes the startup sequence for a raw mill hydraulic system group. It involves starting various pumps and motors in a specific order to build pressure in the low pressure and high pressure systems. The main drive will start after 180 seconds if the proper pressures are reached in the low pressure, high pressure, and gearbox systems. Once started, the raw mill group will be in a running state.