Professional Documents
Culture Documents
Unigaz Arabia
ed
Section Name Storage Tank Area
Item Name Quantity Unit List Price Total
Fuel Tank 35,000 Double wall UL, Horizontal, Cylindrical with 2 EA 105,300 SAR 210,600
ov
Saddle, MM 6/6Thickness
Vent Cap Pressure Vacuum Vent, UL Listed 2 EA 4,025 SAR 8,050
Flamme Arrestor 4", UL Listed 2 EA 17,325 SAR 34,650
Overfill Prevention Valve, UL Listed 2 EA 7,350 SAR 14,700
Filling Point Quick Disconnection Coupling 3" (End + Cover) 1 EA 4,550 SAR 4,550
pr
BALL VALVE 1" 6 EA 249.32 SAR 1,495.92
BALL VALVE 2" 11 EA 512.44 SAR 5,636.84
Fuel System Control Panel 7 1 EA 43,872.5 SAR 43,872.5
"Tank Gauging & Level Alarm Control System with Ultrasonic 2 EA 21,000 SAR 42,000
Level Transmitter"
Ap
Steel Aboveground Double Wall Fuel Tank with Capacity 1 EA 111,650 SAR 111,650
4,000 Liters
Flamme Arrestor 2", UL Listed 1 EA 7,425 SAR 7,425
Solenoid Valve - 2", UL Listed 1 EA 6,238.75 SAR 6,238.75
"Tank Gauging & Level Alarm Control System with Ultrasonic 1 EA 21,000 SAR 21,000
N
Level Transmitter"
Float Switch For Fuel Tank, 4 Contacts 1 EA 3,850 SAR 3,850
Vent Cap Pressure Vacuum Vent, UL Listed 1 EA 4,025 SAR 4,025
Leak Detection Device for Double Wall Fuel Tank 1 EA 3,850 SAR 3,850
Flexible Pipe 50mm 6 EA 3,240 SAR 19,440
Simplex Basket Strainer - 1" 1 EA 4,348.98 SAR 4,348.98
Overfill Prevention Valve for Daily Tank 1 EA 2,975 SAR 2,975
Section Subtotal SAR 184,802.73
mohammad.aboulokme@unigaz.net
ttttttttttttttttttttttttttttttttttttttffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffff
Print Name: ___________________________________ Date: _____________________
Signature : ____________________________________
QUOTATION
ed
CABLE
Section Subtotal SAR 59,944.2
ov
SUPPLY & INSTALLATION 20 1,500 SAR 30,000
Section Subtotal SAR 30,000
mohammad.aboulokme@unigaz.net
ttttttttttttttttttttttttttttttttttttttffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffff
Print Name: ___________________________________ Date: _____________________
Signature : ____________________________________
QUOTATION
Payment Terms:
25% Down Payment
30% After Delivery
40% Progress Installation
5% After T&C
Exclusions:
The Developer should provide the following:
ed
- Provide electric box at gas detector location beside every gas box.
- Apply concrete layer on all underground or embedded gas pipes
- Execute all kind of civil works, like but not limited to excavation for underground pipes, demolition, removing
plastering ,pouring concrete, executing Manholes and trenches...
- Electrical power supply for gas detection system & vaporizers
- Scaffold and crane as required
ov
- Installation of Fire fighting system (If Needed)
Warranty: The system will be under warranty from any defect for one year from the delivery date
pr
- Any change in the quantities will be considered as a variation and reflected on the total price. The pipes will be re-measured after
installation and any variation will be added / subtracted to the total invoice.
mohammad.aboulokme@unigaz.net
ttttttttttttttttttttttttttttttttttttttffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffff
Print Name: ___________________________________ Date: _____________________
Signature : ____________________________________
QUOTATION
Drawing x
1 Design drawings x
Shop drawings x
ed
Tank Area ( LPG storage) and Piping x
- LPG tank and Accessories. x
- Civil work for tank area x
2 - LPG Pipeline System: Consisting of schedule 40/80 seamless
x
pipeline, Isolation Valve, Relief Valve, Pressure Gauges.
ov
- Sprinkler system for the LPG Tank x
- Gas Detection x
Electrical System x
-Control panel for detectors x
pr
- Electrical cables from panel board to each detector x
3 - Power supply to vaporisers x
- Cathodic Protection for UG Tanks x
- Lighting inside the LPG Area x
Ap
mohammad.aboulokme@unigaz.net
ttttttttttttttttttttttttttttttttttttttffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffffff
Print Name: ___________________________________ Date: _____________________
Signature : ____________________________________