Customer: THIQAR OIL COMPANY (TOC)

DEHYDRATION AND DESALTING UNIT FOR NASSIRIYA


Plant:
DEGASSING STATION
Location: NASSIRIYA FIELD - IRAQ
Project Unit Document Code Serial n° Rev. Sheet

PE14017AR 00 CN-0003 01 00 1/5

UTILITIES CONSUMPTION SUMMARY

Firmato digitalmente da Maikel Tosti Firmato digitalmente da Roberta Lanteri

Maikel Tosti
Firmato digitalmente da Umberto Corsi
ND: cn=Maikel Tosti, o, ou,
email=tosti.m@pegitaly.it, c=IT Roberta Lanteri ND: cn=Roberta Lanteri, o, ou,
email=lanteri.r@pegitaly.it, c=IT
Data: 2018.03.08 15:58:49 +01'00'
Umberto Corsi ND: cn=Umberto Corsi, o, ou,
email=corsi.u@pegitaly.it, c=IT
Data: 2018.03.08 15:58:34 +01'00'
Mod. ST0002_0/xls

Data: 2018.03.08 15:59:00 +01'00'

00 15/02/2018 ISSUED FOR BASIC DESIGN M. TOSTI R. LANTERI U. CORSI

REV. DATE DESCRIPTION PREPARED CHECKED APPROVED/AUTHORIZED

This document is property of Progetti Europa & Global S.p.A. Roma, it may not be copied, reproduced and/or circulated without PEG’s authorization.
Customer: THIQAR OIL COMPANY (TOC)
DEHYDRATION AND DESALTING UNIT FOR NASSIRIYA
Plant:
DEGASSING STATION
Location: NASSIRIYA FIELD - IRAQ
Project Unit Document Code Serial n° Rev. Sheet

PE14017AR 00 CN-0003 01 00 2/5


Combustibles WATER & STEAM BALANCE
Equipment Service Treated Wash Plant Instrument Inert Electrical
Rev.

No. Gas Diesel MP LP HP LP Boiler Water Water Water Air Gas


Losses Air Power NOTES
UNITS FG Oil Steam Steam Cond. Cond. Feed SW PW WW
Tag Service [kg/h] PA IA IG [kW]
[kW] [kW] [kg/h] [kg/h] [kg/h] [kg/h] [kg/h] [m3/h] [m3/h] [m3/h] [Nm3/h] [Nm3/h] [Nm3/h]

WATER / WATER
0 01-E-002 HEAT EXCHANGER 1 2,25

01-E-001 OIL / OIL HEAT


0 1 1,07
A/B EXCHANGER

INDIRECT OIL
0 01-H-001 1 TBD TBD TBD
HEATER

0 Total 3,32
Mod. ST0002_0/xls

Notes:

This document is property of Progetti Europa & Global S.p.A. Roma, it may not be copied, reproduced and/or circulated without PEG’s authorization.
Customer: THIQAR OIL COMPANY (TOC)
DEHYDRATION AND DESALTING UNIT FOR NASSIRIYA
Plant:
DEGASSING STATION
Location: NASSIRIYA FIELD - IRAQ
Project Unit Document Code Serial n° Rev. Sheet

PE14017AR 00 CN-0003 01 00 3/5


Combustibles WATER & STEAM BALANCE
Equipment Service Treated Wash Plant Instrument Inert Electrical
Rev.

No. Gas Diesel MP LP HP LP Boiler Water Water Water Air Gas


Losses Air Power NOTES
UNITS FG Oil Steam Steam Cond. Cond. Feed SW PW WW
Tag Service [kg/h] PA IA IG [kW]
[kW] [kW] [kg/h] [kg/h] [kg/h] [kg/h] [kg/h] [m3/h] [m3/h] [m3/h] [Nm3/h] [Nm3/h] [Nm3/h]

01-P-001
0 CHARGE PUMPS 2 1,18 160 One Pump (2x100 %)
A/S

01-P-002 FRESH WATER


0 PUMPS
2 20 1,07 18,5 One Pump (2x100 %)
A/S

01-P-003 RECYCLE WATER


0 PUMPS
2 1,07 15 One Pump (2x100 %)
A/S

02-P-001
0 DRAIN PUMPS 2 2,14 22 One Pump (2x100 %)
A/S

03-P-001 EFFLUENT
0 2 2,14 900 One Pump (2x100 %)
A/S WATER PUMPS

03-P-002
0 SUMP PUMPS 2 2,25 30 One Pump (2x100 %)
A/S

0 Total 20 9,85 1146


Mod. ST0002_0/xls

Notes:

This document is property of Progetti Europa & Global S.p.A. Roma, it may not be copied, reproduced and/or circulated without PEG’s authorization.
Customer: THIQAR OIL COMPANY (TOC)
DEHYDRATION AND DESALTING UNIT FOR NASSIRIYA
Plant:
DEGASSING STATION
Location: NASSIRIYA FIELD - IRAQ
Project Unit Document Code Serial n° Rev. Sheet

PE14017AR 00 CN-0003 01 00 4/5


Combustibles WATER & STEAM BALANCE
Equipment Service Treated Wash Plant Instrument Inert Electrical
Rev.

No. Gas Diesel MP LP HP LP Boiler Water Water Water Air Gas


Losses Air Power NOTES
UNITS FG Oil Steam Steam Cond. Cond. Feed SW PW WW
Tag Service [kg/h] PA IA IG [kW]
[kW] [kW] [kg/h] [kg/h] [kg/h] [kg/h] [kg/h] [m3/h] [m3/h] [m3/h] [Nm3/h] [Nm3/h] [Nm3/h]
(3) Considered as Flush
DEHYDRATOR
0 01-V-001 30 3,32 Water 2 cycles (Future -
DEGASSER If required)

(4) Considered as Flush


0 01-V-002 DEHYDRATOR 30 0,12 200 Water 2 cycles (Future -
If required)

(5) Considered as Flush


DESALTER
0 01-V-003 30 3,32 Water 2 cycles (Future -
DEGASSER If required)

(6) Considered as Flush


0 01-V-004 DESALTER 30 0,12 200 Water 2 cycles (Future -
If required)

CLOSED DRAIN (11) Max consumption


0 02-V-001 (10)* (11)
of Nitrogen
DRUM

ACCUMULATED (11) Max consumption


0 03-V-001 2,14 (437)* (11)
of Nitrogen
WATER TANK

(11) Max consumption


0 03-V-002 SUMP TANK 2,14 (0,5)* (11)
of Nitrogen

0 Total 30 (2) 11,16 400

Notes: (1): "( )" means spare consumptions, not included in totals, "( )*" means intermittent consumptions, not included in totals;
Mod. ST0002_0/xls

(2): Treated water for desanding of vessels is intermittent usage; with only one vessel being desanded at a time.

This document is property of Progetti Europa & Global S.p.A. Roma, it may not be copied, reproduced and/or circulated without PEG’s authorization.
Customer: THIQAR OIL COMPANY (TOC)
DEHYDRATION AND DESALTING UNIT FOR NASSIRIYA
Plant:
DEGASSING STATION
Location: NASSIRIYA FIELD - IRAQ
Project Unit Document Code Serial n° Rev. Sheet

PE14017AR 00 CN-0003 01 00 5/5


Combustibles WATER & STEAM BALANCE
Equipment Service Treated Wash Plant Instrument Inert Electrical
Rev.

No. Gas Diesel MP LP HP LP Boiler Water Water Water Air Gas


Losses Air Power NOTES
UNITS FG Oil Steam Steam Cond. Cond. Feed SW PW WW
Tag Service [kg/h] PA IA IG [kW]
[kW] [kW] [kg/h] [kg/h] [kg/h] [kg/h] [kg/h] [m3/h] [m3/h] [m3/h] [Nm3/h] [Nm3/h] [Nm3/h]

Water Treatment
0 03-PK-001 1 2,0
Package

Demulsifier
0 04-PK-001 1 0,5
Injection Package

Corrosion Inhibitor
0 04-PK-002 1 0,5
Injection Package

Scale Inhibitor
0 04-PK-003 1 0,5
Injection Package
Mod. ST0002_0/xls

Notes: (1): "( )" means spare consumptions, not included in totals, "( )*" means intermittent consumptions, not included in totals;

This document is property of Progetti Europa & Global S.p.A. Roma, it may not be copied, reproduced and/or circulated without PEG’s authorization.

You might also like