NTISANE HOLDINGS Bund wall maintanance plan and sump building (23m³) Adrian
CLIENT
ESKOM
DATE Task DESCRIPTION EXPECTED RESULT ACTUAL RESULT PASSED TESTED BY COMMENTS
Erect wall to prevent
wall was successfully put in
1 contamination if there is oil
Building of broken wall spillage
place
crack free and evenly smooth
2 plaster wall and repair the cracks pending
wall
hole slightly bigger than
Excavation of concrete slab
3 8000mm x 1050mm hole to pending
and soil
allow ample working space
Preparation of formwork and
4 pending
Reinforcement steel.
pour concrete into escavated
5 cast 30mpa concrete pending
holes
pour concrete and
6 Excavate for sump pending
Reinforcement.
10 handover
Any articles, templates, or information provided by Smartsheet on the website are for reference
only. While we strive to keep the information up to date and correct, we make no representations
or warranties of any kind, express or implied, about the completeness, accuracy, reliability,
suitability, or availability with respect to the website or the information, articles, templates, or
related graphics contained on the website. Any reliance you place on such information is
therefore strictly at your own risk.