1ST Floor
1ST Floor
Rsidential Appartment
Project : VIGOR PANOROMA.
9 (nine) storied Building.
1ST. FLOOR
TYPE-A
Sl. No. Description QNTY. UNIT RATE TOTAL
a) 3/4" dia.
i) 2 ways 1 doz. 120.00 120.00
i) 3 ways 1 doz. 120.00 120.00
i) 4ways 1 doz. 120.00 120.00
b) 1" dia :
i) 2 ways Nil.
i) 3 ways Nil.
i) 4ways Nil.
5.0 PVC ADHESIV GLUE (Electrical grade) 0.5 kg. 400.00 200.00
a) 1.3 rm for point wirring ( Joint Box Type) 600 m 16.00 9600.00
b) 1.5 rm. for SB-SDB CKT 300 m 19.00 5700.00
c) 2.5 rm. for SDB-Freez CKT. 40 m 34.00 1360.00
d) 4 rm. for SDB-AC,G CKT 20 m 53.00 1060.00
e) 6 rm. 0
f) 10 rm. for DB-SDB 45 m 120.00 5400.00
02) TP MCB :-
a) 6A 0
03) TP MCCB :-
a) 60A 0
d) 4 Gang 0
12"x3"x2
d) 4 Gang 0
56225.00
Estimated Cost of Interior Electrification of
Rsidential Appartment
Project : VIGOR PANOROMA.
9 (nine) storied Building.
1ST. FLOOR
TYPE-B
Sl. No. Description QNTY. UNIT RATE TOTAL
a) 3/4" dia.
i) 2 ways 1 doz. 120.00 120.00
i) 3 ways 1 doz. 120.00 120.00
i) 4ways 1 doz. 120.00 120.00
b) 1" dia :
i) 2 ways Nil.
i) 3 ways Nil.
i) 4ways Nil.
5.0 PVC ADHESIV GLUE (Electrical grade) 0.5 kg. 400.00 200.00
a) 1.3 rm for point wirring ( Joint Box Type) 450 m 16.00 7200.00
b) 1.5 rm. for SB-SDB CKT 250 m 19.00 4750.00
c) 2.5 rm. for SDB-Freez CKT. 20 m 34.00 680.00
d) 4 rm. for SDB-AC,G CKT 20 m 53.00 1060.00
e) 6 rm. 0
f) 10 rm. for DB-SDB 22 m 120.00 2640.00
02) TP MCB :-
a) 6A 0
03) TP MCCB :-
a) 60A 0
d) 4 Gang 0
12"x3"x2
d) 4 Gang 0
42683.00