Professional Documents
Culture Documents
Service M Adjustm. Automatic Screen Exchange GD HM V02
Service M Adjustm. Automatic Screen Exchange GD HM V02
Service manual
Adjustment automatic screen exchange
15 mm
Side
plate
2.
3.
Remark: 1 mm
The total clearance may never exceed 2
mm.
Side
plate
Pagina 2 van 8
4.
Equal distance
5.
Fork on large
cylinder
6.
Pagina 3 van 8
7.
8.
Remark:
Only adjust the sensors when the screens Cam on
are completely in the hammer mill. screen
Fixing
The sensor must be positioned in the bracket
middle of each grinding chamber.
ATEX ATEX
Remark:
Only adjust the sensors when the screens
are completely in the hammer mill Cam on
screen
Distance between cam on the screen and
the sensor ’screen in the mill’ → 10 mm
Reference dimension:
screen plate up to backside sensor → 70 Sensor
mm. ‘screen
in mill’
Distance between top side sensor and
outside shaft → 4 mm
Fixing
The sensor must be positioned in the bracket
middle of each grinding chamber.
Pagina 4 van 8
8.
9.
Connection piece
Fix the cam to the screen with a counter
sunk hexagon head screw M10x25.
Never use a longer screw!
Optional:
When a connection piece is used, it is
fixed with 5 bolt/nut M8x10
combinations.
M10x25
M8x10
Pagina 5 van 8
10.
Remark: Switch
For a switch at the other side of the
cassette (GD 1400), turn the play
counterclockwise. Safety valve
Locking
screw
11.
Cylinder
40x125 mm
Fork
Pagina 6 van 8
12.
13.
Fixed
position Sensor ‘screen in cassette’
14.
Pagina 7 van 8
15.