You are on page 1of 1

03

SCHEDULE OF SLAB
BOTTOM STEEL TOP STEEL EXTRA TOP STEEL
SLAB SLAB
REMARKS
MKD THICKNESS
EXISTING MAIN SPAN OTHER SPAN MAIN SPAN OTHER SPAN MAIN SPAN OTHER SPAN

STRUCTURE S1 110 #08@200 C/C #08@200 C/C #08@200 C/C #08@200 C/C -- -- PLAIN DOUBLE MESH SLAB

Z
STEEL BOTHWAYS
AT BOTTOM FACE
8@200 C/C

110
STEEL BOTHWAYS
150 AT TOP FACE 150
8@200 C/C EXISTING
EXISTING
Y BEAM
RCC BEAM

TYP. SECTION Y-Z AT REBARING OF SLAB "S1"

TYPICAL RING HOOK

IMPORTANT INSTRUCTIONS :
1) GRADE OF CONCRETE = M25
2) GRADE OF STEEL = FE500
3) COVER TO BEAM = 30MM,
4) COVER TO SLAB = 20MM
5) ALL DIMENSIONS WILL BE AS PER ARCHITECTURAL DRAWING UNLESS OTHERWISE
SPECIFIED.
6) ADD SUPPORT TO 2ND SLAB (BELOW EXTENDED PORTION) FROM BELOW UNLESS
UNTIL ABOVE SLAB IS COMPLETED.
7) EXISTING STRUCTURAL STABILITY WILL NOT BE OUR RESPONSIBILITY.
STRUCTURAL LAYOUT AT THIRD SLAB LEVEL 8) REFER ARCHITECTURAL DRAWINGS ALONG WITH THIS DRAWING.
9) DISCREPANCY IF ANY SHALL BE DISCUSSED WITH STRUCTURAL ENGINEER.

*** IMP NOTE : BEFORE DOING REBARING AT ANY SURFACE, CHIP OFF EXISTING
PLASTER & COLOR FROM THAT EXISTING CONCRETE SURFACE,
*** DO MIN. 150MM REBARING BY USING ADHESIVE CHEMICAL & BEFORE DOING
CONCRETING APPLY RBR ADHESIVE CHEMICAL OVER THE SURFACE , BEFORE
LAYING NEW CONCRETE.

You might also like