ALL PHASES Risk Assessment

Project Document Repository


Quality Assurance Status Report
Requirements Traceability Matrix
CONCEPTUALIZATION Project Approval Document
Stakeholder Impact Assessment
Elicitation Requirements Elicitation Document (RED)
Preliminary Architecture Specification Doc (Section 2,4 6)
INITIATION Cost Benefits Analysis
Communications Plan
ANALYSIS AND DESIGN Project Management Plan
Change Assessment
Requirements Analysis Solution Requirements Specification (SRS)
Requirements List (RL - Nonfunctional Requirements)
Service Operation Requirements (SOR)
Test Strategy
Architecture Design Architecture Specification Document
UAT Test Plan
UAT Test Cases
Detailed Design Detailed Design Document
Class Design Document
Data Model Document
System Test Cases Document
System Test Plan Document
Overall Solution Design
DEVELOPMENT Product Developed (project deliverables)
Application Code/Package
Installation Guide
Operations Manual
Release Notes
Component Integration Defect Log
Component Integration Test Progress Report
TESTING Implementation Plan
System & Integration Testing System and Integration Defect Log
System and Integration Test Progress Report
User Manuals
User Acceptance Testing UAT Test Defect Tracking Document
UAT Test Progress Report
Client Acceptance Form (CAF)
Updated Communications Plan
Operational Readiness Review
IMPLEMENTATION User Training
Change Readiness Assessment
Knowledge Transfer Document
Key Milestone Review -Implementation Complete
POST IMPLEMENTATION Post Implementation Review (PIR)
Benefits Validation Review Report (BVR)
Close/Archive Project in Planview