GENERAL NOTES: 2-100mm² THHN +

1-30mm²(G), in
50mm IMC PIPE
1. ALL ELECTRICAL WORKS HEREIN INCLUDED SHALL BE EXECUTED IN
ACCORDANCE WITH THE PROVISION OF THE LATEST EDITION OF THE
PHILIPPINE ELECTRICAL CODE,THE RULES AND REGULATIONS OF DISTRIBUTION UTILITY
230V, 60HZ

THE LOCALITY AND THE REQUIRMENTS OF THE POWER COMPANY NEMA 3R

M
2. ALL ELECTRICAL WORKS HEREIN INCLUDED SHALL BE EXECUTED BY
EXPERIENCE MEN UNDER THE DIRECT SUPERVISION OF A FULL TIME
ELECTRICAL ENGINEER, WORKS SHALL BE NEATLY PLACED, SECURELY GENERATOR
230V, 60HZ

FASTENED AND PROPERLY FINISHED.


NORMAL EMERGENCY
MTS

2-100mm² THHN +
1-30mm²(G), in
3. ALL CONDUITS SHALL BE PROTECTED AGAINST DAMAGES BY THE 50mm IMC PIPE
230AT/250AF
ENTRANCE OF WATER AND FOREIGN MATTER DURING CONTRUCTION. 230V,1P+N+G

ALL ENDS OF CONDUIT SHALL BE PLUGGED TO EXCLUDE MOISTURE AND 60AT 120AT

PB 1 C1 C2 PB 2
DUST IMMEDIATELY AFTER THE CONDUITS ARE PLACED. 15AT 15AT

LIGHTING OUTLET C3 C4 LIGHTING OUTLET


15AT 20AT

4. CONTRACTORS MUST SUBMIT SHOP DRAWINGS OF ALL PANELBOARDS LIGHTING OUTLET C5


20AT 20AT
C6 CONVENIENCE OUTLET

TO THE ENGINEER PRIOR TO FABRICATION SHALL BE UTILIZED IN THE CONVENIENCE OUTLET C7


30AT 20AT
C8 CONVENIENCE OUTLET

ENTIRE PROJECT REQUIRMENT. 1.5HP ACU/FCU C9 C10


REFRIGERATOR
20AT 20AT

RANGE C11 C12


SPARE
5. MOUNTING HEIGHT OF DEVICES SHALL BE AS APPROVED BY THE
ARCHITECT AND / OR ELECTRICAL ENGINEER AS FOLLOWS: Grounding Busbar Neutral Busbar

PANEL BOARD - 1.82M ABOVE FINISHED FLOOR TO CENTER OF DEVICE PB MAIN

WALL SWITCHES - 1.37 M ABOVE FINISHED FLOOR TO CENTER OF DEVICE 1 COMPUTATION OF LOADS (MAIN) 2-8.0mm² THHN +
E-1 SCALE NTS 1-3.5mm²(G), in
CONVENIENCE OUTLET - 0.30M ABOVE FINSHED FLOOR TO CENTER OF 25mm PVC PIPE
60AT/100AF
DEVICE 230V,1P+N+G

15AT 20AT

LIGHTING OUTLET C1 C2 CONVENIENCE OUTLET


6. LIGHTING FIXTURE, SWITCHES, ETC. ARE TO BE LOCATED APPROXIMATELY 20AT 20AT

REFRIGERATOR C3 C4 RANGE
AS SHOWN ON THE D RAWINGS. THE FIELD ENGINEER SHOULD PROPERLY 20AT 20AT

SPACE THEM USING STANDARDS WHERE APPLICABLE. SPARE C5 C6 SPARE

- 0.15 ABOVE WORKING COUNTER TO CENTER OF DEVICE


Grounding Busbar Neutral Busbar

7. UPON COMPLETION OF ELECTRICAL CONSTRUCTION WORK, THE FF. TEST


SHALL BE PERFORMED BY THE CONTRACTOR INCLUSIVE OF THE PB MAIN

INSTALLATION TO BE REPORTED IN DEATAILED AND IN FORMS APPROVED 2-22mm² THHN +


1-5.5mm²(G), in
BY THE ENGINEER. 25mm PVC PIPE
120AT/150AF
A) INSLUATION RESISTANCE TEST 230V, 1P+N+G

15AT 15AT
B) GROUND RESISTING TEST
LIGHTING OUTLET C1 C2 LIGHTING OUTLET
C) OPERATIONAL TEST 20AT 20AT

CONVENIENCE OUTLET C3 C4 CONVENIENCE OUTLET


D) SYSTEM TEST 40AT 40AT

2.5HP ACU/FCU C5 C6 2.5HP ACU/FCU


30AT 30AT

LEGEND 2 COMPUTATION OF LOADS (PB - 1) 1.5HP ACU/FCU C7


20AT 20AT
C8 1.5HP ACU/FCU

E-1 SCALE NTS


SPARE C9 C10 SPARE

PINLIGHT DUPLEX CONVENIENCE OUTLET


F FLOOR MOUNTED CONVENIENCE OUTLET Grounding Busbar Neutral Busbar
1 X15W T8 LIGHT
REF REFRIGERATOR OUTLET
PINLIGHT
CHANDELIER
WP WEATHER PROOF OUTLET 4 SINGLE LINE DIAGRAM
RH RANGE HOOD OUTLET E-1 SCALE NTS

S ONE GANG SWITCH


ACU AIR CONDITION OUTLET
EYE BOLT
2S TWO GANG SWITCH PB POWER PANEL BOARD
SERVICE ENTRANCE
3S THREE GANG SWITCH 2
PB-1 CIRCUIT BREAKER CONNECT TO POWER SOURCE
2
PB-1 GFCI CIRCUIT BREAKER WITH GFCI
SERVICE ENTRANCE
PROVISION FOR GENERATOR OF TELEPHONE & CABLE
POWER SERVICE ENTRANCE SUPPLY
1 dia 230V, 2 - WIRE=G 230V, 2 - WIRE=G
COORDINATE WITH THE
UTILITY COMPANY
KWH METER
2-100mm2 THHN MTS PB-M

20 FT.
1-30mm2 THHN IN 50MM dia IMC

KWHR METER
M
2-100mm2 THHN
1-30mm2 THHN IN 50MM dia IMC

GROUND FLOOR #14 sq mm BARE COPPER WIRE (BOW)


CONNECTED TO 20mm dia X 3000mm
LONG GROUND ROD 3 COMPUTATION OF LOADS (PB - 2)
SCALE
E-1 NTS

5 POWER SYSTEM ONE LINE DIAGRAM


SCALE
7 ELECTRICAL POST DETAIL
SCALE
E-1 NTS E-1 NTS

PRC NO. P R O J E C T: APPROVED BY: Designed by: SHEET NO.

PROPOSED 2 STOREY RESIDENTIAL


PTR NO.

DATE:
BUILDING WITH ROOF DECK
Drawn by:

Checked by:
E
ELETRICAL ENGINEER ISSUED AT:
LOCATION:
21 QUEEN ST., DOÑA RITA VILLAGE, BANILAD, CEBU CITY