You are on page 1of 9

CURRICULUM VITAE

PERMANENT ADDRESS
KOERIBARI, FIRST LANE
P.O.&DIST.– GAYA (BIHAR)
PIN CODE – 823001
MOBILE NO.: 09871815187
09801212514
E-Mail- s_k_singh15@rediffmail.com

SANJAY KUMAR SINGH

Objective To develop a career in project in an organization with inbuilt


transparency and professional management and there by to take
more challenging assignments and strive hard to achieve
management goals.

Experience 2008 FEB-2009FEB, PUNJ LLOYD LTD. MUSCAT


CONSTRUCTION MANAGER
PROJECT DETAILS
SAIH RAWL TO SADAD (BVS-9) LOOP LINE PROJECT
CLIENT: OMAN GAS COMPANY.
CONSULTANT: MOTT MACDONALD
DESCRIPTION: 253KM 32”DIA-11.9MM, 14.3MM, 17.5MM
THICK,
API 5L-X65, 3LPE-COATED PIPE

NATURE OF RESPONSIBILITIES
 Co-ordination with Design, Engineering and
procurement departments.
 Leading a team of project execution, planning and
QA/QC personal
 Coordinating/Laisoning with the client & subcontractors.
 Cost Estimation and controlling.
 Equipment, Manpower mobilization & allocation.
 Day to day execution planning & monitoring.
 Project progress monitoring & controlling to ensure timely
Completion of projects
 Analysis, leveling and allocation of project resources.
 Ensuring safety norms are complied by all concerned.
 Developing and monitoring MIS reporting.
2007 JAN-2008 FEB GAMMON INDIA LTD. MUMBAI
MANAGER-PIPELINES
PROJECT DETAILS
DAHEJ-URAN PIPELINE PROJECT
CLIENT: GAS AUTHORITY OF INDIA LTD.
CONSULTANT: TRACTEBEL ENGINEERING
DESCRIPTION: 106 KM 30”DIA-11.9MM,14.3MM,19.1MM
THICK, 70.5KM 24’’DIA-10.3MM,11.9MM,14.3MM THICK
& 8.1 KM 18’’ DIA-7.1MM,11.1MM THICK
API 5L-X70, 3LPE-COATED PIPE

NATURE OF RESPONSIBILITIES
 Co-ordination with Design, Engineering and
procurement departments.
 Leading a team of project execution, planning and
QA/QC personal
 Coordinating/Laisoning with the client & subcontractors.
 Cost Estimation and controlling.
 Equipment, Manpower mobilization & allocation.
 Day to day execution planning & monitoring.
 Project progress monitoring & controlling to ensure timely
Completion of projects
 Analysis, leveling and allocation of project resources.
 Ensuring safety norms are complied by all concerned.
 Developing and monitoring MIS reporting

2005 OCT-2007 JAN ESSAR CONST. LTD. MUMBAI


MANAGER-PIPELINES
PROJECT DETAILS
MUNDRA-DELHI PIPELINE PROJECT
CLIENT : HINDUSTAN PETROLEUM CORPORATION
LIMITED
CONSULTANT : EIL
DESCRIPTION: 541 KM 18”DIA-6.4MM, 7.1MM, 7.9MM,
8.7MM THICK
API 5L-X65, 3LPE-COATED PIPE

NATURE OF RESPONSIBILITIES
 Co-ordination with Design, Engineering and
procurement departments.
 Leading a team of project execution, planning and
QA/QC personal
 Coordinating/Laisoning with the client & subcontractors.
 Cost Estimation and controlling.
 Equipment, Manpower mobilization & allocation.
 Day to day execution planning & monitoring.
 Project progress monitoring & controlling to ensure timely
completion of projects.
 Analysis, leveling and allocation of project resources.
 Ensuring safety norms are complied by all concerned.
 Developing and monitoring MIS reporting.
2005 FEB – 2005 SEP DODSAL PTE. LTD. DUBAI.
CONSTRUCTION MANAGER
PROJECT DETAILS
SPPC MULTI PRODUCT PIPELINE
CLIENT : ONGC VIDESH LTD.
CONSULTANT : CEIL
DESCRIPTION : 741 KM 12”DIA- 6.4 MM, 9.5 MM THICK
API GR 5L-X60, X65 & X70 3LPE-COATED PIPE
NATURE OF RESPONSIBILITIES
 Co-ordination with Design, Engineering and
procurement departments.
 Leading a team of project execution, planning and
QA/QC personal
 Coordinating/Laisoning with the client & subcontractors.
 Cost Estimation and controlling.
 Equipment, Manpower mobilization & allocation.
 Day to day execution planning & monitoring.
 Project progress monitoring & controlling to ensure timely
completion of projects.
 Analysis, leveling and allocation of project resources.
 Ensuring safety norms are complied by all concerned.
 Developing and monitoring MIS reporting.

2004 JULY- 2005 JAN PUNJ LLOYD LTD. KAZAKHSTAN


CONSTRUCTION MANAGER
PROJECT DETAILS
LBSB PIPELINE PROJECT
CLIENT – TCO
DESCRIPTION : 411 KM 2”,4”,6”,8”,10”,12”,16”,20” &24”
DIA-11.1 MM,14.3MM & 17.5MM THICK API GR 5L-X65
3LPE-COATED PIPE

NATURE OF RESPONSIBILITIES
 Co-ordination with Design, Engineering and procurement
departments.
 Leading a team of project execution, planning and QA/QC
personal
 Coordinating/Laisoning with the client & subcontractors.
 Cost Estimation and controlling.
 Equipment, Manpower mobilization & allocation.
 Day to day execution planning & monitoring.
 Project progress monitoring & controlling to ensure timely
completion of projects.
 Analysis, leveling and allocation of project resources.
 Ensuring safety norms are complied by all concerned.
 Developing and monitoring MIS reporting.
2003 FEB.-2004 FEB. DODSAL PTE. LTD. DUBAI
CONSTRUCTION MANAGER
PROJECT DETAILS
AL-AIN-FUJAIRAH GAS PIPELINE PROJECT
CLIENT : DOLPHIN ENERGY LTD.
DESCRIPTION : 200KM 24” DIA-10.5 THICK API GR-5L -
X65 3LPE-COATED PIPE
NATURE OF RESPONSIBILITIES
 Co-ordination with Design, Engineering and procurement
departments.
 Leading a team of project execution, planning and QA/QC
personal
 Coordinating/Laisoning with the client & subcontractors.
 Cost Estimation and controlling.
 Equipment, Manpower mobilization & allocation.
 Day to day execution planning & monitoring.
 Project progress monitoring & controlling to ensure timely
completion of projects.
 Analysis, leveling and allocation of project resources.
 Ensuring safety norms are complied by all concerned.
 Developing and monitoring MIS reporting.

2002 MAY -2003 JAN DODSAL LTD. MUMBAI


SPREAD IN-CHARGE
PROJECT DETAILS
SMPL AUGMENTATION LOOPLINE PROJECT
CLIENT : INDIAN OIL CORPORATION LTD.
DESCRIPTION : 175 KM 10”,18”24” & 28” DIA – 0.250”,
0.281” , 0.312” & 0.375” THICK API GR 5L- X65 CTE
COATED PIPE.
NATURE OF RESPONSIBILITIES
 Co-ordination with Design, Engineering and procurement
departments.
 Leading a team of project execution, planning and QA/QC
personal
 Coordinating/Laisoning with the client & subcontractors.
 Cost Estimation and controlling.
 Equipment, Manpower mobilization & allocation.
 Day to day execution planning & monitoring.
 Project progress monitoring & controlling to ensure timely
completion of projects.
 Analysis, leveling and allocation of project resources.
 Ensuring safety norms are complied by all concerned.
 Developing and monitoring MIS reporting.
2001 SEP-2002 FEB DODSAL LTD. MUMBAI
SPREAD IN-CHARGE
PROJECT DETIALS
HAZIRA-DEHEJ GAS PIPELINE PROJECT
CLIENT : INDIAN PETROCHEMICAL CORPORATION LTD.
CONSULTANT : EIL
DESCRIPTION : 98KM EACH OF 24” & 26” DIA-7.9 MM
THICK API GR 5L-X60 3LPE COATED PIPE
NATURE OF RESPONSIBILITIES
 Co-ordination with Design, Engineering and procurement
departments.
 Leading a team of project execution, planning and QA/QC
personal
 Coordinating/Laisoning with the client & subcontractors.
 Cost Estimation and controlling.
 Equipment, Manpower mobilization & allocation.
 Day to day execution planning & monitoring.
 Project progress monitoring & controlling to ensure timely
completion of projects.
 Analysis, leveling and allocation of project resources.
 Ensuring safety norms are complied by all concerned.
 Developing and monitoring MIS reporting.

2000 FEB.- 2001 AUG. DODSAL LTD. MUMBAI


SPREAD IN-CHARGE
PROJECT DETAILS
HALDIA BARAUNI AUGMENTATION PROJECT
CLIENT : INDIAN OIL CORPORATION LTD.
DESCRIPTION : 437 KM. 18”DIA – 0.250, 0.281”,0.312” &
0.375” THICK API GR 5L-X65 CTE COATED PIPE
NATURE OF RESPONSIBILITIES
 Co-ordination with Design, Engineering and procurement
departments.
 Leading a team of project execution, planning and QA/QC
personal
 Coordinating/Laisoning with the client & subcontractors.
 Cost Estimation and controlling.
 Equipment, Manpower mobilization & allocation.
 Day to day execution planning & monitoring.
 Project progress monitoring & controlling to ensure timely
completion of projects.
 Analysis, leveling and allocation of project resources.
 Ensuring safety norms are complied by all concerned.
 Developing and monitoring MIS reporting.
1999 MAY- 2000 JAN DODSAL LTD. MUMBAI
SITE COORDINATOR
PROJECT DETAILS
DAHEJ GANDHAR GAS PIPELINE PROJECT
CLIENT : INDIAN PERTROCHEMICAL CORPORATION LTD.
CONSULTANT : EIL
DESCRIPTION : 35 KM, EACH OF 24”& 26” DIA – 7.9 MM
& 11.1 MM THICK API GR 5L- X60 3LPE COTATED PIPE
NATURE OF RESPONSIBILITIES
 Co-ordination with Design, Engineering and procurement
departments.
 Leading a team of project execution, planning and QA/QC
personal
 Coordinating/Laisoning with the client & subcontractors.
 Cost Estimation and controlling.
 Equipment, Manpower mobilization & allocation.
 Day to day execution planning & monitoring.
 Project progress monitoring & controlling to ensure timely
completion of projects.
 Analysis, leveling and allocation of project resources.
 Ensuring safety norms are complied by all concerned.
 Developing and monitoring MIS reporting.

1997 AUG -1999 APRIL DODSAL LTD. MUMBAI


HYDROTEST ENGINEER
PROJECT DETAILS
HALDIA BARAUNI CRUDE OIL PIPE LINE PROJECT
CLIENT : INDIAN OIL CORPORATION LTD.
DESCRIPTION : 500 KM 18”DIA -0.250, 0.281”,0.312” &
0.375” THICK API GR 5L-X65 CTE COATED PIPE.
NATURE OF RESPONSIBILITY
 Experience in Design, Engineering execution of hydro
testing activities(Pipe lines & piping)
 Fabrication of Test headers for air Cleaning, Gauging and
pressure test, fabrication of different Types of cleaning,
batching and brush PIG.
 Fabrication of different sizes for spools and flanges for air
pigging and water filling arrangement.
 Capable to handle all activities related to hydro-Test-like
Pigging, Gauging, Filling , pressurisation, De watering and
Drying of pipeline.
 Successfully and Independently carried out hydrotesting
activities, for long streth of pipline HBCPL Project
 To co-ordinate with spread – in charge/Planning Engineer
& H.O. base Manger to speed up the progress and to
monitoring the site activities and involves in shifting of
equipments like compressor, Filling Pump, Pr. Pump & Air
dryers etc.
 To lead a team of technician, skilled & unskilled workman
by allocating proper job & timely Evaluation and
resignation performance of their to enhance progress.
 To do proper documentation of all activities as per
Standard & recommended codes approved by clients.
 To take special care of crew keeping safety factors in mind
& to achieve zero accident working.
 Activity involved in intelligent pigging HBCPL M/L
Project IOCL with Pipetronix Germany.
 Actively involved in commissioning of crude pipeline
Project IOCL (HBCPL Project).

1997 JAN-1997 JULY DODSAL LTD. MUMBAI


HYDROTEST ENGINEER
PROJECT DETAILS
VIRAMGAM CHAKSU PANIPAT PIPELINE PROJECT
-LOOPLINE
CLIENT : INDIAN OIL CORPORATION LTD.
DESCRIPTION : 110 KM 24”DIA – 0.281”, 0.312” & 0.375
THICK API GR 5L-X52 CTE COATED PIPE.
NATURE OF RESPONSIBILITY
 Experience in Design, Engineering execution of hydro
testing activities(Pipe lines & piping)
 Fabrication of Test headers for air Cleaning, Gauging and
pressure test, fabrication of different Types of cleaning,
batching and brush PIG.
 Fabrication of different sizes for spools and flanges for air
pigging and water filling arrangement.
 Capable to handle all activities related to hydro-Test-like
Pigging, Gauging, Filling , pressurisation, De watering and
Drying of pipeline.
 Successfully and Independently carried out hydrotesting
activities, for long streth of pipline HBCPL Project
 To co-ordinate with spread – in charge/Planning Engineer
& H.O. base Manger to speed up the progress and to
monitoring the site activities and involves in shifting of
equipments like compressor, Filling Pump, Pr. Pump & Air
dryers etc.
 To lead a team of technician, skilled & unskilled workman
by allocating proper job & timely Evaluation and
resignation performance of their to enhance progress.
 To do proper documentation of all activities as per
Standard & recommended codes approved by clients.
 To take special care of crew keeping safety factors in mind
& to achieve zero accident working.
 Activity involved in intelligent pigging HBCPL M/L
Project IOCL with Pipetronix Germany.
 Actively involved in commissioning of crude pipeline
Project IOCL (HBCPL Project).
1995 NOV. – 1996 DEC. DODSAL LTD. MUMBAI
HYDROTEST ENGINEER
PROJECT DETAILS
VIRAMGAM CHAKSU PANIPAT PIPELINE PROJECT
CLIENT : INDIAN OIL CORPORATION LTD.
DESCRIPTION : 324 KM 24”DIA – 0.281”,0.312” & 0.375”
THICK API GR 5L-X 52 CTE COATED PIPE
NATURE OF RESPONSIBILITY
 Experience in Design, Engineering execution of hydro
testing activities(Pipe lines & piping)
 Fabrication of Test headers for air Cleaning, Gauging and
pressure test, fabrication of different Types of cleaning,
batching and brush PIG.
 Fabrication of different sizes for spools and flanges for air
pigging and water filling arrangement.
 Capable to handle all activities related to hydro-Test-like
Pigging, Gauging, Filling , pressurisation, De watering and
Drying of pipeline.
 Successfully and Independently carried out hydrotesting
activities, for long streth of pipline HBCPL Project
 To co-ordinate with spread – in charge/Planning Engineer
& H.O. base Manger to speed up the progress and to
monitoring the site activities and involves in shifting of
equipments like compressor, Filling Pump, Pr. Pump & Air
dryers etc.
 To lead a team of technician, skilled & unskilled workman
by allocating proper job & timely Evaluation and
resignation performance of their to enhance progress.
 To do proper documentation of all activities as per
Standard & recommended codes approved by clients.
 To take special care of crew keeping safety factors in mind
& to achieve zero accident working.
 Activity involved in intelligent pigging HBCPL M/L
Project IOCL with Pipetronix Germany.
 Actively involved in commissioning of crude pipeline
Project IOCL (HBCPL Project).

1994 MAY – 1995 OCT. DODSAL LTD. MUMBAI


HYDROTEST ENGINEER
PROJECT DETAILS
KANDALA BHATINDA PIPELINE PROJECT
CLIENT : INDIAN OIL CORPORATION LTD.
DESCRIPTION : 350 KM 22” DIA & 125 KM 10” DIA
0.281”,0.312” & 0.375” THICK API GR 5L-X52 CTE
COATED PIPE.
NATURE OF RESPONSIBILITY
 Experience in Design, Engineering execution of hydro
testing activities(Pipe lines & piping)
 Fabrication of Test headers for air Cleaning, Gauging and
pressure test, fabrication of different Types of cleaning,
batching and brush PIG.
 Fabrication of different sizes for spools and flanges for air
pigging and water filling arrangement.
 Capable to handle all activities related to hydro-Test-like
Pigging, Gauging, Filling , pressurisation, De watering and
Drying of pipeline.
 Successfully and Independently carried out hydrotesting
activities, for long streth of pipline HBCPL Project
 To co-ordinate with spread – in charge/Planning Engineer
& H.O. base Manger to speed up the progress and to
monitoring the site activities and involves in shifting of
equipments like compressor, Filling Pump, Pr. Pump & Air
dryers etc.
 To lead a team of technician, skilled & unskilled workman
by allocating proper job & timely Evaluation and
resignation performance of their to enhance progress.
 To do proper documentation of all activities as per
Standard & recommended codes approved by clients.
 To take special care of crew keeping safety factors in mind
& to achieve zero accident working.
 Activity involved in intelligent pigging HBCPL M/L
Project IOCL with Pipetronix Germany.
 Actively involved in commissioning of crude pipeline
Project IOCL (HBCPL Project).

Education
1994 Diploma in Electrical Engineering with first class
distinction in April 1994, from Govt.
Polytechnic, Gaya (Bihar).
2001 Diploma in Industrial Safety in 2001 (NILEM,
Chennai).

Computer Knowledge General : Microsoft Excel, Microsoft Word.

Personal Details

Marital Status - Married

Nationality - Indian

Date of Birth - 05.01.1973

Language Known - English , Hindi

Passport Details - No. – E9339678


Place of Issue – Khartoum (Sudan)
Date of Issue -14.07.2005
Date of validity – 13.07.2015

You might also like