KEY PLAN
N
NORTH
01 02 03 04 07 08 09 10
GENERAL NOTES
40
39
38
56
55
54
58
57
53
52
TABLES IN TO CONSIDERATION.
51
41
42
43
44
45
46
47
48
49
50
A A
26 27 LEGEND
PREPARATION 40 25 ABLUTION F. PRAYER RM.
28
AREA 39
PANTRY
38 29 SHOMOUL OFFICES
37 30 F.TOILET
31
M.TOILET (6CUBICALS) M. PRAYER RM. (3CUBICALS) T&T OFFICES
36
35 34 33
32
JLL OFFICES
CONSULTANT OFFICES
B B SHARED FACILITIES AREAS
C C
MEETING ROOM MEETING ROOM
MEETING ROOM-01 MEETING ROOM-02 MEETING ROOM-03 (8 PAX)
(4 PAX) (4 PAX) (4 PAX)
B Approved as Noted
PANTRY
THE AVENUES KHOBAR
KHOBAR, SAUDI ARABIA
Client:
PROJECT Sr.PROJECT 40
DIRECTOR MANAGER'S 39
41 42 43 44 45 46 47 48 49 50
OFFICE OFFICE
38 Cost Consultant:
37
57
56
55 50 49 48 47 46 45 44 43 42 41
STAIR CASE-01
54
53 Consultant:
52
51
51
53
54
55
56
52
57
37
38
39
40
STAIR CASE-01
Design Architect:
G G CallisonRTKL-UK Ltd. (Dubai Branch)
Burj Al Salam Tower,44th Floor, Trade
Centre 1Dubai, PO Box 118254
A
United Arab Emirates
Main Contractor:
Partnership Ahmadiah KCC ةكرا نماضت يدمحالا
& Kifah Contracting Co. يافكاا الحاامدل
AHMADIAH
Sub-Contractor:
01 02 03 04 05 06 07 08 09 10
SHOP DRAWING
SHOP DRAWING TITLE: