Professional Documents
Culture Documents
General Information
Camp:
Location:
Coordinates:
Land status:
Size (m2)
Date of occupation:
Environment
1.2
0.8
Total
0.6
0.4
0.2
0
Wastewater already well Soil Contamination already Solid Waste already well
well
Location Summary
Camp OverView
al Information Facilities
TOB TCHABI 0
https://www.google.com/maps/@0.976193,29.8764765,17z?entry=ttu Prefabs:
0°58'32,78" N 29°52'36,32"E Ablutions:
Government Tents:
8,993 Hardwall (m2):
TBC Other Structures:
t COE Disposal
Total
Junk Yard
12
Facilities
1M 3M 6M 10
- - -
- - - 8
25 - - 6
- - -
4
- - -
2
0
Total
COE Disposal
10
Broken Bed
8
Broken wooden Chairs
Sofa
6
Wooden Cupboard
0
Total
As et InUse
EQCB: Can ibalization / Scrap EQCB: Can ibalization / Scrap EQCB: Can ibalization / Scrap EQCB: Can ibalization / Scrap EQCB: Can ibalization / Scrap EQCB: Can ibalization / Scrap EQCB: Can ibalization / Scrap EQCB: Can ibalization / Scrap EQDE: Destruction / Scrap EQDE: Destruction / Scrap WATER EQDE: Destruction / Scrap WATER EQDE: Destruction / Scrap WATER EQDE: Destruction / Scrap WATER EQDN: Gift(Financial Rule EQDN: Gift(Financial Rule EQDN: Gift(Financial Rule EQDN: Gift(Financial Rule EQDN: Gift(Financial Rule EQDN: Gift(Financial Rule EQDN: Gift(Financial Rule EQDN: Gift(Financial Rule EQDN: Gift(Financial Rule
ELECTRICSUBMERSIBLE WATER SUBMERSIBLE WASTE WATER WATER PUMP 3 HP, 2.20KW WATER PUMPS, BO STER WATER PUMPS, ELECTRIC WATER PUMPS, SUBMERSIBLE WATER PUMPS, SUBMERSIBLE WATER PUMPS-BO STER- CAMERA PHOTO, RUG ED, MISC. EQUIPMENT MISC. EQUIPMENT, TURBIDIME- PUMPS, SOLAR PUMPING SYS- PUMPS, W/DIESEL ENGINE 105.23e) PORTABLE WATER LAB 105.23e) PREFAB AC OMMO- 105.23e) PREFAB AC OMMO- 105.23e) PREFAB AC OMMO- 105.23e) 105.23e) 105.23e) RENAULT/ 105.23e) RENAULT/ 105.23e) SOLAR WATER HEATING
PUMP (SEWAGE) PUMP, DE P WEL PUMP ELECTRIC, FLOW RATE WATERPRO F TR E TEM DATION BLDG, 1 MODULE DATION BLDG, 3 MODULE DATION BLDG, 6 MODULE RENAULT,Kerax,Water,210 0L, H RENAULT,Kerax,Water,90 0L, HD MAGYAR,Module,Water,120 0L MAGYAR,Module,Water,80 0L SYSTEM FOR 20 FE T
D,6x4 ,4x4
EQDN: Gift(Financial Rule EQDN: Gift(Financial Rule EQDN: Gift(Financial Rule EQDN: Gift(Financial Rule EQDN: Gift(Financial Rule EQDN: Gift(Financial Rule EQDN: Gift(Financial Rule EQDN: Gift(Financial Rule EQDN: Gift(Financial Rule EQDN: Gift(Financial Rule EQDN: Gift(Financial Rule EQDN: Gift(Financial Rule EQDN: Gift(Financial Rule EQDN: Gift(Financial Rule EQDN: Gift(Financial Rule EQDN: Gift(Financial Rule EQDN: Gift(Financial Rule EQDN: Gift(Financial Rule EQDN: Gift(Financial Rule EQDN: Gift(Financial Rule EQDN: Gift(Financial Rule EQDN: Gift(Financial Rule
105.23e) Tank:Water 105.23e) Tank:Water 105.23e) 105.23e) 105.23e) WASTEWATER PLANT 105.23e) WATER FILTRATION 105.23e) WATER MISC. 105.23e) WATER PUMP 105.23e) WATER PUMPS, 105.23e) WATER STORAGE 105.23e) WATER STORAGE 105.23e) WATER STORAGE 105.23e) WATER STORAGE 105.23e) WATER STORAGE 105.23e) WATER STORAGE 105.23e) WATER STORAGE SOFT, 105.23e) WATER STORAGE SOFT, 105.23e) WATER STORAGE SOFT, 105.23e) WATER STORAGE SOFT, 105.23e) WATER STORAGE SOFT, 105.23e) WATER STORAGE SOFT, 105.23e) WATER STORAGE SOFT,
Soft,Cln,20 0 L,Opn Tp Tank:Water,10 0 L,Ste l Tank:water,soft,blad er,40 0 L LABORATORY ANDREVERSE OSMOSIS EQUIPMENT, PHOTOMETER CENTRIFUGAL HARD, 10 ,0 0 LT, STE L HARD, 10 0 LTR, PLASTIC HARD, 10 0 LTR, STE L HARD, 230 0 LTR, STE L HARD, 40 0 LTR, STE L HARD, TANK 10 0 LTR, BLAD ER 10 0 LTR, OPEN TOP 20 0 LTR, OPEN TOP 250 0 LTR, BLAD ER 250 0 LTR, OPEN TOP 40 0 LTR, BLAD ER 50 0 LTR, BLAD ER
EQDN: Gift(Financial Rule EQDN: Gift(Financial Rule EQDN: Gift(Financial Rule EQDN: Gift(Financial Rule EQNR: No disposal required RE- EQNR: No disposal required EQSL: Sale Commercial BASIC EQSL: Sale Commercial EQSL: Sale Commercial EQSL: Sale Commercial EQSL: Sale Commercial POR- EQSL: Sale Commercial RE- EQSL: Sale Commercial Trtmt EQSL: Sale Commercial EQSL: Sale Commercial EQSL: Sale Commercial Water EQSL: Sale Commercial WATER EQSL: Sale Commercial WATER EQSL: Sale Commercial WATER EQSL: Sale Commercial WATER SCRP: Direct Disposal (Scrap as is)
105.23e) WATER STORAGE SOFT, 105.23e) WATER TANK, BLAD ER 105.23e) WATER TANK, BLAD ER 105.23e) WATERPRO F DIGITAL NAULT, M-1 T, MEDIUM, WATER WATER STORAGE SOFT WATER TREATMENT PLANT CONTAINERIZEDWASTE IVECO,Trak er,Water,20 0 L, HD, IVECO,Trak er,Water,90 0L, HD,4 TABLE WATER LAB NAULT,Kerax,Water,20 0 L, HD, Plnt:Wastewater Cntrsd Truck,Water,1Cab,HD,Diesel,LHD, WASTEWATER PLANT LABO- Bottling Sys DESALINATION UNIT FILTRATION ANDBOT LING FILTRATION ANDREVERSE PURIFIER Tank:Water,Cln,10 0 L
80 0 LTR, BLAD ER TYPE 10,0 0 LITERS TYPE 20,0 0 LITERS THEODOLITE TANK, 1 T WATER TREATMENT PLA 6x6 x2 6x6 6x6 R AT O R Y AS EMBLY OSMOSIS
1 GENERAL INFORMATION (as of May 2023)
b Location: https://www.google.com/maps/@0.976193,29.8764765,17z?entry=ttu
Size (m2):
Provincial
Camp to be handed over Land lord FARDC
Government
g to
2 FACILITIES
1M 3M 6M
a Prefabs: - - -
UNOE
f ISO Containers 3
3 PERIMETER PROTECTION
Capacity
d Water treatment: WTP: - WWTP:
COE
Capacity Number
i Industrial Incinerators - -
Capacity Number
j Smart ash incinerators - -
Capacity Number
k Bulb crushers - -
Capacity Number
l Shredders - -
5 POWER SUPPLY
29°52'36,32"E
Civilian:
-
Others
PNC RVA (EACRF /
SADC RF)
Other
5
UNOE/COE
Toilet
4
Quality
-
-
-
-
COE
5
Concertina
450
3
4
500 M NB New borehole desired
Treated water
Bladder
-
Capacity
1,000
UNOE/COE
Comments
w/ GI Sheet cover. Size unknown
-
-
City power
-
CAMP
Equipment Material Functional Loc. Description
NUC 66956 NUC 66956 Tchabi Tchabi
NUC 66978 NUC 66978 Tchabi Tchabi
NUC 66944 NUC 66944 Tchabi Tchabi
NUC 67002 NUC 67002 Tchabi Tchabi
NUC 67295 NUC 67295 Tchabi Tchabi
NUC 67296 NUC 67296 Tchabi Tchabi
NUC 67297 NUC 67297 Tchabi Tchabi
NUC 50698 NUC 50698 Tchabi Tchabi
NUC 67293 NUC 67293 Tchabi Tchabi
NUC 67359 NUC 67359 Tchabi Tchabi
NUC 67358 NUC 67358 Tchabi Tchabi
NUC 67357 NUC 67357 Tchabi Tchabi
NUC 67356 NUC 67356 Tchabi Tchabi
NUC 67360 NUC 67360 Tchabi Tchabi
NUC 80656 NUC 80656 Tchabi Tchabi
NUC 80653 NUC 80653 Tchabi Tchabi
NUC 80655 NUC 80655 Tchabi Tchabi
NUC 80654 NUC 80654 Tchabi Tchabi
NUC 80652 NUC 80652 Tchabi Tchabi
NUC-A-41689 NUC-A-41689 Tchabi Tchabi
NUC 81025 NUC 81025 Tchabi Tchabi
NUC 81024 NUC 81024 Tchabi Tchabi
NUC 81022 NUC 81022 Tchabi Tchabi
NUC 81021 NUC 81021 Tchabi Tchabi
NUC 80710 NUC 80710 Tchabi Tchabi
NUC 80606 NUC 80606 Tchabi Tchabi
NUC 80598 NUC 80598 Tchabi Tchabi
NUC 22354 NUC 22354 Tchabi Tchabi
Asset Type Rem. Useful Life Recommended Disposal Method
Lighting System
Lighting System
Lighting System
Lighting System
NGT Tents
NGT Tents
NGT Tents
NGT Tents
NGT Tents
NGT Tents
NGT Tents
NGT Tents
NGT Tents
NGT Tents
NGT Tents
NGT Tents
NGT Tents
NGT Tents
NGT Tents
Barcode Reader
NGT Tents
NGT Tents
NGT Tents
NGT Tents
Sea Container 20 Ft
Sea Container 20 Ft
Sea Container 20 Ft
Water Pump/Water Filtration
EQSL: Sale Commercial
EQNP Sale Nominal Price (Financial Rule 105.23e)
EQFV: Sale Fair Market Value (Financial Rule 105.23c)
EQDN: Gift (Financial Rule 105.23e)
EQFC: Contribution free of charge/Donation (Financia
SCRP: Direct Disposal (Scrap as is)
EQDE: Destruction / Scrap
EQCB: Cannibalization / Scrap
EQTI: Trade-in
EQNR: No disposal required
Disposal Deadline Physically Checked Y/N Current status
Y Not Functional (Need to Write Off)
Y Not Functional (Need to Write Off)
Y Not Functional (Need to Write Off)
Y Not Functional (Need to Write Off)
Y In Use
Y In Use
Y In Use
Y In Use
Y In Use
Y In Use
Y In Use
Y In Use
Y In Use
Y In Use
Y In Use
Y In Use
Y In Use
Y In Use
Y In Use
Y In Use
Y In Use
Y In Use
Y In Use
Y In Use
Y Not Use
Y Not Use
Y Not Use
Y In Use
Financial Rule 105.23e)
ue (Financial Rule 105.23c)
Y TCC
Y TCC
Y TCC
Y TCC
Y TCC
Completion deadline Comments
Material Description Qty Unit of Measure Recommended Disposal Method
Scrap Metal 4 Pcs Need Confirmation
Jerry can 5 Pcs Need Confirmation
Iron Bed 10 Pcs Need Confirmation
Used baterry 6 Pcs Need Confirmation
Drum 4 Pcs Need Confirmation
Iron 20 Pcs Need Confirmation
Zinc 10 Pcs Need Confirmation
Physically checked Y/N Current status Action to be taken Responsible
Yes (Presently in Use by repair) In camp Need Confirmation TCC
Yes (Presently in Use by repair) In camp Need Confirmation TCC
Yes (Presently in Use by repair) In camp Need Confirmation TCC
Yes (Presently in Use by repair) In camp Need Confirmation TCC
Yes (Presently in Use by repair) In camp Need Confirmation TCC
Yes (Presently in Use by repair) In camp Need Confirmation TCC
Yes (Presently in Use by repair) In camp Need Confirmation TCC
Completion deadline Comments
3/31/2024 None
3/31/2024 None
3/31/2024 None
3/31/2024 None
3/31/2024 None
3/31/2024 None
3/31/2024 None
Location Name Item Description Physically checked Y/N Current status
Y
Tchabi POL Management Treated
Y
Tchabi Solid Waste Treated
Tchabi SOAK PIT Y Treated
Tchabi Septic Tank Y Treated
Tchabi Drainage Y Treated
Action to be taken Responsible Completion deadline
Construct a compliant
workshop platform with
provisions TCC 1/28/2024
Construct a paved and roofed
waste collection point TCC 1/14/2024
Regular Sewage Collection FEO 1/28/2024
Regular Sewage Collection FEO 1/28/2024
Regular Cleaning FEO 1/28/2024
Comments
On progress
TOTAL CATEGORY
Buses
NIL
TOTAL CATEGORY
TOTAL CATEGORY
TOTAL CATEGORY
Trailer, Mesin Pemasang
1 WHEELED RF-01 JRIM 005 MT 1020 UN
Runflat Mobile
Trailors
TOTAL CATEGORY
Engineering
NIL
vehicles/equ
ipments
TOTAL CATEGORY
GENERATOR PORTABLE 5-15
1 ULD PG-04 KM190FD Y210113024
KVA
GENERATO
R AND WTP/ GENERATOR 20-30 kVA (20
2 ULD TG-04 17173129895
WATER kVA)
PUMP GENERATOR 76 – 100 kVA (80
3 ULD TG-16 R030988C
kVA=8, 100 kVA=2)
GENERATOR 76 – 100 kVA (80
4 ULD TG-18 R030984C
kVA=8, 100 kVA=2)
TOTAL CATEGORY
TOTAL CATEGORY
GRAND TOTAL UNIT:
DIMENSIONS
WEIGHT SURFACE VOLUME REMARK
Height (Square (Cubic S/Location
Lenght Width Height (Kilograms)
reduced metres) metres)
(Meters) (Metres) (Metres)
(Metres)
now
NIL
0.00 0.0 0.00
NIL
NIL