DEVELOPMENT CONTROL

ARCH 311 ARCHITECTURAL DESIGN 5


PREPARED BY: AR. JEFSIE M. ANTONIO, UAP
NBC Rule 7and 8
Rule 7 Building Occupancy
Rule 8. Light and Ventilation
SUMMARY OF FORMULAS:

Allowable Maximum Building Footprint (AMBF)


AMBF (Setback)= TLA - Yard Areas
AMBF (PSOmax)= VII.1/VIII.1 = PSO x TLA
AMBF (Open Space)= See LOT types

Percentage of Site Occupancy (PSO)


PSO= AMBF/TLA x 100

Allowable Maximum Volume of the Building (AMVB)


Initial AMVB = AMBF x BHL in Meters
Final AMVB = Initial AMVB – Volume Above the angular plane.
Total Open Space Within Lot (TOSL)
TOSL = TLA – PSO or TLA – AMBF
TOSL = ISA + USA

Minimum Unpaved Surface Area (USA)


USA = Table VIII.1
USA = Front yard areas
Maximum Impervious Surface Area (ISA)
ISA = Table VIII.1
ISA = TOSL – USA
ISA = rear and side yard areas
Maximum Allowable Construction Area (MACA)
MACA (%) = PSO (%) + ISA (%)
MACA (sq.m) = AMBF (sq.m) + ISA (sq.m)

Maximum Gross Floor Area (GFAmax)


GFA max = TLA x FLAR multiplier

Total Gross Floor Area (TGFA)


TGFA = GFA + NON GFA areas – courts and incremental setbacks
on all floors
TGFA/TLA = BHL (no. of storey) x PSO x TLA (VII.1)
TGFA/ GFA = GFA x multiplier (G.2)
TGFA = BHL (no. of storey) x AMBF – courts and incremental
setback on all floors.
ACRONYMS
TLA Total Lot Area
PSO Percentage of Site Occupancy
TOSL Total Open Space Within Lot
USA Unpaved Surface Area
ISA Impervious Surface Area
MACA Maximum Allowable Construction Area
BHL Building Height Limit
FLAR Floor to Lot Area Ratio
GFA Gross Floor Area
TGFA Total Gross Floor Area
AMBF Allowable Maximum Building Footprint
AMVB Allowable Maximum Volume of Building