You are on page 1of 7

BUILDING

DESIGN - 4699

PRELIM EXAM

Nino Benjamin A. Ledesma


CE-301 / 20638348
SITE DEVELOPMENT PLAN
VICINITY MAP
PLOTTING
COMPUTATION
Total Area (TLA) = 𝑾 𝟏 + 𝑫𝟏
= 13 x 17
ADDITIONAL
= 221 sq. m. INFORMATIONS

𝒀𝟏 = 3 x 13
1. Allowable Maximum Building Footprint
(AMBF under Rule VII) = 𝑊 2 + 𝐷2 = 39 sq. m.
= 12 x 9 𝒀𝟐 = 2 x 17
= 108 sq. m. = 34 sq. m.

2. Maximum Allowable 𝒀𝟑 = 2 x 13
Percentage of Site Occupancy (PSO) = 26 sq. m.
𝐴𝑀𝐵𝐹
PSO = 𝒀𝟒 = 2 x 12
𝑇𝐿𝐴
𝟏𝟎𝟖
= = 24 sq. m.
𝟐𝟐𝟏

= 49% +/- (of TLA)


3. Maximum Allowable
Impervious Surface Area (ISA)
= 𝑌2 + 𝑌3 + 𝑌4
CHECKING
= 34 + 26 + 24
= 84 sq. m.
= 30% +/- (of TLA) 7. Open Space within Lot

4. Maximum Allowable Construction Area (MACA) OSL = 𝒀𝟐 + (𝒀𝟐 + 𝒀𝟑 +


𝒀𝟒 )
MACA = PSO + ISA
= 39 +
= 49% + 30%
(34 + 24 + 26)
= 79% (of TLA)
=123 sq. m.
5. Minimum Unpaved Surface Area (USA) TOSL = USA + ISA
USA = 𝑌1
TOSL = 123 sq. m.
= 39 sq. m.
𝟏𝟐𝟑
= 𝟐𝟐𝟏
= 20% +/- (of TLA)
= 55% +/- (of TLA)
8. Total Lot Area
TLA = MACA + USA
= 79% + 20%
LAND TITLE
LAND TITLE

You might also like