CONTRACT NO.:
OS DOC NO: OS-SPM-CVX20001-1211-001 REV: B
69219
BASIS OF DESIGN
B Issued for Review / Approval 23.07.2020 Himanshu Sachan Akhilesh Bangre Manoj Chiral
A Issued for Review / Approval 30.04.2020 Himanshu Sachan Akhilesh Bangre Manoj Chiral
REV. DESCRIPTION DATE PREPARED BY CHECKED BY APPROVED BY
Table of Contents
CONTRACT NO.:
OS DOC NO: OS-SPM-CVX20001-1211-001 REV: B
69219
1. INTRODUCTION.........................................................................................................................5
1.1 Project Objectives......................................................................................................................5
1.2 Document Purpose.....................................................................................................................5
1.3 Location......................................................................................................................................5
2. DEFINITIONS & ABBREVIATIONS................................................................................................7
2.1 Definitions..................................................................................................................................7
2.2 Abbreviations.............................................................................................................................7
3. UNITS OF MEASUREMENTS.......................................................................................................9
4. CODES AND STANDARDS.........................................................................................................10
4.1 Order of Precedence................................................................................................................10
5. PROJECT OVERVIEW AND SCOPE OF WORK............................................................................10
5.1 Project Overview......................................................................................................................10
5.2 Pre-FEED Project Scope of Work..............................................................................................12
6. GENERAL BASIS OF DESIGN......................................................................................................13
6.1 Site Conditions and Environmental Data..................................................................................13
6.2 Design Life................................................................................................................................16
6.3 Design Capacities and Inlet Gas Specification..........................................................................16
6.4 Product Specification...............................................................................................................21
6.5 Design Margin..........................................................................................................................22
6.6 Plant Turndown and Availability...............................................................................................23
7. PROCESS DESIGN BASIS...........................................................................................................23
7.1 Gas Management Facility Design Basis.....................................................................................23
7.2 Process Design Considerations.................................................................................................35
7.3 Material Selection and Corrosion Allowance...........................................................................37
7.4 Sparing Philosophy...................................................................................................................37
7.5 Isolation Philosophy.................................................................................................................38
7.6 Black Start-up Philosophy.........................................................................................................38
8. INSTRUMENTATION AND CONTROL DESIGN BASIS.................................................................38
9. MECHANICAL DESIGN BASIS....................................................................................................39
9.1 Equipment................................................................................................................................39
UNCONTROLLED WHEN PRINTED OR TRANSMITTED ELECTRONICALLY Page 2 of 7
CHEVRON IRAQ (SARTA) LIMITED
SARTA 1A GAS MANAGEMENT – PRE‐FEED PROJECT
BASIS OF DESIGN
CONTRACT NO.:
OS DOC NO: OS-SPM-CVX20001-1211-001 REV: B
69219
CONTRACT NO.:
OS DOC NO: OS-SPM-CVX20001-1211-001 REV: B
69219
APPENDIX D
CONTRACT NO.:
OS DOC NO: OS-SPM-CVX20001-1211-001 REV: B
69219
CONTRACT NO.:
OS DOC NO: OS-SPM-CVX20001-1211-001 REV: B
69219
LPG Extraction Unit will be designed for the following product specifications;
Design output capacity : 85 Tons per day (including 10% margin)
Vapor Pressure : 115 -145 psi (@100 0F)
C5 & C5+ : ≤ 2% (vol%)
Sulfur content : 343 mg/m3 (max)
Free water : NIL
3. Heavy Condensate to EPF
Flowrate : XX bbl/d
Pressure : XX psig
Temperature : < 130 0F
Total C3 & C4 : ≤ XX % (vol%)