You are on page 1of 7

CHEVRON IRAQ (SARTA) LIMITED

SARTA 1A GAS MANAGEMENT – PRE‐FEED PROJECT


BASIS OF DESIGN

CONTRACT NO.:
OS DOC NO: OS-SPM-CVX20001-1211-001 REV: B
69219

BASIS OF DESIGN

B Issued for Review / Approval 23.07.2020 Himanshu Sachan Akhilesh Bangre Manoj Chiral
A Issued for Review / Approval 30.04.2020 Himanshu Sachan Akhilesh Bangre Manoj Chiral
REV. DESCRIPTION DATE PREPARED BY CHECKED BY APPROVED BY

Table of Contents

UNCONTROLLED WHEN PRINTED OR TRANSMITTED ELECTRONICALLY Page 1 of- 71


CLASS
CHEVRON IRAQ (SARTA) LIMITED
SARTA 1A GAS MANAGEMENT – PRE‐FEED PROJECT
BASIS OF DESIGN

CONTRACT NO.:
OS DOC NO: OS-SPM-CVX20001-1211-001 REV: B
69219

1. INTRODUCTION.........................................................................................................................5
1.1 Project Objectives......................................................................................................................5
1.2 Document Purpose.....................................................................................................................5
1.3 Location......................................................................................................................................5
2. DEFINITIONS & ABBREVIATIONS................................................................................................7
2.1 Definitions..................................................................................................................................7
2.2 Abbreviations.............................................................................................................................7
3. UNITS OF MEASUREMENTS.......................................................................................................9
4. CODES AND STANDARDS.........................................................................................................10
4.1 Order of Precedence................................................................................................................10
5. PROJECT OVERVIEW AND SCOPE OF WORK............................................................................10
5.1 Project Overview......................................................................................................................10
5.2 Pre-FEED Project Scope of Work..............................................................................................12
6. GENERAL BASIS OF DESIGN......................................................................................................13
6.1 Site Conditions and Environmental Data..................................................................................13
6.2 Design Life................................................................................................................................16
6.3 Design Capacities and Inlet Gas Specification..........................................................................16
6.4 Product Specification...............................................................................................................21
6.5 Design Margin..........................................................................................................................22
6.6 Plant Turndown and Availability...............................................................................................23
7. PROCESS DESIGN BASIS...........................................................................................................23
7.1 Gas Management Facility Design Basis.....................................................................................23
7.2 Process Design Considerations.................................................................................................35
7.3 Material Selection and Corrosion Allowance...........................................................................37
7.4 Sparing Philosophy...................................................................................................................37
7.5 Isolation Philosophy.................................................................................................................38
7.6 Black Start-up Philosophy.........................................................................................................38
8. INSTRUMENTATION AND CONTROL DESIGN BASIS.................................................................38
9. MECHANICAL DESIGN BASIS....................................................................................................39
9.1 Equipment................................................................................................................................39
UNCONTROLLED WHEN PRINTED OR TRANSMITTED ELECTRONICALLY Page 2 of 7
CHEVRON IRAQ (SARTA) LIMITED
SARTA 1A GAS MANAGEMENT – PRE‐FEED PROJECT
BASIS OF DESIGN

CONTRACT NO.:
OS DOC NO: OS-SPM-CVX20001-1211-001 REV: B
69219

9.2 Material of construction...........................................................................................................40


9.3 Skid packages...........................................................................................................................40
9.4 Pumps......................................................................................................................................40
9.5 Gas compressors......................................................................................................................41
9.6 Pressure Vessels.......................................................................................................................41
9.7 Sulfur Handling System............................................................................................................41
10. PIPING DESIGN BASIS...............................................................................................................42
10.1 Piping Design and Layout Arrangement...................................................................................42
11. CIVIL AND STRUCTURAL DESIGN BASIS....................................................................................42
11.1 Soil Information........................................................................................................................42
12. ELECTRICAL DESIGN BASIS.......................................................................................................43
12.1 Power Supply...........................................................................................................................43
12.2 Design Requirement.................................................................................................................43
13. HEALTH SAFETY AND ENVIRONMENTAL (HSE).........................................................................44
13.1 HSE Risk Management..............................................................................................................45
13.2 Environment Basis of Design....................................................................................................46
14. REFERENCES.............................................................................................................................47
APPENDIX A.....................................................................................................................................48
APPENDIX B.....................................................................................................................................52
APPENDIX C.....................................................................................................................................53

UNCONTROLLED WHEN PRINTED OR TRANSMITTED ELECTRONICALLY Page 3 of 7


CHEVRON IRAQ (SARTA) LIMITED
SARTA 1A GAS MANAGEMENT – PRE‐FEED PROJECT
BASIS OF DESIGN

CONTRACT NO.:
OS DOC NO: OS-SPM-CVX20001-1211-001 REV: B
69219

APPENDIX D

BASIS OF DESIGN – LPG EXTRACTION, STORAGE AND LOADING

UNCONTROLLED WHEN PRINTED OR TRANSMITTED ELECTRONICALLY Page 4 of 7


CHEVRON IRAQ (SARTA) LIMITED
SARTA 1A GAS MANAGEMENT – PRE‐FEED PROJECT
BASIS OF DESIGN

CONTRACT NO.:
OS DOC NO: OS-SPM-CVX20001-1211-001 REV: B
69219

BASIS OF DESIGN – LPG EXTRACTION, STORAGE AND LOADING

1. Feed to LPG Extraction Unit


Hydrocarbon condensates from DPCU Cold Separator (V-8301) outlet is fed to the LPG Extraction unit.
Following is the stream composition and the flow conditions at LPG Extraction Unit inlet;

Unit Summer Winter


Design Flow Rate lb/hr
Pressure psig
0
Temperature F
Composition
Water mol %
Nitrogen mol %
CO2 mol %
H2S mol %
Methane mol %
Ethane mol %
Propane mol %
i-Butane mol %
n-Butane mol %
i-Pentane mol %
n-Pentane mol %
n-Hexane mol %
C7* mol %
C8* mol %
C9* mol %
C10* mol %
C11* mol %
C12*+ mol %
Oxygen mol %
Total mol%

2. LPG Product Specifications


UNCONTROLLED WHEN PRINTED OR TRANSMITTED ELECTRONICALLY Page 5 of 7
CHEVRON IRAQ (SARTA) LIMITED
SARTA 1A GAS MANAGEMENT – PRE‐FEED PROJECT
BASIS OF DESIGN

CONTRACT NO.:
OS DOC NO: OS-SPM-CVX20001-1211-001 REV: B
69219

LPG Extraction Unit will be designed for the following product specifications;
Design output capacity : 85 Tons per day (including 10% margin)
Vapor Pressure : 115 -145 psi (@100 0F)
C5 & C5+ : ≤ 2% (vol%)
Sulfur content : 343 mg/m3 (max)
Free water : NIL
3. Heavy Condensate to EPF
Flowrate : XX bbl/d
Pressure : XX psig
Temperature : < 130 0F
Total C3 & C4 : ≤ XX % (vol%)

4. Process Design Basis and Description


NGL / Hydrocarbon condensate (rich in C3 & C4 components) from Gas / Liquid Exchanger is sent to
De-ethanizer column. Flash gas rich in C1 and C2 are separated from De-ethanizer top is sent to fuel
gas system for utilisation. De-ethaniser column is equipped with overhead partial condenser, which
utilise liquid propane received from DPCU and reflux drum. Condensed hydrocarbons from column is
used as reflux for De-ethanizer column.
De-ethanised hydrocarons from the De-ethaniser bottom is fed into the De-butanizer column for
rectification. C3 & C4 vapors (LPG components) from the top of the De-butanizer column is
condensed and subcooled upto XX0F using Debutanizer air cooler and sent to LPG reflux drum. LPG
reflux pumps supply a part of the liquefied gas into the de-butanizer top as column reflux and
transfer remaining product LPG to storage bullets for storage and truck loading.
Debutanizer bottom stream, which is rich in C5+ components is cooled to XX0F by Condensate air
cooler and then sent to EPF for mixing in Crude Storage Tanks.
LPG production of 85 T/day (including 10% design margin) will be stored in mounded bullets (2 nos),
which are sized to store 3 days production capacity with 90% filled volume.
Two number of LPG loading arms will be provided for truck loading. Each loading arm has dedicated
LPG metering package and a common odorant injection package. Design capacity of LPG loading
system will be based on daylight hours (6 hours effective loading time) loading operation. It is
envisaged that about 6 nos. of LPG trucks with 12 ton capacity each will be required for this
operation.

UNCONTROLLED WHEN PRINTED OR TRANSMITTED ELECTRONICALLY Page 6 of 7


CHEVRON IRAQ (SARTA) LIMITED
SARTA 1A GAS MANAGEMENT – PRE‐FEED PROJECT
BASIS OF DESIGN

CONTRACT NO.:
OS DOC NO: OS-SPM-CVX20001-1211-001 REV: B
69219

5. Design Changes on ‘GMF Base Design Case’ for LPG production


In order to enhance LPG production; following design changes from the ‘Base Case’ will be
considered;
- NGL from Cold Separator will be directy sent to LPG Unit in order to process colder
condensate in De-ethaniser column for efficient column operation. Accordingly, Gas-Liquid
Exchanger (SHE-XXX) will not be required for LPG case.
- Rich fuel gas for consumer will be supplied from De-ethaniser overhead, accordingly
Condensate heater (SHE-XXXX), Rich Fuel Gas Knock-out drum (V-XXXX) and Fuel gas
superheater (SHE-XXXX) will not be required for LPG design case.
- DPCU Propane Refrigeration System duty needs to be increassed to accommodate propane
requirement for De-ethaniser overhead condenser.
- Associated utilities, such as Steam Boiler, Boiler Feed Water shall be designed to
accommodate additional duty requirement.
- XXX

UNCONTROLLED WHEN PRINTED OR TRANSMITTED ELECTRONICALLY Page 7 of 7