You are on page 1of 4

Curriculum Vitae

Pramod Kumar
Phone : +91-8160254874, 7487089719
Email :Pramod77896@gmail.com

To associate with an esteemed organization that provides an opportunity to utilize skills, improve knowledge with latest
trends and be a part of the team that works dynamically towards the growth of the company.

❖ A ssistant Piping Engineer (Planning) 04 Mar 2016 to 03 Dec 2018.

ORGANIZATION: Simplex Infrastructure Ltd.


PROJECT SITE: Reliance Jamnagar Petrochemical Refinery Expansion J3 Project Gujarat.

Key Roles & Responsibilities:

 To develop required planning and scheduling tools to be used in the control and monitor.
 To monitor and report the status of project/activity.
 To identify the scope of Schedule activities.
 To monitor and coordinate the material, manpower and staff requirement at site work.
 To bridge communication gap among various department by providing supporting &
decision making data.
 To assist in resource leveling analysis.

 To identify material Tracking order (MTO) to operation in SAP. And also monitor and work on
RPMG.
 To identify interfaces which define activity sequences
 To identify, analyse as well as to justify delay in work which have potential impact on schedule.
 To assist in project execution plan, determine milestone to support project schedule.

❖ A ssistant Engineer (Planning & Billing) 06 Dec 2018 to 15 Dec 2019.

ORGANIZATION: - AL’MAUSER PETROLEIUM PVT.LTD (AMPS)


PROJECT:-IOCL, KOIYLI AHMADNAGAR SHOLAPUR PIPELINE (KASPL)

Roles & Responsibilities:

 To monitor and report the status of project/activity.



 To identify required planning and scheduling tools to be used in the control and monitor.

 To co-ordinate the material, manpower and staff requirement at site work.


 To develop various department by providing support & decision making data.

 To identify and update daily basis pipe book, tie-in chart and section detail.

 To Identify to Make Measurement sheet, SOR, MOP of Clint Bill & contractor Bill.

❖ Project Engineer (Planning & Billing). 22 Dec 2019 to 05 Nov 2020.

ORGANIZATION: - Naptune Powertech Energy Services PVT. LTD

PROJECT: Rageshwari Deep Gas, Barmer (Rajasthan)

CLINT:- Petrofac International Limited(PIULL) / CAIRN

Roles & Responsibilities:

 To develop required planning and scheduling tools to be used in the control and monitor.
 To monitor and report the status of project/activity.

 To monitor and coordinate the material, manpower and staff requirement at site work.
 To bridge communication gap among various department by providing
supporting & decision making data.
 To identify material Tracking order (MTO) to operation in AMOGH. And also monitor and
work on the same access.
 To assist in project execution plan, determine milestone to support project schedule.
 To Identify to Make Measurement sheet, SOR, MOP of Clint Bill & contractor Bill
 Good Experience in INTEGRATED GAS PROCESSING UNIT (IGPU), To complete all construction
work of above and underground piping work.

❖ Project Engineer (Planning & Billing) 21 Nov 2020 to Till Date

ORGANIZATION: - NANDINI IMPEX PVT. LTD


PROJECT: IOCL, PSHPL PIPELINE PROJECT (BALASORE, ODISHA)

Roles & Responsibilities:

 To monitor and report the status of project/activity.

 To identify required planning and scheduling tools to be used in the control and monitor.

 To co-ordinate the material, manpower and staff requirement at site work.

 To develop various department by providing support & decision making data

 To identify interfaces which define activity sequences

 To identify and update daily basis pipe book, tie-in chart and section detail.

 To Identify to Make Measurement sheet, SOR, MOP of Clint Bill & contractor Bill.
Percentage
Year(s) Qualification – Degree Board/University College/ Institute /CGPA

B E.
2016 RGPV-Bhopal SIRT-Bhopal 7.5
Mechanical Engineering

2012 XII (High Secondary) BPS- Bokaro CBSE-Board 60.00 %

2010 X ( High School) WMS- Dharbhanga CBSE-Board 7.4

ORGANIZATION: Matrix Fertilizer & Chemical Ltd.at Panagarh (W.B)

DURATION: 01-June-2015 to25-June-2015 TRAINING DESCRIPTION:

✓ Work with Gas turbine driven Process air compressor system.


✓ Synthesis gas compressor including its dry gas seal installation system.
✓ Ammonia refrigeration compressor including its dry gas seal installation kit process.
✓ Lean and Semi lean solution pumps process.
✓ Co2 Absorber, Unitized chiller, HP & LP flash drum, secondary reformer refractory lining including
its dry out unit process.
✓ Purifier and expander process.

• Software Skill: MS Project-2013, Primavera, MS Office-2013(Outlook, Word, Excel, PowerPoint)


• Operating Systems: Windows (2000/XP/7/8/10
• Date of Birth 17 May-1995
• Gender Male
• Nationality Indian
• Language Known English, Hindi
• Mobility Willing to relocate anywhere in India and overseas.
• Passport no. S3550624
• Permanent Address Jaynagar, Dist-Madhubani State-Bihar(Pin-847226)

I declare that the details above are correct and true to the best of my knowledge.

Pramod Kumar Date:

Place:

You might also like