You are on page 1of 1

LOG SHEET 1 – STAGE 1 (Weeks 1 to 6 incl)

All items are due on Group Journal page before the commencement of the Workshop time, unless noted
otherwise. In each case a Log Sheet mark only applies if the item concerned is:

a) Submitted within the required time


b) Considered by the project managers to be a meaningful attempt at the exercise
c) Student is physically present at the workshop
d) Submitted as PDFs, unless further instruction is given by your project managers.

If project managers cannot open a document then that document is deemed “not submitted”. What is
considered as “evidence” will be discussed in the prior week’s workshop for the relevant item.

Items / Activity Mark Week Log Sheet


Type Due Marks
Physical Attendance – Get into a group. Individual 1 5

Meeting Minutes (WPR). Group 2 5


Group information and team photo, with names and associated contact Group 2 5
details, uploaded to Wiki.

Meeting Minutes (WPR). Group 3 5


Signed set of team rules. Individual 3 5
Gantt chart covering key individual actions and tasks (this goes beyond Individual 3 5
just log sheet submissions) that make up Stage 1.
Background information provided within the Report template format Individual 3 5
(individual contributions to be named)
Stakeholder information provided within the Report template format Individual 3 5
(individual contributions to be named)

Meeting Minutes (WPR). Group 4 5


ITP Worksheets (Commitment) AND (Communication) (separate Individual 4 5
document not uploaded to Journal page).
Updated single Gantt Chart showing individual actions and tasks to the Individual 4 5
end of Stage 1. Individual workload, and relevant personal constraints
identified.
Individual Design Concept sketch(es) for consideration towards the Individual 4 5
Group’s selected Design Solution.
Evidence of the group’s progress in developing general CAD skills leading Group 4 5
to drawings required for the Design Package assignment.

Meeting Minutes (WPR). Group 5 5


ITP Worksheet (Capabilities - KSAs) (separate document not uploaded to Individual 5 5
Journal page).
Specification information provided within the Report template format Group 5 5

Meeting Minutes (WPR). Group 6 5


ITP Worksheets (Focus) AND (Standards) (separate document not Individual 6 5
uploaded to Journal page).
TEC information provided within the general Report template format Group 6 5
By midday of the Monday after the Stage 1 assignment is due: Group 6 5
Stage 1 Design Package is uploaded to Group’s wiki page.
100