EVM Calculation in Primavera P6
In this article, I would like to show you how EVM works in Primavera P6. This is a
very useful function in Primavera P6. But we need to work with it properly.
www.globalprojectcontrol.com Page 1 of 4
EVM Calculation in Primavera P6
The first setting item here is referred to as the contractual situation, I am going to
split it into three sections:
As you see in the above picture, we have two formulas for ETC calculation:
Remaining Cost for Activity (ETC) = remaining cost for the activity
OR
If I am going to select the second choice for ETC calculation, then I have 4 more
choices, you should use them based on the project situation and project thresholds,
I want to rename the above ETC calculation Technique to:
www.globalprojectcontrol.com Page 2 of 4
EVM Calculation in Primavera P6
2. PF=1/CPI
Based on the current Project Cost Performance Index (CPI), I want to name it
Realistic.
3. PF= 1 / (CPI * SPI)
Based on the current Project Cost Performance Index (CPI) and Schedule
Performance Index (SPI), I want to name it Pessimistic
4. PF= 0.88
Based on Expert Judgement
The next level of assumption on EVM calculation focuses on the project information
and situation, you can change the Assumption based on:
IMPORTANT NOTICE:
www.globalprojectcontrol.com Page 3 of 4
EVM Calculation in Primavera P6
• SPI and CPI calculate based on the actual cost value, so update your resource
carefully.
• You can select the ETC method for each WBS