KUWAIT
Reference:
1 Main contractor letter – M/s. WP Ayala
2 M/s. Al-Farooqi engineering consultant email
3 Note: Strengthen (by other)
March 2024
Page 1 of 6
Page 2 of 6
Page 3 of 6
Page 4 of 6
Page 5 of 6
Method Statement:
• Tools and Equipment
• Implementation steps
Marking cutting lines on wall (both side) as per approved
1 drawings. By Other
Main contractor is responsible of marking opening location.
Page 6 of 6