⮚ Further the VC meeting continued with RVNL/PMC/RBL and following points discussed,
Sl. No Pending items / Quality issues PDC Remarks
1 RGB Lighting
2 GRP perforated Cable tray issues
3 Trefoil Clamp for single core cable
4 VFD panel damaged during handling
(Mockup trail)
5 11kV HT Cable quality issues (MRC)
6 Earthing – 07 Nos earth pits excess
bottom plugging work rectification.
7 ACPL cables Type Test report for power
and control cables.
8 Finalization of Electrical contractor
without any delay
9 Proximity switch fixing Arrangement in
LS/CW/ hydraulic lock unit.
10 Rail Continuity and Lift span Earthing
11 Air Conditioner in Towers & building
12 Arranging VC with fire protection
system vendor
13 Availability of RBL engineer at site
14 Internet connection at PMC-TYPSA
Office