TURNING LINE TURNING LINE

MS PERGOLA WITH MS PERGOLA WITH


CEMENT FIBRE BOARD CEMENT FIBRE BOARD
TOP OF PYLON CLADDING ALL ROUND CLADDING ALL ROUND
LVL. +39550 TOP OF PERGOLA +36900 TOP OF PERGOLA +36900
2650

500
TOP OF PERGOLA LVL.+ 37500

LVL. +36900
800

LIFT MACHINE

600
MUMTY ROOF LVL.

2850
LVL. +36100 ROOM

2100
2800

LVL.+ 34650

3000
2425 MUMTY 1050

150
150

1350
FLAT BEAM
TERRACE LVL. +33300

LIFT LOBBY

4800
3750

3750
3600

3600
METAL GRID FALSE CEILING
3600

COR.

2700

WR
HOUSE 4-BEDDED 4-BEDDED 4-BEDDED 4-BEDDED 4-BEDDED 4-BEDDED 4-BEDDED 4-BEDDED
KEEPING HOSTEL ROOM HOSTEL ROOM HOSTEL ROOM HOSTEL ROOM HOSTEL ROOM HOSTEL ROOM HOSTEL ROOM HOSTEL ROOM
7TH. FLOOR LVL. +29700 TOILET
STORE

LIFT LOBBY
METAL GRID FALSE CEILING
3600

COR.
2700
HOUSE

WR
4-BEDDED 4-BEDDED 4-BEDDED 4-BEDDED 4-BEDDED 4-BEDDED 4-BEDDED 4-BEDDED
KEEPING
6TH. FLOOR LVL. +26100 TOILET STORE
HOSTEL ROOM HOSTEL ROOM HOSTEL ROOM HOSTEL ROOM HOSTEL ROOM HOSTEL ROOM HOSTEL ROOM HOSTEL ROOM

100
ALUMMINIUM LOUVERS LIFT LOBBY ALUMMINIUM LOUVERS
ALL ROUND AS/ELEVATION METAL GRID FALSE CEILING ALL ROUND AS/ELEVATION
3600

COR.
2700

2700
WR
HOUSE 4-BEDDED 4-BEDDED 4-BEDDED 4-BEDDED 4-BEDDED 4-BEDDED 4-BEDDED 4-BEDDED
KEEPING HOSTEL ROOM HOSTEL ROOM HOSTEL ROOM HOSTEL ROOM HOSTEL ROOM HOSTEL ROOM HOSTEL ROOM HOSTEL ROOM
5TH. FLOOR LVL. +22500 TOILET
STORE

LIFT LOBBY
METAL GRID FALSE CEILING
3600

COR.
2700

WR
HOUSE 4-BEDDED 4-BEDDED 4-BEDDED 4-BEDDED 4-BEDDED 4-BEDDED 4-BEDDED 4-BEDDED
KEEPING HOSTEL ROOM HOSTEL ROOM HOSTEL ROOM HOSTEL ROOM HOSTEL ROOM HOSTEL ROOM HOSTEL ROOM HOSTEL ROOM
4TH. FLOOR LVL. +18900 S TOILET
STORE
36300

LIFT LOBBY
H METAL GRID FALSE CEILING
3600

COR.
2700

HOUSE
WR

4-BEDDED 4-BEDDED 4-BEDDED 4-BEDDED 4-BEDDED 4-BEDDED 4-BEDDED 4-BEDDED


KEEPING
3ND. FLOOR LVL. +15300 TOILET STORE
HOSTEL ROOM HOSTEL ROOM HOSTEL ROOM HOSTEL ROOM HOSTEL ROOM HOSTEL ROOM HOSTEL ROOM HOSTEL ROOM
A
LIFT LOBBY
METAL
3600

F GRID
COR.
2700

FALSE
WR

HOUSE POT DISH DINING


CEILING
KEEPING KITCHEN
2ND. FLOOR LVL. +11700 TOILET FURNITURE ST. STORE
WASH WASH PANTRY (240 CAP.)

T FALSE CEILING
6600

1300

METAL GRID FALSE CEILING FALSE CEILING FALSE CEILING FALSE CEILING FALSE CEILING LIFT LOBBY
800

3000

3000

3000
COR. HOUSE STAGE
WR

STORE SERVICE
1ST. FLOOR LVL. +5100 L.TOILET G.TOILET KEEPING ROOM
1300

FALSE CEILING

METAL GRID FALSE CEILING


800
4200

3000

2500
WR

MACHINE SHOP AREA

2100
L.TOILET G.TOILET
PLINTH LVL. +900
900

GROUND LVL.
±00

A C D G H I J K L M N O P Q R S T U V W
O/O SENIOR ARCHITECT
(RK)-1, REGION KOLKATA
SECTION AT Y-Y'
PROPOSED BUILDING FOR MSME
AT BONHOOGLY, KOLKATA

WORKSHOP CUM G+7 BOYS' HOSTEL


WORKING DRAWING

SECTION AT A - A'
SA(RK)I/23(36)/MSME-BON/WBH/WD/09
: APRIL.2021 SCALE: 1:100

D.CHAKRABORTY B.GHOSH
ISSUED FOR CONSTRUCTION