Contract 2201-261 -Infrastructure Works at KEZAD,

Area B1 Phase 1A Package-1A1

Soil Settlement Calculations for Horizontal Directional Drilling (HDD) Works


- Khalifa Port & Industrial Zone Area B1-Phase-1A Infrastructure Development

1. STL HDD – 01: STREET LIGHT CABLE DUCT (AL WARQA STREET)

Estimated Road Settlement due to the installation of 2 no’s 110mm HDPE pipe bundle inside one borehole of 250mm by
HDD with minimum of 3.00m Depth under the asphalt road edge.
Settlement to road surface is calculated using formula:

Smax = VL
i√ 2 π

Where, Smax = Maximum Settlement


VL = volume loss as rational excavated volume of bore.
Do = Excavated diameter of bore hole. (250mm)
Zo = Depth of tunnel axis to the ground level. (3.125m)
i = Distance from bore centre to the point of inflection.
G/L

[Distance from point of


Inflexion to C/L of tunnel. 2 * 110mm HDPE PIPES

Centre Line of Tunnel

As per O'Reilly & ADM New Proposal, the relation between i and Zo for typical Granular / Non cohesive soil:
i = 0.28 Zo – 0.12
i = 0.28 x 3.125 – 0.12 = 0.875
Now,
Volume of Excavation = πd2 x L (Consider Unit Length, L=1m)

4
= π x (0.250)2 x 1

4
= 0.049 m3

Volume of Pipes = πd2 x L (Consider Unit Length, L=1m)


2*
4
= 3.14(.110)2 x 1
2*
4
= 0.019 m3

Now,
Volume loss (VL) = Vexc – VP
= 0.049 m3 – 0.019 m3
= 0.030 m3
Contract 2201-261 -Infrastructure Works at KEZAD,
Area B1 Phase 1A Package-1A1

Soil Settlement Calculations for Horizontal Directional Drilling (HDD) Works


- Khalifa Port & Industrial Zone Area B1-Phase-1A Infrastructure Development

Settlement Volume (VS) = Volume Loss (VL) x Loss %


= 0.030 m3 x 10/100 (Consider 10% Volume loss percentage)
= 0.003 m3

Now,
Smax = VS

√ 2π x 0.875

= 0.0030

√2 π x 0.875

= 0.001365 M
= 1.365 mm

Which is less than allowable 6mm


Contract 2201-261 -Infrastructure Works at KEZAD,
Area B1 Phase 1A Package-1A1

Soil Settlement Calculations for Horizontal Directional Drilling (HDD) Works


- Khalifa Port & Industrial Zone Area B1-Phase-1A Infrastructure Development

2. MCC HDD – 01: MCC DUCT (E11 HIGHWAY)

Estimated Road Settlement due to the installation of 9 no’s 90mm HDPE pipe bundle inside one borehole of 350mm by
HDD with minimum of 1.89m Depth under the asphalt road edge.
Settlement to road surface is calculated using formula:

Smax = VL
i√ 2 π

Where, Smax = Maximum Settlement


VL = volume loss as rational excavated volume of bore.
Do = Excavated diameter of bore hole. (350mm)
Zo = Depth of tunnel axis to the ground level. (2.065m)
i = Distance from bore centre to the point of inflection.
G/L

[Distance from point of


Inflexion to C/L of tunnel. 9 * 90mm HDPE PIPES

Centre Line of Tunnel

As per O'Reilly & ADM New Proposal, the relation between i and Zo for typical Granular / Non cohesive soil:
i = 0.28 Zo – 0.12
i = 0.28 x 2.065 – 0.12 = 0.458
Now,
Volume of Excavation = πd2 x L (Consider Unit Length, L=1m)

4
= π x (0.350)2 x 1

4
= 0.0962 m3

Volume of Pipes = πd2 x L (Consider Unit Length, L=1m)


9*
4
= 3.14(.09)2 x 1
9*
4
= 0.0572 m3

Now,
Volume loss (VL) = Vexc – VP
= 0.0962 m3 – 0.0572 m3
= 0.039 m3
Contract 2201-261 -Infrastructure Works at KEZAD,
Area B1 Phase 1A Package-1A1

Soil Settlement Calculations for Horizontal Directional Drilling (HDD) Works


- Khalifa Port & Industrial Zone Area B1-Phase-1A Infrastructure Development

Settlement Volume (VS) = Volume Loss (VL) x Loss %


= 0.039 m3 x 10/100 (Consider 10% Volume loss percentage)
= 0.0039 m3

Now,
Smax = VS

√ 2π x i

= 0.0039

√2 π x 0.458

= 0.00339 M
= 3.39 mm

Which is less than allowable 6mm


Contract 2201-261 -Infrastructure Works at KEZAD,
Area B1 Phase 1A Package-1A1

Soil Settlement Calculations for Horizontal Directional Drilling (HDD) Works


- Khalifa Port & Industrial Zone Area B1-Phase-1A Infrastructure Development

3. MCC HDD – 02: MCC DUCT (AL WARQA STREET)

Estimated Road Settlement due to the installation of 9 no’s 90mm HDPE pipe bundle inside one borehole of 350mm by
HDD with minimum of 3.00m Depth under the asphalt road edge.
Settlement to road surface is calculated using formula:

Smax = VL
i√ 2 π

Where, Smax = Maximum Settlement


VL = volume loss as rational excavated volume of bore.
Do = Excavated diameter of bore hole. (350mm)
Zo = Depth of tunnel axis to the ground level. (3.175m)
i = Distance from bore centre to the point of inflection.
G/L

[Distance from point of


Inflexion to C/L of tunnel. 9 * 90mm HDPE PIPES

Centre Line of Tunnel

As per O'Reilly & ADM New Proposal, the relation between i and Zo for typical Granular / Non cohesive soil:
i = 0.28 Zo – 0.12
i = 0.28 x 3.175 – 0.12 = 0.769
Now,
Volume of Excavation = πd2 x L (Consider Unit Length, L=1m)

4
= π x (0.350)2 x 1

4
= 0.0962 m3

Volume of Pipes = πd2 x L (Consider Unit Length, L=1m)


9*
4
= 3.14(.09)2 x 1
9*
4
= 0.0572 m3

Now,
Volume loss (VL) = Vexc – VP
= 0.0962 m3 – 0.0572 m3
= 0.039 m3
Contract 2201-261 -Infrastructure Works at KEZAD,
Area B1 Phase 1A Package-1A1

Soil Settlement Calculations for Horizontal Directional Drilling (HDD) Works


- Khalifa Port & Industrial Zone Area B1-Phase-1A Infrastructure Development

Settlement Volume (VS) = Volume Loss (VL) x Loss %


= 0.039 m3 x 10/100 (Consider 10% Volume loss percentage)
= 0.0039 m3

Now,
Smax = VS

√ 2π x i

= 0.0039

√2 π x 0.769

= 0.00202 M
= 2.02 mm

Which is less than allowable 6mm


Contract 2201-261 -Infrastructure Works at KEZAD,
Area B1 Phase 1A Package-1A1

Soil Settlement Calculations for Horizontal Directional Drilling (HDD) Works


- Khalifa Port & Industrial Zone Area B1-Phase-1A Infrastructure Development

4. HDD – 1A, HDD – 1B, HDD – 1C, HDD – 1D: 132 KV SPARE DUCTS (E311 HIGHWAY)
04 DRILLINGS

Estimated Road Settlement due to the installation of 5 no’s 200mm HDPE pipe bundle inside one borehole of 650mm by
HDD with minimum of 4.46m Depth under the asphalt road edge.
Settlement to road surface is calculated using formula:

Smax = VL
i√ 2 π

Where, Smax = Maximum Settlement


VL = volume loss as rational excavated volume of bore.
Do = Excavated diameter of bore hole. (650mm)
Zo = Depth of tunnel axis to the ground level. (4.785m)
i = Distance from bore centre to the point of inflection.
G/L

[Distance from point of


Inflexion to C/L of tunnel. 5 * 200mm HDPE PIPES

Centre Line of Tunnel

As per O'Reilly & ADM New Proposal, the relation between i and Zo for typical Granular / Non cohesive soil:
i = 0.28 Zo – 0.12
i = 0.28 x 4.785 – 0.12 = 1.22
Now,
Volume of Excavation = πd2 x L (Consider Unit Length, L=1m)

4
= π x (0.650)2 x 1

4
= 0.332 m3

Volume of Pipes = πd2 x L (Consider Unit Length, L=1m)


5*
4
= 3.14(.200)2 x 1
5*
4
= 0.157 m3

Now,
Volume loss (VL) = Vexc – VP
= 0.332 m3 – 0.157 m3
= 0.175 m3
Contract 2201-261 -Infrastructure Works at KEZAD,
Area B1 Phase 1A Package-1A1

Soil Settlement Calculations for Horizontal Directional Drilling (HDD) Works


- Khalifa Port & Industrial Zone Area B1-Phase-1A Infrastructure Development

Settlement Volume (VS) = Volume Loss (VL) x Loss %


= 0.285 m3 x 10/100 (Consider 10% Volume loss percentage)
= 0.0175 m3

Now,
Smax = VS

√ 2π x i

= 0.0175

√2 π x 1.22

= 0.00571 M
= 5.71 mm

Which is less than allowable 6mm


Contract 2201-261 -Infrastructure Works at KEZAD,
Area B1 Phase 1A Package-1A1

Soil Settlement Calculations for Horizontal Directional Drilling (HDD) Works


- Khalifa Port & Industrial Zone Area B1-Phase-1A Infrastructure Development

5. HDD – 2A, HDD – 2B, HDD – 2C: 132 KV SPARE DUCTS (E311 HIGHWAY)
03 DRILLINGS

Estimated Road Settlement due to the installation of 4 no’s 200mm HDPE pipe bundle inside one borehole of 500mm by
HDD with minimum of 5.39m Depth under the asphalt road edge.
Settlement to road surface is calculated using formula:

Smax = VL
i√ 2 π

Where, Smax = Maximum Settlement


VL = volume loss as rational excavated volume of bore.
Do = Excavated diameter of bore hole. (500mm)
Zo = Depth of tunnel axis to the ground level. (5.64m)
i = Distance from bore centre to the point of inflection.
G/L

[Distance from point of


Inflexion to C/L of tunnel. 4 * 200mm HDPE PIPES

Centre Line of Tunnel

As per O'Reilly & ADM New Proposal, the relation between i and Zo for typical Granular / Non cohesive soil:
i = 0.28 Zo – 0.12
i = 0.28 x 5.64 – 0.12 = 1.46

Now,
Volume of Excavation = πd2 x L (Consider Unit Length, L=1m)

= π x (0.500)2 x 1

4
= 0.1963 m3

Volume of Pipes = πd2 x L (Consider Unit Length, L=1m)


4*
4
= 3.14(.200)2 x 1
4*
4
= 0.1256 m3

Now,
Volume loss (VL) = Vexc – VP
Contract 2201-261 -Infrastructure Works at KEZAD,
Area B1 Phase 1A Package-1A1

Soil Settlement Calculations for Horizontal Directional Drilling (HDD) Works


- Khalifa Port & Industrial Zone Area B1-Phase-1A Infrastructure Development

= 0.1963 m3 – 0.1256 m3
= 0.0707 m3

Now,
Settlement Volume (VS) = Volume Loss (VL) x Loss %
= 0.0707 m3 x 10/100 (Consider 10% Volume loss percentage)
= 0.00707 m3

Now,
Smax = VS

√ 2π x i

= 0.00707

√2 π x 1.46

= 0.00193 M
= 1.93 mm

Which is less than allowable 6mm