Typical and Proposed

Electrical Drawings for Renovation of


Al-Qubba Water Project
- Safe and logical Interlock for the system is
required, the interlocking system is subject of
3×2×1×400mm XLPE 3×2×1×400mm2 XLPE end users approval.
- All Circuit Breakers, should be protected with
MFM MFM
V V
a protection relay, includes at least minimum
A A
PF
W
PF
W
protections required for the system,
HZ HZ
VAR VAR considering protection selectivity, The circuit
600-1200/5/5 A 600-1200/5/5 A measurements have to be monitored by digital

Protection Relay

Protection Relay
Is²t,n< Is²t,n<

for each panel

for each panel


U< CL1, 15-30 VA U< CL1, 15-30 VA
I2> I2>
3
I>/I>>
5P10, 15-30 VA 3
I>/I>>
5P10, 15-30 VA Multi- Function meters includes all necessary
51LR 51LR
U> U> readings, Both relays and multi- Function
meters should have facility to be connected
with SCS.
Voltage To Voltage To
- Alarm annunciation devices is required.
Voltage Bus1 Voltage Bus2 - 110 V DC supply Including two set of charger
U > U >

11000 110 110 11000 110 110


(230VAC /110VDC automatic chargers, can be
3 3 3 3 3 3
run in parallel, BOOST, Float and equalize
11 KV C.B 11 KV C.B
1250 A 1250 A charge ) with one set of 110VDC 185 AH
25 KA/3S Automatic/ Manual 25 KA/3S
batteries and a DC distribution panel with
11 KV, 2000 A, 25kA/3s Change over enough output MCCB's for supplying
INC F3 INC F4
BC BR TR11 TR12 protection, control, emergency lighting system
11 KV C.B
TR9 11 KV C.B
TR10 11 KV C.B 11 KV C.B
630 A
25 KA/3S
630 A
25 KA/3S 11 KV C.B
630 A
25 KA/3S
630 A
25 KA/3S
and signaling systems are required.
1250 A
MFM MFM
25 KA/3S
MFM MFM
- Size of current transformers, MCB's, wires and
V V MFM V V cables must be selected according to
A A A A
PF
W
HZ
PF
W
HZ
Same
600-1200/5/5
PF
W
HZ
PF
W
HZ
calculations, the calculations reports are
Voltage from CL1, 15-30 VA
VAR
Voltage from
VAR
Voltage from
Voltage Bus

I>
5P10, 15-30 VA
VAR
Voltage from
VAR
Voltage from subject of end user's approval.
300-150/5/5 Voltage Bus 300-150/5/5 Voltage Bus I > Voltage Bus2 Voltage Bus2
- Transducers have to be used for all measuring
Protection Relay

Protection Relay

Protection Relay

Protection Relay
CL1, 30-15 VA Is²t,n< CL1, 30-15 VA Is²t,n< Is²t,n< Is²t,n<
for each panel

for each panel

for each panel

for each panel


5P10, 30-15 VA U<
I2>
3
5P10, 30-15 VA U<
I2>
3
300-150/5/5
CL1, 30-15 VA
U<
I2>
3
300-150/5/5
CL1, 30-15 VA
U<
I2>
3
points.
I>/I>> I>/I>> I>/I>> I>/I>>
51LR
U>
51LR
U>
5P10, 30-15 VA 51LR
U>
5P10, 30-15 VA 51LR
U>
- Number of the panels, panels dimensions,
plate thickness, painting type and paint color
are subject of end users approval, selection
has to be carried out according to standards.
- All creepage's and clearances have to comply
with Standards.

2 2 2 2
3×1×150mm PVC 3×1×150mm PVC 3×1×150mm PVC 3×1×150mm PVC

Transformer are exist , No any rehabilitation is


required
TRANSFORMER TRANSFORMER TRANSFORMER TRANSFORMER
-TR9 GUARD SIGNAL -TR10 GUARD SIGNAL -TR10 GUARD SIGNAL -TR11 GUARD SIGNAL
11/0.4 kV HAVE TO BE 11/0.4 kV HAVE TO BE 11/0.4 kV HAVE TO BE 11/0.4 kV HAVE TO BE
(OFF+/-2.5% SENT TO (OFF+/-2.5% SENT TO (OFF+/-2.5% SENT TO (OFF+/-2.5% SENT TO
2.5MVA UPSTREAM 2.5MVA UPSTREAM 2.5MVA UPSTREAM 2.5MVA UPSTREAM
DYN11 DYN11 DYN11 DYN11

To Drawing No.: To Drawing No.: To Drawing No.: To Drawing No.:


DWG 002 /17 DWG 002 /17 DWG 002 /17 DWG 002 /17

AL-QUBBA WATER PROJECT U N


SECTION 6 LOW LIFT ROOM D P
PROPOSED SINGLE LINE DIAGRAM

APPROVED BY:

DRAWN BY: DRAWING No.: REV. No.:


DLSHAD HASAN MUHAMAD ALI DWG 001/17 Rev A
- Safe and logical Interlock for the system is
required, the interlocking system is subject of
end users approval.
- All Air Circuit Breakers (ACB), should be
protected with built in protection relay, includes
at least minimum protections required for the
From Drawing No.: From Drawing No.: From Drawing No.: From Drawing No.: system, considering protection selectivity, also
DWG 001 /17 DWG 001 /17 DWG 001 /17 DWG 001 /17 relays should have facility to be connected
with SCS.
- Alarm annunciation devices is required.
3x(1x150)mm² 3x(1x150)mm² 3x(1x150)mm² 3x(1x150)mm² - 110 V DC supply Including two set of charger
Cu, XLPE Cu, XLPE Cu, XLPE Cu, XLPE
(230VAC /110VDC automatic chargers, can be
TRANSFORMER TRANSFORMER TRANSFORMER TRANSFORMER
run in parallel, BOOST, Float and equalize
-TR9
11/0.4 kV
GUARD SIGNAL
HAVE TO BE
-TR10
11/0.4 kV
GUARD SIGNAL
HAVE TO BE
-TR11
11/0.4 kV
GUARD SIGNAL
HAVE TO BE
-TR12
11/0.4 kV
GUARD SIGNAL
HAVE TO BE
charge ) with one set of 110VDC 185 AH
(OFF+/-2.5%
2.5MVA
SENT TO
UPSTREAM
(OFF+/-2.5%
2.5MVA
SENT TO
UPSTREAM
(OFF+/-2.5%
2.5MVA
SENT TO
UPSTREAM
(OFF+/-2.5%
2.5MVA
SENT TO
UPSTREAM
batteries and a DC distribution panel with
DYN11 DYN11 DYN11 DYN11 enough output MCCB's for supplying
protection, control, emergency lighting system
LOW LIFT STATION and signaling systems are required.
400 V, 6000A 400 V, 6000A
- Size of bus duct, current transformers, ACB's,
3*(10*1*240mm2)
+(1*8*1*240mm2)
3*(10*1*240mm2)
+(1*8*1*240mm2)
BUS DUCT
3PHASE + N
BUS DUCT
3PHASE + N
MCCB's, MCB's, wires and cables must be
PVC cable PVC cable
selected according to calculations, the
calculations reports are subject of end user's
2A 2A 2A 2A
approval.
MFM
P2
MFM
P2
MFM
P2
MFM
P2 - Flexible connection between Bus duct and
5000/5A
transformers has to be provided for
A,V,W, A,V,W, A,V,W, A,V,W,
VAR,Hz 5000/5A VAR,Hz 5000/5A VAR,Hz 5000/5A VAR,Hz

I> I> I> I>


I>>
Io> 5000/5A
I>>
Io> 5000/5A I>>
Io> 5000/5A I>>
Io>
5000/5A maintenance purpose.
Io>> Io>> Io>> Io>>
P1 P1 P1 P1 - Transducers have to be used for all measuring
ACB ACB ACB ACB
points.
-Q01
5000A
-Q02
5000A
-Q03
5000A
-Q04
5000A
- Number of the panels, panels dimensions,
ACB ACB
3 Pole
-QBC1
3 Pole
-QBC2
3 Pole ACB
-QBC3
3 Pole
plate thickness, painting type and paint color
M 5000A M 5000A M
BB1:400VAC,5000A, 30kA/1s
M
3 Pole M 3 Pole M
5000A
3 Pole
M are subject of end users approval, selection
has to be carried out according to standards.
MCCB, QF17, 100A

MCCB, QF18, 100A

MCCB, QF19, 100A

MCCB, QF20, 100A


ACB, QF1, 1250 A

ACB, QF2, 1250 A

ACB, QF3, 1250 A

MCCB, QF5, 160A

MCCB, QF6, 160A

MCCB, QF7, 160A


MCCB, QF4, 160 A

MCCB, QF13, 100A

MCCB, QF14, 100A

MCCB, QF15, 100A

MCCB, QF16, 100A

MCCB, QF21, 40A

MCCB, QF22, 40A

MCCB, QF23, 40A

MCCB, QF24, 40A

MCB, QF25, 32A

MCB, QF44, 32A

- All creepage's and clearances have to comply


MCB, QF25, 32A

MCB, QF25, 32A

M M M
with Standards.

PE

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 1 23 1 23 1 23

SAME AS BUS BAR 1 SAME AS BUS BAR 1 SAME AS BUS BAR 1

ACB
-QBC4
5000A
M 3 Pole

AL-QUBBA WATER PROJECT U N


SECTION 6 LOW LIFT LOW VOLTAGE ROOM D P
PROPOSED SINGLE LINE DIAGRAM

APPROVED BY:

DRAWN BY: DRAWING No.: REV. No.:


DLSHAD HASAN MUHAMAD ALI DWG 002/17 Rev A
11 kV Switchgear room 11 kV Switchgear room
- Safe and logical Interlock for the system is
is out of scope is out of scope required, the interlocking system is subject of
end users approval.
- All Air Circuit Breakers (ACB), should be
protected with built in protection relay, includes
at least minimum protections required for the
From Drawing No.: From Drawing No.: From Drawing No.: From Drawing No.:
DWG 005 /17 G INC 1 DWG 005 /17 G INC 2 DWG 005 /17 G INC 3 DWG 005 /17 G INC 4 system, considering protection selectivity, also
relays should have facility to be connected
with SCS.
- Alarm annunciation devices is required.
3x(1x150)mm² 3x(1x150)mm² 3x(1x150)mm² 3x(1x150)mm² - 110 V DC supply Including two set of charger
Cu, XLPE Cu, XLPE Cu, XLPE Cu, XLPE
(230VAC /110VDC automatic chargers, can be
TRANSFORMER TRANSFORMER TRANSFORMER TRANSFORMER
run in parallel, BOOST, Float and equalize
-TR1
11/0.4 kV
GUARD SIGNAL
HAVE TO BE
-TR2
11/0.4 kV
GUARD SIGNAL
HAVE TO BE
-TR3
11/0.4 kV
GUARD SIGNAL
HAVE TO BE
-TR4
11/0.4 kV
GUARD SIGNAL
HAVE TO BE
charge ) with one set of 110VDC 185 AH
(OFF+/-2.5%
2.5MVA
SENT TO
UPSTREAM
(OFF+/-2.5%
2.5MVA
SENT TO
UPSTREAM
(OFF+/-2.5%
2.5MVA
SENT TO
UPSTREAM
(OFF+/-2.5%
2.5MVA
SENT TO
UPSTREAM
batteries and a DC distribution panel with
DYN11 DYN11 DYN11 DYN11 enough output MCCB's for supplying
protection, control, emergency lighting system
and signaling systems are required.
400 V, 5000A 400 V, 5000A 400 V, 5000A 400 V, 5000A
- Size of bus duct, current transformers, ACB's,
BUS DUCT
3PHASE + N
BUS DUCT
3PHASE + N
BUS DUCT
3PHASE + N
BUS DUCT
3PHASE + N
MCCB's, MCB's, wires and cables must be
selected according to calculations, the
calculations reports are subject of end user's
2A 2A 2A 2A
approval.
MFM
P2
MFM
P2
MFM
P2
MFM
P2 - Flexible connection between Bus duct and
5000/5A
transformers has to be provided for
A,V,W, A,V,W, A,V,W, A,V,W,
VAR,Hz 5000/5A VAR,Hz 5000/5A VAR,Hz 5000/5A VAR,Hz

I> I> I> I>


I>>
Io> 5000/5A
I>>
Io> 5000/5A I>>
Io> 5000/5A I>>
Io>
5000/5A maintenance purpose.
Io>> Io>> Io>> Io>>
P1 P1 P1 P1 - Transducers have to be used for all measuring
ACB ACB ACB ACB
points.
-Q01
5000A
-Q02
5000A
-Q03
5000A
-Q04
5000A
- Number of the panels, panels dimensions,
ACB ACB
3 Pole
-QBC1
3 Pole
-QBC2
3 Pole ACB
-QBC3
3 Pole
plate thickness, painting type and paint color
M 5000A M 5000A M
BB1:400VAC,5000A, 30kA/1s
M
3 Pole M 3 Pole M
5000A
3 Pole
M are subject of end users approval, selection
has to be carried out according to standards.
ACB, QF1, 1250 A

ACB, QF2, 1250 A

ACB, QF3, 1250 A

MCCB, QF10, 160A

MCCB, QF11, 160A

MCCB, QF12, 160A

MCCB, QF13, 100A

MCCB, QF14, 100A

MCCB, QF15, 100A

MCCB, QF16, 100A


MCCB, QF5, 250A

MCCB, QF6, 250A

MCCB, QF7, 250A

MCCB, QF8, 250A

MCCB, QF9, 160A


ACB, QF4, 1250 A

MCCB, QF17, 100A

MCCB, QF18, 100A

MCCB, QF19, 100A

MCCB, QF20, 100A

MCB, QF21, 40A

MCB, QF22, 40A

MCB, QF23, 40A

MCB, QF24, 40A

MCB, QF25, 32A

MCB, QF44, 32A - All creepage's and clearances have to comply


M M M M
with Standards.

PE

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 -------------- 44 1 44 1 44 1 44
TWENTY (20) UNITS
SAME AS BUS BAR 1 SAME AS BUS BAR 1 SAME AS BUS BAR 1

ACB
-QBC4
5000A
M 3 Pole

AL-QUBBA WATER PROJECT U N


SECTION 2 HIGH LIFT PUMP STATION LV ROOM D P
PROPOSED SINGLE LINE DIAGRAM

APPROVED BY:

DRAWN BY: DRAWING No.: REV. No.:


DLSHAD HASAN MUHAMAD ALI DWG 003/17 Rev A
11 kV Switchgear room 11 kV Switchgear room - Safe and logical Interlock for the system is
is out of scope is out of scope required, the interlocking system is subject of
end users approval.
- All Air Circuit Breakers (ACB), should be
protected with built in protection relay, includes
at least minimum protections required for the
From Drawing No.: From Drawing No.: From Drawing No.: From Drawing No.:
DWG 005 /17 G INC 8 DWG 005 /17 G INC 7 DWG 005 /17 G INC 6 DWG 005 /17 G INC 5 system, considering protection selectivity, also
relays should have facility to be connected
with SCS.
- Alarm annunciation devices is required.
3x(1x150)mm² 3x(1x150)mm² 3x(1x150)mm² 3x(1x150)mm² - 110 V DC supply Including two set of charger
Cu, XLPE Cu, XLPE Cu, XLPE Cu, XLPE
(230VAC /110VDC automatic chargers, can be
TRANSFORMER TRANSFORMER TRANSFORMER TRANSFORMER
run in parallel, BOOST, Float and equalize
-TR8
11/0.4 kV
GUARD SIGNAL
HAVE TO BE
-TR7
11/0.4 kV
GUARD SIGNAL
HAVE TO BE
-TR6
11/0.4 kV
GUARD SIGNAL
HAVE TO BE
-TR5
11/0.4 kV
GUARD SIGNAL
HAVE TO BE
charge ) with one set of 110VDC 185 AH
(OFF+/-2.5%
1000KVA
SENT TO
UPSTREAM
(OFF+/-2.5%
1000KVA
SENT TO
UPSTREAM
(OFF+/-2.5%
2.5MVA
SENT TO
UPSTREAM
(OFF+/-2.5%
2.5MVA
SENT TO
UPSTREAM
batteries and a DC distribution panel with
DYN11 DYN11 DYN11 DYN11 enough output MCCB's for supplying
protection, control, emergency lighting system
and signaling systems are required.
EXIST EXIST EXIST - Size of bus duct, current transformers, ACB's,
3*(5*1*240mm2)
+(1*4*1*240mm2) MCCB's, MCB's, wires and cables must be
PVC cable
selected according to calculations, the
calculations reports are subject of end user's
Gravity Pressure 2A
approval.
MFM
P2 - Transducers have to be used for all measuring
points.
A,V,W,
VAR,Hz 1600/5A
I>
I>>
Io> 1600/5A - Number of the panels, panels dimensions,
Io>>
P1 plate thickness, painting type and paint color
To Apartment No any To Filter Pressure No any rehabilitation is required
are subject of end users approval, selection
ACB
-Q01 rehabilitation is required has to be carried out according to standards.
2000A
3 Pole
- All creepage's and clearances have to comply
BB1:400VAC,2000A, 30kA/1s
M with Standards.
MCCB, QF35, 100A
MCCB, QF20, 100A
MCCB, QF19, 250 A
MCCB, QF2, 250 A
ACB, QF1, 1600 A

MCB, QF67, 32A


MCB, QF60,32A
MCB, QF52, 40A

MCB, QF59, 40A

PE

1 2 19 20 51 52 59 60 67
Eighteen (18)Units Thirty Two (32)Units Eight (8)Units Eight (8)Units

AL-QUBBA WATER PROJECT U N


SECTION 3,4 &5 L.V. GRAVITY FILTER ROOM D P
PROPOSED SINGLE LINE DIAGRAM

APPROVED BY:

DRAWN BY: DRAWING No.: REV. No.:


DLSHAD HASAN MUHAMAD ALI DWG 004/17 Rev A
- Safe and logical Interlock for the system is
Generators, Transformers Generators, Transformers required, the interlocking system is subject of
and power cables are out and power cables are out end users approval.
of scope - Generator 11 kV C.B. should have electrical
of scope
-G1 -G2-3 -G4 -G5 -G6-7 -G8
interlock with related national grid C.B. and
Automatic/ Manual changeover control should
be provided.
- All Circuit Breakers, should be protected with
a protection relay, includes at least minimum
protections required for the system,
-TR1
0.4/11 kV
TRANSFORMER
GUARD SIGNAL
-TR2-3
0.4/11 kV
TRANSFORMER
GUARD SIGNAL
-TR4
0.4/11 kV
TRANSFORMER
GUARD SIGNAL
-TR5
0.4/11 kV
TRANSFORMER
GUARD SIGNAL
-TR6-7
0.4/11 kV
TRANSFORMER
GUARD SIGNAL
-TR8
0.4/11 kV
TRANSFORMER
GUARD SIGNAL
considering protection selectivity, The circuit
(OFF+/-2.5%
2.5MVA
HAVE TO BE
SENT TO
(OFF+/-2.5%
2.5MVA
HAVE TO BE
SENT TO
(OFF+/-2.5%
2.5MVA
HAVE TO BE
SENT TO
(OFF+/-2.5%
2.5MVA
HAVE TO BE
SENT TO
(OFF+/-2.5%
2.5MVA
HAVE TO BE
SENT TO
(OFF+/-2.5%
2.5MVA
HAVE TO BE
SENT TO
measurements have to be monitored by digital
DYN11 UPSTREAM DYN11 UPSTREAM DYN11 UPSTREAM DYN11 UPSTREAM DYN11 UPSTREAM DYN11 UPSTREAM Multi- Function meters includes all necessary
readings, Both relays and multi- Function
meters should have facility to be connected
2 2 2 2 2 2
with SCS.
3×1×120mm PVC, OR 3×1×120mm PVC, OR 3×1×120mm PVC, OR 3×1×120mm PVC, OR 3×1×120mm PVC, OR 3×1×120mm PVC, OR
2
3×1×150mm PVC
2
3×1×150mm PVC
2
3×1×150mm PVC
2
3×1×150mm PVC
2
3×1×150mm PVC
2
3×1×150mm PVC - Alarm annunciation devices is required.
- 110 V DC supply Including two set of charger
G-INC 1 G-INC 2 - 3 G-INC 4 G-INC 5 G-INC 6-7 G-INC 8 (230VAC /110VDC automatic chargers, can be
run in parallel, BOOST, Float and equalize
11000
3
110
3
11000
3
110
3
11000
3
110
3
11000
3
110
3
11000
3
110
3
11000
3
110
3
charge ) with one set of 110VDC 185 AH
11 KV D.S. 11 KV D.S. 11 KV D.S. 11 KV D.S. 11 KV D.S. 11 KV D.S. batteries and a DC distribution panel with
630 A 630 A 630 A 630 A 630 A 630 A
25 KA/3S 25 KA/3S 25 KA/3S 25 KA/3S 25 KA/3S 25 KA/3S enough output MCCB's for supplying
25 kA/3s
1000A Bus bar
25 kA/3s
1000A Bus bar
25 kA/3s
1000A Bus bar
25 kA/3s
1000A Bus bar
25 kA/3s
1000A Bus bar
25 kA/3s
1000A Bus bar
protection, control, emergency lighting system
V,A,PF,W, V,A,PF,W, V,A,PF,W, V,A,PF,W, V,A,PF,W, V,A,PF,W,
and signaling systems are required.
Hz,VAR.. Hz,VAR.. Hz,VAR.. Hz,VAR.. Hz,VAR.. Hz,VAR..
- Size of current transformers, MCB's, wires and
Multi-Function Multi-Function Multi-Function
Meter
300-150/5/5A
Meter
300-150/5/5A
Meter
300-150/5/5A 300-150/5/5A 300-150/5/5A 300-150/5/5A cables must be selected according to
CL1,30-15 VA CL1,30-15 VA CL1,30-15 VA CL1,30-15 VA CL1,30-15 VA CL1,30-15 VA
5P10,30-15 VA 5P10,30-15 VA 5P10,30-15 VA 5P10,30-15 VA 5P10,30-15 VA 5P10,30-15 VA calculations, the calculations reports are
I>/I>>
Io>/Io>>
I>/I>>
Io>/Io>>
I>/I>>
Io>/Io>>
I>/I>>
Io>/Io>>
I>/I>>
Io>/Io>>
I>/I>>
Io>/Io>>
subject of end user's approval.
Protection Relay Protection Relay Protection Relay Protection Relay Protection Relay Protection Relay
- Transducers have to be used for all measuring
for each panel for each panel for each panel for each panel for each panel for each panel
points.
- Number of the panels, panels dimensions,
plate thickness, painting type and paint color
are subject of end users approval, selection
has to be carried out according to standards.
11 KV C.B
630 A
11 KV C.B
630 A
11 KV C.B
630 A
11 KV C.B
630 A
11 KV C.B
630 A
11 KV C.B
630 A
- All creepage's and clearances have to comply
25 KA/3S 25 KA/3S 25 KA/3S 25 KA/3S 25 KA/3S 25 KA/3S with Standards.

2 2 2 2 2 2
3×1×120mm PVC, OR 3×1×120mm PVC, OR 3×1×120mm PVC, OR 3×1×120mm PVC, OR 3×1×120mm PVC, OR 3×1×120mm PVC, OR
2 2 2 2 2 2
3×1×150mm PVC 3×1×150mm PVC 3×1×150mm PVC 3×1×150mm PVC 3×1×150mm PVC 3×1×150mm PVC
To Drawing No.: To Drawing No.: To Drawing No.: To Drawing No.: To Drawing No.: To Drawing No.:
DWG 003 /17 DWG 003 /17 DWG 003 /17 DWG 004 /17 DWG 004 /17 DWG 004 /17
-TR 1 -TR 2 -3 -TR 4 -TR 5 -TR 6-7 -TR 8

AL-QUBBA WATER PROJECT U N


SECTION 7 GENERATOR'S & G-SWITCHGEAR ROOM D P
PROPOSED SINGLE LINE DIAGRAM

APPROVED BY:

DRAWN BY: DRAWING No.: REV. No.:


DLSHAD HASAN MUHAMAD ALI DWG 005/17 Rev A