You are on page 1of 5

Retic manual valve process

At the final inspection the owners showed me the Retic, its a manual valve set up,
running through the bore.

The process.

1. Turn Valve to open which relates to 1 retic station you want to run.
2. Press the Bore Pump button ON(which then switches on the bore, to pump the
water that section of the garden).
3. After 15min you then open the next valve, and close the first valve,So its waters
the next retic station. and continue through the remaining valves.
4. Once finished you can open the first valve(Ready for next use), and close the rest
the switch the Bore Pump Off.

Note: if the all valves remain closed while bore is running may damage the bore pump.

Retic runs via opening Retic valve and pressing ON bore pump on side wall.

Valve (A) rear garden bed (A valve photos shows the valve and location)
Turn vale on. Then press ON switch on Bore controller (P).
Valve (B) rear garden and other side of fence (B valve photos shows the valve and
location)
Turn valve on. Then press ON switch on Bore controller (P).
Valve (C) (behind Bore further valve from. Bore) (C and D valve photos shows the valve
and location)
front side garden behind fence
Turn vale on. Then press ON switch on Bore controller (P).

Valve (D) (behind Bore nearest valve from. Bore) (C and D valve photos shows the valve
and location)
front side garden
Turn vale on. Then press ON switch on Bore controller (P).

Tap (T) powered by Bore. (T Tap/lever photos shows the tap/lever and location)
Turn valve on. Then press ON switch on Bore controller (P).
NOTE: Don’t have all OFF valve and turn on bore pump or it will burn out pump.

Screens shot shows location of values, pump, etc.