Professional Documents
Culture Documents
Before start to the purifier NO.1, Make sure that the oil pipes, operating water pipes, and air pipes
are correctly connected and that the joints are firmly tightened.
Check to the lubrication oil in the gear case. This oil quantity shoul be confirmed with the oil gauge.
Make sure that the primary pressure of compressed air supply pressure is between 5 and 7 bars.
Make sure that the brake is in the non-braking position.
Make sure the direction of revolution. Turn on the starter. Start the motor and stop it simultaneously
(within 3 seconds) and check that the rotating direction of the motor or horizontal shaft is the same
as the arrow n the SELFJECTOR frame.
Set the power switch of the Multi-Monitor to ON, and check that all the switches in the Multi -
Monitor are in proper positions and necessary memory preset items/values are correctly set.
Stopping procedure;
Push the AUTO STOP button on the automatic control panel.
Turn the heater off.
After making sure the purifier comletely stops, close both the feed inlet and outlet valve. Close
sludge discharge valve. Also make sure that the other valves and cocks are closed.
Turn power switches OFF in order of the Multi-Monitor, automatic control panel and starter.